A media wall that mixes open shelving with closed cabinets looks simple on a mood board and complicated on site. Cables appear, dimensions stop matching the room, and finishes arrive that do not sit well beside the joinery already specified for the rest of the villa. The Santerson Open & Closed Combo Units are configurable, which is why the buying conversation needs a checklist rather than a single product code. Below is the sequence our project team works through with buyers, designers and contractors before a configuration is quoted.
In short: confirm the wall, then the storage split, then the technical interfaces (electrical, appliance, floor and ceiling), then finish and hardware, then logistics and installation. Every item below should end up on one configuration sheet, not scattered across e-mails.
1. Start With the Wall, Not the Unit
Open and closed combination units are made to measure for each space, so the room governs everything that follows. Before choosing a layout, collect:
- Finished floor level and finished ceiling height at several points along the wall, not one spot, because slab and screed heights vary along a run.
- The clear distance to door openings, switches, radiators and return air grilles.
- Wall construction: masonry, stud partition or an existing substrate. A full-height configuration needs a fixing method suited to what is behind the plasterboard.
- Squareness of the wall. An out-of-plumb wall changes scribe widths and how an integrated panel meets adjacent joinery.
Send us the room drawing or a site survey with those figures. If several built-in items in a villa or apartment come from one order, we work from the same drawings for the whole group so heights, reveals and material batches stay consistent.
2. Decide the Open-to-Closed Split Room by Room
The split is a storage decision before it is a styling one. Write down what has to live in the unit: consoles and set-top boxes, games, books, glassware, documents and seasonal items. Then decide which of those you want visible.
- Open niches and shelves suit display pieces and daily-use items. They show dust and cables, so keep them away from sightlines where equipment sits.
- Closed cabinets hide the clutter that makes a living room look untidy in photographs: chargers, spare media, paperwork and children's toys.
- Glass-front sections sit between the two: contents are visible but protected. See Santerson Glass Front Media Units when display is the priority.
Where one wall has to carry both storage and display, buyers usually compare three related configurations instead of a single product: Santerson Mixed Open & Closed Systems for modular living arrangements, Santerson Mixed Open & Closed Storage when the unit becomes an integrated wall, and Santerson Storage & Display Combo for media-wall layouts. Tell us which direction fits the drawing and we quote against that.
3. Lock Down Dimensions and the TV or Appliance Interface
This is where most re-quotes happen. Put these numbers in writing before production starts:
| Item to confirm | Why it matters |
|---|---|
| Screen size and mounting method | Wall-mounted or supported by the unit changes the internal carcass, the backing panel and the load path. |
| Device list and shelf depths | Consoles, soundbars and receivers have different depths; a shelf that is too shallow leaves devices protruding. |
| Ventilation for enclosed equipment | Closed compartments trap heat. Specify where air enters and leaves if equipment sits behind doors. |
| Cable routes | Decide the position of grommels or cut-outs, and whether cables drop behind the panel or run to a floor box. |
| Remote-control path | If devices sit behind doors, confirm how they will be operated. Infrared needs a clear path or a repeater. |
| Base detail | Plinth, recessed toe-kick or floating. This must match the skirting and floor finish already specified. |
If you want lighting in the open sections, Santerson Integrated LED Media Units is the configuration to discuss. We then need driver location, switching and any dimming requirement before the carcass is cut.
4. Specify Finish, Material and Hardware Explicitly
Finish, layout and dimensions are all specified per project, so the specification sheet has to be as precise as the drawing. Decide:
- Door construction: slab, handleless or a shaker profile, and whether the doors match other cabinetry in the same building.
- Surface: matte, high gloss, wood veneer or textured laminate. For projects with many units across several rooms, request material samples before sign-off rather than judging from screen images.
- Interior finish of open niches and closed cabinets, including edge banding and shelf thickness.
- Hardware: hinge type, soft close, drawer runners, push-to-open or handles. Record the brand or model you expect so substitutions are not made silently.
Our custom furniture design and prototyping service covers bespoke finishes, textures and samples, so if the unit has to match an existing colour or grain, send the reference sample or the project finish code with the enquiry.
5. Confirm What Is Included in the Quote
Configurable listings such as these do not carry a fixed technical sheet, so read the quotation line by line and check that these items are stated:
- The measured dimensions of every module and the total wall run.
- Materials and finishes for carcass, doors, shelves and back panels.
- Hardware schedule and any lighting with its electrical details.
- Packaging and protection for transit, especially for gloss and veneer components.
- What is excluded: on-site electrical connection, wall preparation, floor boxes, and any structural work.
Any figure we quote is tied to the configuration confirmed at that moment. If a dimension or finish changes after production begins, ask us to reissue the sheet in writing before the change goes to the workshop.
6. Plan Delivery, Storage and Installation Before Shipping
Built-in units are only as good as the site they arrive on. Work through the logistics side with us:
- Freight mode and delivery address, with customs documentation handled on our side through furniture logistics and door-to-door delivery.
- Storage on site: keep panels flat, dry and unopened until the room is painted and the floor finish is laid.
- Site readiness date: level floors, completed wet trades, electrical first fix inspected.
- Installation responsibility: whether your contractor fixes the unit or our team carries out installation and after-sales support, with snags recorded at handover.
- Spares: extra shelves, hinges and a small allowance of matching panel are worth ordering with the main batch.
7. Sign Off With a Snag List and After-Sales Record
At handover, walk the unit once with the configuration sheet in hand: door alignment, drawer operation, shelf heights against drawing, lighting function, and finish condition after transit. Write down anything outstanding with photographs and reference numbers, and keep the final configuration sheet with your project records. It is what makes a later spare part or extension match the original.
The Checklist at a Glance
- Survey: finished levels, clearances, wall construction, squareness.
- Storage brief: what is displayed, what is hidden, open-to-closed split.
- Technical interface: screen, devices, ventilation, cable routes, control path, base detail.
- Specification: doors, surfaces, interiors, hardware schedule, lighting and electrics.
- Quotation review: inclusions, exclusions, re-issue rules for changes.
- Logistics: freight, storage conditions, site readiness date, installation responsibility, spares.
- Handover: snag list, photographs, archived configuration sheet.
Buyers who settle these seven blocks before production usually get one clear quotation and one straightforward installation. Buyers who skip them tend to meet the same questions later, when a change is more difficult and costs more.
Send us your drawing
Share the room dimensions, the storage brief and the finish reference for your project, and we will return a configuration sheet with dimensions, materials, hardware and lighting listed item by item. Enquiries are handled by PHILLIP on +86-13928214007, or through our contact page.