A swim spa quotation is only useful when it prices the exact vessel, equipment set and site conditions you intend to build. The two model codes below are sold on one product page, so the first line of your request for quote has to say which one you want. Here is what a serious buyer sends so that Outdoor Swim Spa WS-S08T1 / WS-S08T2 can be quoted without three rounds of clarification.
Start with the model code, not the category
WS-S08T1 and WS-S08T2 share a product page in our swimming pool range, and the catalog lists them with the same overall envelope of 7800 x 2200 x 1500 mm. That single dimension is the number your architect, deck builder and local authority all work from, so state it in the request and ask us to confirm it for the model you have chosen. Where a specification detail changes between the two codes, we note it on the quotation line rather than burying it in a footnote.
If your site cannot take a 7.8 m vessel, say so at the outset and ask to be shown alternative lengths in the same range instead of assuming the shell can be cut to fit.
State how the spa will be used
The equipment fitted to this vessel already covers two different jobs, and your usage pattern decides which ones carry weight:
- Swim training. The catalog specification shows one swim training system for the length of the shell. Tell us whether the spa is for daily laps, resistance walking and physiotherapy, or occasional family use, because that determines how much clear water length you need to protect.
- Hydrotherapy. Fifty jets are listed in total, with two water pumps and one filter pump. Send the jet layout you want relative to seating benches and the deep relaxation end, and flag any therapy requirement, such as a target zone for the lower back or calves.
- Ambience and night use. Four LED lights plus twenty-eight small LED lights are listed. Confirm whether you want them on separate circuits so colour and brightness can be staged.
List the options you expect to be priced
The catalog lists control system, UV sterilization, water pumps, heat pump, sand filtration, insulation and steps as options. Availability and compatibility vary by model, so a request for quote that simply says "with heater" invites an answer that does not match your climate or your tariff. For each option give us the reason behind it:
| Option | What to state in the request |
|---|---|
| Heat pump | Target water temperature, months of use, whether the spa sits outdoors year-round, and your local electricity supply details. |
| Insulation | Whether the vessel is above ground, semi-recessed or fully recessed, and the ambient winter temperature at the site. |
| UV sterilization | Water treatment preference alongside ozone, which is shown as a standard feature on this listing. |
| Sand filtration | Whether you want it in place of the listed filter pump arrangement, and where the plant room or equipment bay will sit. |
| Steps | Access side, deck height, and whether steps are fixed or integrated into the surrounding platform. |
| Water pumps | Number and duty, since two water pumps are already listed and additional pumps change the electrical load. |
Total power is listed at 9.55 kW for the catalog configuration. Treat that as the base case only: heat pump, extra pumps and lighting circuits change the load, so attach your available supply capacity, phase and breaker arrangement to the request rather than asking us to guess it.
Attach the site conditions
Every line item on a swim spa quotation becomes wrong if the civil side is unknown. Include in the same email:
- A plan or sketch of the terrace, deck or garden position, with clear access routes from the delivery point to the final location.
- Deck or slab loading information and whether the structure has been checked for a full vessel.
- Drainage, overflow route and the location of any equipment access panel you need to keep reachable.
- Electrical run length from the supply to the control system, and who is responsible for that run in your contract split.
- Local permit or inspection requirements, so we can supply the drawings and documentation your authority asks for.
Set out delivery, installation and after-sales responsibility
We are a China-based manufacturer of furniture and building materials working as a one-stop supplier for project buyers, with freight forwarding by sea, air and rail, customs paperwork, container loading and door-to-door delivery among the services we list. For a swim spa, state in the request which of those you want us to handle and where your own contractor takes over. A useful split covers:
- Incoterms and destination, including port or site address and whether heavy lifting or a crane is needed on arrival.
- Packaging standard for the shell, cabinet and glass or acrylic components, and any spare parts you want shipped in the same container.
- On-site installation, inspection and snag list: who performs it, and which items sit with your civil and electrical trades.
- Warranty scope, spare parts supply and maintenance support, with the terms confirmed in writing for your specific configuration.
Project buyers who also specify outdoor furniture, pergolas, patio and poolside collections, bathroom ceramics, lighting or wall and ceiling finishes in the same package often ask us to coordinate those items with the spa delivery. Mention this early; a combined shipment and one coordination contact usually removes several handover dates from the programme.
A checklist you can paste into your enquiry
Request for quote: Outdoor Swim Spa WS-S08T1 / WS-S08T2
- Model code required, and confirmation of catalog dimensions 7800 x 2200 x 1500 mm for that model.
- Quantity, project name and site location.
- Intended use: swim training, hydrotherapy, family leisure, or a hospitality facility.
- Options to price: control system, UV sterilization, water pumps, heat pump, sand filtration, insulation, steps.
- Water treatment expectation alongside the listed ozone feature; jet and lighting circuit preferences.
- Electrical supply available on site (capacity and phase) against the 9.55 kW catalog figure.
- Site drawings, access route, structural check, drainage and equipment access details.
- Delivery terms, destination, lifting requirements and packaging expectation.
- Installation, snag inspection, warranty, spare parts and maintenance responsibility.
- Any related items to be coordinated in the same shipment.
What a complete request should produce from us
With the information above supplied once, the reply you receive should be readable without a follow-up call. Expect:
- A priced line for the vessel itself under the model code you named, with any difference between WS-S08T1 and WS-S08T2 stated explicitly.
- Each option on its own line, so items you drop later do not change the base price of the shell.
- The confirmed equipment list for your configuration: control system, swim training system, pumps, jets, lighting and water treatment.
- Electrical requirements for that configuration, rather than only the catalog power figure.
- Delivery terms to your destination, with the packaging standard and any lifting requirement identified.
- A clear statement of what we install, what your trades install, and which documents we provide for approval.
If a reply leaves any of those six points out, send it back before you circulate prices internally. Quotations that omit the equipment list are the most common reason a swim spa line item changes after order placement.
Send it once, compare like for like
When two suppliers price the same information, differences stop being about price alone and start revealing what is actually included. That is the point of a complete request: the quotation you receive should be comparable line by line, with options separated rather than folded into one figure.
Send your specification to our team
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Office: Longjiang, Shunde, Foshan, China. Enquiries receive a response within 24 hours.