A kitchen package that comes back with the wrong finish is one of the most expensive rework items in a residential fit-out. Lacquer is unforgiving: once the doors and carcasses are sprayed, colour and sheen cannot be adjusted on site. Writing the two tone lacquer cabinets specification properly at brief stage is what keeps sampling, pricing and production moving in one pass instead of three.
The notes below follow the way we take a project from enquiry to shipment as an one-stop furniture and building materials supplier, so you can copy the same structure straight into your own procurement brief.
1. Name the two tones, do not just say "two tone"
"Two tone" describes a combination, not a finish. In the brief, split the specification into the parts that will actually be sprayed:
- Tone A — which elements carry it (tall cabinets, island, wall units), and the colour reference for each.
- Tone B — the remaining runs, plus whether the two tones meet on a visible return or are separated by a room opening.
- Sheen per tone — gloss level is decided separately for each colour. A deep tone at high reflection behaves very differently from the same tone at low reflection under kitchen downlights.
- Substrate and edge treatment — door profile, edge banding or sprayed edges, and how cut-outs for appliances are finished.
Our Lacquer Kitchen Cabinet range is made to measure, so the split between tones is set at drawing stage rather than chosen from a fixed module. The matte lacquer and high gloss lacquer pages show how the same cabinet family reads at different reflection levels — useful when you want to place one tone against the other.
2. Put the finish decision before the layout decision
Most teams send a layout first and choose colour later. For lacquer, reverse it. Sheen changes how cabinet lines read: a high reflection surface shows every shadow line between doors, while a low reflection surface softens them. That affects handle choice, door gaps and whether a run looks continuous or segmented.
| Brief item | What to write down |
|---|---|
| Tone map | Marked plan showing which cabinets are Tone A and which are Tone B, including the tall larder and appliance housing. |
| Colour reference | Brand and code where one exists; otherwise a physical sample plus the room's lighting condition. Screen colours are not an acceptable reference for sprayed finishes. |
| Reflection level | Stated per tone, with a note on the light source above each run. |
| Interface details | Worktop edge reveal, splashback junction, scribe to ceiling, and how the two tones meet at a corner. |
| Hardware | Hinge type, drawer runner load, integrated or surface handle, and any push-to-open runs. |
3. Ask for a sprayed sample, not a colour card
A printed card cannot reproduce a lacquered surface. Request a small sprayed panel in both tones, delivered before the order is placed, and check it in the actual kitchen under its daytime and evening light. Approve it in writing with a sample number and date. That record protects you on every later batch.
4. Fix the dimensions and quantities you can defend
Made-to-measure cabinetry only works when the site information is reliable. Send the finished floor level, the setting-out drawing, ceiling heights at each run, and the position of waste, water and power outlets. Then list quantities by run, not as one total for "kitchen". Splitting tall units, wall units, base units and the island lets us quote each tone and each detail separately, and it makes partial delivery possible when site phases differ.
5. Cover the commercial and logistics lines
The rest of the brief should be as specific as the finish section:
- Target delivery window per phase, and the port or site address for door-to-door delivery.
- Packing standard — panel protection, corner guards, and how doors are separated in the crate.
- Who signs off the production drawings after we issue them, and by what date.
- Site access for installation, and who carries out fitting if it is not our team.
- Snag list process and the spare-parts route for handles and hinges.
As a China furniture manufacturer for global projects, we handle this documentation as part of the order: production coordination, packing lists, freight arrangement and shipment tracking sit with one coordinator rather than across several vendors.
6. Read back the brief before it goes to production
Run a short check against the approved sample and the marked plan: two tones mapped, reflection stated per tone, sprayed sample signed, dimensions confirmed by a site survey, quantities split by run, hardware listed, delivery address fixed. If any line is missing, resolve it now — after spraying starts, colour changes mean new doors.