A clear glass aluminum frame wardrobe looks simple on a rendering: slim metal profile, transparent panel, built-in box behind it. In procurement it is one of the less forgiving items to order from overseas, because glazing, frame finish and case dimensions all have to agree before production starts. This article walks through how OEM sourcing for this product actually runs at SANTERSON, stage by stage, from your drawing pack to the container.
What "OEM" Means for a Wardrobe Order
Two buying models are commonly mixed under one word. In the first, you buy our design: you choose a model from our catalogue, such as the Clear Glass Aluminum Frame Wardrobes in our Glass & Aluminum Frame Wardrobes collection, and we build it to your room dimensions. In the second, you buy your own design: your studio or brand supplies the elevation drawings, the profile section, the glass specification and sometimes your own hardware, and we manufacture to that pack under your brand. Our Custom & OEM Service covers both, including bespoke finishes, prototyping, private labelling and packaging.
For project buyers — villa developers, joinery contractors, hotel fit-out teams — the second model is usually the reason a wardrobe is sourced from a factory rather than bought locally. You are not paying for a showroom range; you are paying for a shop that can hold your specification across several bathrooms and bedrooms, and ship it with the rest of the interior package.
Stage 1: The Drawing Pack You Need to Send
Most delays in this category come back to an incomplete enquiry, not to the factory floor. Before a quotation can be issued for an OEM wardrobe run, we need:
- Elevations per room. Overall width, height and depth for each unit, plus which units are identical and which differ. A single villa often has six to ten variants; list them by room code.
- Profile section and finish. The aluminium frame profile you want — slim square, slim rectangular, or a profile from your own extrusion drawing — and the surface treatment: anodised, powder-coated or wood-grain transfer, with a colour reference such as a RAL code or a physical sample.
- Glass specification. Clear tempered glass is the default in this collection; frosted, bronze and smoked versions of the same frame are also available if you want one system with two visual effects across a corridor. State the glass thickness your local installation expects and whether the panels need drilled holes for handles or stays.
- Case material and interior layout. Carcase board type and colour, shelf heights, hanging zones, drawers, lighting provisions. Interior layout is where end-user complaints usually originate, so it deserves its own drawing rather than a note in an email.
- Interface conditions. Floor finish build-up height, whether the unit sits on a finished floor or a plinth, ceiling level tolerance, skirting removal, and access for sliding panels if the room is tight.
If you do not have drawings yet, our interior design service can work from room dimensions and reference images: space planning, concept boards, 3D renderings and then production coordination. That route takes longer but avoids the situation where a joinery detail is invented on site.
Stage 2: Quotation and Detail Confirmation
Once the pack is complete, we return an itemised quotation with unit price by model, tooling or profile cost if your frame section is new, packaging method and freight options. Our cooperation steps are fixed at this point: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up.
Three items in the quotation deserve a line-by-line check before you sign:
| Item | What to verify |
|---|---|
| Frame profile | Section drawing matches your elevation; finish code is written, not implied by a photograph. |
| Glass | Type, thickness, tempering, edge treatment, and whether panels are supplied loose or pre-fitted. |
| Carcase board | Board type, colour code, edge banding colour, moisture-resistant board for rooms next to bathrooms. |
| Hardware | Hinges, slides, hanging rails and any integrated lighting: brand or model, load rating, who supplies it. |
| Packaging | Flat-pack or assembled, carton marking by room code, spare panel allowance for glass in transit. |
| Delivery terms | Port or door, Incoterms, and who handles import clearance at destination. |
Stage 3: Prototyping, Then the Production Run
For a first OEM run of a new frame section or a new glass-and-frame combination, we prototype before committing the full quantity. The sample is checked against your approved drawings for profile joints, panel fit, door alignment and hardware positions. Only after that sign-off does the balance go into production, which is where our own manufacturing keeps the whole interior package under one roof — wardrobes alongside custom bedroom wardrobes, kitchen cabinetry, doors and panelling, so the same colour codes travel across rooms.
Minimum order quantities are flexible rather than fixed, which matters for villa and small apartment work: a project may need eight wardrobes rather than eight hundred. Confirm the quantity you actually have on site; MOQ is agreed per project, not applied as a standing rule.
Stage 4: Packing, Freight and Arrival
Glass and aluminium frames need different packing logic than soft goods. Wardrobes ship flat-packed with the frame sections protected at the mitred corners and glazing crated separately or panel-protected, marked by room code so the site team can unload in the right sequence. Our logistics service covers sea, air and rail freight forwarding, commercial invoices, packing lists, certificates of origin, container loading plans and door-to-door delivery.
For an Australian project — our published cases include villa work in Willoughby, North Turramurra, Sydney and Perth — decide early whether you are taking the container to port or all the way to site. Import duty, clearance and any local conditions sit with your broker unless the delivery scope says otherwise, so get the Incoterms written into the same document as the production order.
Stage 5: Installation and What Happens After
A clear glass wardrobe is unforgiving once installed: misaligned sliding panels show, and a frame out of plumb shows through the glass. Our installation support covers on-site fitting guidance, inspection and snag lists, plus spare parts and replacement for damaged panels. Where your own fitters do the work, we provide assembly drawings and can guide them before the first unit goes up.
How to Keep an OEM Wardrobe Order on Schedule
- Freeze room dimensions before glass is ordered. A 10 mm change in ceiling height changes every panel in the run.
- Group your enquiries by collection, not by room. One frame system across several bedrooms costs less than three systems at one unit each.
- Name the finish with a code, and keep the approved sample until handover — it is what settles colour disputes.
- Order one complete unit ahead of the batch when the detail is new. A prototype costs far less than a re-run.
- Book freight against the production completion date you were given in writing, not the date you hoped for.
If your project needs this wardrobe family specified to your drawings — clear, frosted, bronze or smoked glass in the same aluminium frame — send the elevations and we will quote the run as part of a wider interior package rather than as an isolated item. As a one-stop furniture and building materials supplier, SANTERSON handles the wardrobes, cabinetry, doors and finishes for a project under one production and delivery plan.
Send your drawings to us. Room elevations, frame finish reference and glass choice are enough to start. We reply with an itemised quotation, sample options and a production schedule for your site.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com | Factory: Longjiang, Shunde, Foshan, China