Sliding doors look simple on a drawing and complicated on site. Before a purchase order is raised for Santerson Wooden Sliding Doors, procurement teams should walk through six risk areas: opening tolerance, hardware compatibility, finish confirmation, packing and freight damage, site readiness at handover, and the written specification that governs every one of them.
Made-to-measure joinery is unforgiving. A hinged door can be adjusted on site with shims and hinges; a sliding door runs on a track, and once the track is fixed, small errors become visible gaps, binding panels or doors that no longer reach their stops. That is why the risk review happens at the ordering stage, not at the installation stage.
1. Confirm Openings Against Finished Floor and Ceiling Levels
The most expensive sliding door problem is rarely the door. It is the opening. Panel height depends on the finished floor level, and top clearance depends on the finished ceiling or head condition. If tiling, screed, flooring or skirting is still provisional when the order is placed, the heights you measured will not be the heights on site.
Before ordering, require a single coordinated drawing that states finished floor levels, finished ceiling levels, opening width and height, wall build-up, and the position of any recess or reveal. Every dimension for wooden sliding doors should be taken from that drawing, not from a tape measure on a bare slab.
Opening checklist before the purchase order
- Finished floor and ceiling levels confirmed in writing by the builder or fit-out contractor.
- Opening width and height given as minimum, nominal and maximum, with a note on which value governs.
- Wall build-up and substrate described, including what the track and skirting fix to.
- Reveal, pocket or surface-mounted arrangement stated, plus clearance for the panel stack when open.
- Position of switches, sockets, air grilles and sprinkler heads checked against the panel travel path.
2. Match the Track and Hardware to the Actual Panel
Sliding door hardware is a system: track, hangers, bottom guide, stops, handles and lock keep all have to suit the panel weight, thickness and travel. A panel that is heavier or thicker than assumed needs different hangers; a floor recessed track needs a floor detail that was built for it.
Ask which hardware set is specified for each opening, who supplies it, and whether it ships in the same consignment. If your project uses a flush sliding door detail where the panel finishes against the wall plane, confirm the recess depth, pocket lining and header detail before production, because those conditions are set by the walls, not by the door.
| Item to specify | Why it becomes a risk |
|---|---|
| Panel thickness and core construction | Determines hanger load rating and bottom guide type; wrong parts mean sagging or stiff travel. |
| Track type: surface, recessed or ceiling-hung | A recessed track needs a floor channel cast or built to the right depth and level. |
| Number of panels and stacking direction | Panel stack requires clear wall; furniture or glazing often blocks it later. |
| Handle, lock keep and accessibility pulls | Aperures and lock bodies must be machined in the factory, not on site. |
| Finish system and sheen | Sample approval prevents a whole batch being rejected for tone or sheen mismatch. |
3. Lock Down the Finish Before Production Starts
Wood finishes are where visual disputes start. Grain figure, stain penetration and sheen vary with the board, so an approved physical sample is worth more than a colour code in a specification. Request a signed-off sample panel for each finish, keep it on site, and record the date and reference against the order.
Where doors sit next to cabinetry or wall panelling, put them in one specification package so that veneer species, grain direction and sheen are decided together. Santerson's wooden sliding door wardrobes and wooden sliding panels are configured the same way, with made-to-measure sizing and selectable material and finish options, so coordinating doors, wardrobes and panels in one enquiry usually produces a more consistent interior and fewer separate shipments.
Santerson Wooden Sliding Doors are made to project-specific dimensions and finish selections; the surrounding wall and floor conditions must be fixed before production.
4. Plan Packing, Freight and Inspection for Long Panels
Full-height panels are the items most often damaged in international freight. Corner chips, crushed edges and warped panels are hard to replace quickly once a project is on site, and replacement reopens the delivery schedule.
Freight risk controls
- Require edge protection, vertical racking or flat-packed sleeved panels, and moisture barrier for sea freight.
- Ask for a packing list that identifies every panel by opening reference, so site teams can match doors to rooms.
- Photograph and log any damage at the point of receipt, against the packing list references.
- Confirm which items are spare hardware versus panels, so spares are not thrown away with packaging.
Santerson's logistics service covers freight forwarding by sea, air and rail, customs paperwork, container loading and door-to-door delivery. Even with a door-to-door arrangement, your own receiving inspection is the control that protects the schedule, so assign it to a named person before the container arrives.
5. Make Sure the Site Is Ready Before the Doors Arrive
Sliding doors should be one of the last trades on site. If wet works, painting or flooring still need to happen after delivery, panels get stored in corridors and damaged. Build a simple sequence into the programme: openings accepted, floor levels confirmed, wall finishes complete, hardware delivered, then doors installed and adjusted.
Agree in writing who installs and who adjusts. Where installation support is part of the package, confirm scope for your site before ordering, along with what happens if a panel needs adjustment after handover. Santerson lists installation, inspection and snagging, warranty coverage, spare parts and maintenance under its installation and after-sales support service; the practical step is to record which of those apply to your order.
6. Put One Written Specification in Charge
Most disputes trace back to a specification that was scattered across emails. A clean procurement pack for sliding doors contains: the coordinated opening drawing, a door schedule listing each opening reference with size, panel count, stacking direction and hardware set, the approved finish sample reference, the packing list format, and the named responsibilities for delivery, storage, installation and snagging.
If your enquiry also covers built-in storage or wall systems, group them under one turnkey project solution enquiry so that dimensions, finishes and delivery windows are coordinated once instead of three times. For bespoke details, the custom and OEM service covers custom design and prototyping alongside material and finish selection, which is where non-standard panel sizes or integrated handles get resolved before production.
Verification note: dimensions, material choices, hardware sets, finishes and the scope of delivery and installation support must be confirmed for each individual project. Site conditions, local building requirements and import terms are the responsibility of the project team and should be checked with your own consultants.
A Short Pre-Order Review That Saves Rework
Before signing, one hour of review answers the questions that cause rework: Are the openings measured from finished levels? Is the hardware set specified per opening and included in the shipment? Has a physical finish sample been signed off? Is the packing method stated for long panels? Is there an installed, snagged and handed-over record for each door? Teams that treat Santerson Wooden Sliding Doors as a coordinated system of opening, track, panel and finish, rather than as a catalog item, almost never see the failures described above.