A two-tone lacquer kitchen usually looks settled long before the order sheet is finished. The problem is rarely the drawing; it is that tall units, wall units, island carcasses, doors and hardware arrive from different line items and are expected to meet on site. This guide walks through how we count quantities and coordinate the related products so a two tone lacquer cabinets package lands complete, with finishes matched across every run.
Start the quantity take-off from elevations, not render images
Render pictures are pleasant to look at and useless for counting. Send us measured room elevations with wall lengths, ceiling heights, window and door openings, socket and switch positions, plus the appliance schedule you intend to build in. From those drawings we split the kitchen into measurable blocks: base runs, wall runs, tall units, island units, free-standing pantry columns, open shelving and any display cabinets. Each block is then quoted as its own item, so a short change on site can be traced back to one line instead of the whole kitchen.
For made-to-measure work we size every carcase to the drawing rather than picking from a fixed module grid. That matters in villas and apartments where floor-to-ceiling heights vary from room to room, and it is why our lacquer kitchen cabinetry is produced to project-specific dimensions, layout and finish selection.
Count by run, then count the parts that hold the run together
Once each block has a length and a height, the quantity list writes itself. What buyers tend to miss are the connecting items, and those are exactly what stop an installation halfway through.
| Item group | How we count it | What has to match |
|---|---|---|
| Base units and wall units | Linear metres per run, plus each tall unit as a separate piece | Carcase height and depth, toe-kick detail, door style |
| Doors and drawer fronts | One line per opening, recorded with the lacquer colour code | Same lacquer batch group, same grain or sheen direction |
| Island and peninsula units | Counted as their own block, with end panels listed separately | Worktop thickness, panel edge detail, appliance cut-outs |
| Panels, trims and scribes | Cut to the wall lengths recorded on the elevation | Colour and profile matched to the door fronts |
| Hardware | Hinges, drawer slide rails, support legs and connecting brackets per unit | Load rating, opening angle, handle or push-open choice |
| Worktops and splashbacks | Per run with cut-outs marked on the drawing | Edge profile, sink and hob cut positions, joint location |
Hardware is listed unit by unit because a hinge count taken from a picture almost never matches reality. Our built-in kitchen cabinetry is supplied with the matching hardware set for each unit — hinges, slide rails, support legs and brackets — so the fixings do not become a separate purchase order that arrives a container late.
Coordinate the finishes across the whole package
Two-tone work multiplies the coordination job. You are specifying at least two lacquer colours, and in most projects a third surface — a wood-effect panel, a glass front or a stone worktop — joins the same elevation. Three rules keep that combination consistent from the factory to the site:
- One colour code per surface, written into the order. Every door front, end panel and trim carries the code of the colour it belongs to, so the warm and pale runs never swap during packing.
- Order the whole elevation together. Panels that face each other are produced in the same run. Splitting a wall across two orders is where slight sheen differences start.
- Match the wardrobe joinery to the kitchen at the same time. In villa and apartment projects the bedroom cabinetry is seen from the same hallway as the kitchen, so we confirm lacquer colours for both before production starts.
If your project also needs bedroom storage in the same palette, our Two Tone Lacquer Wardrobes are made to measure with the same finish selection, which keeps the joinery reading as one scheme rather than two purchases. For kitchens where a framed door suits the elevation better than a flat one, shaker lacquer cabinets are produced in the same collection, so mixing door styles across an island and a tall run stays within one finish family.
Plan quantities for phased delivery, not one big drop
On multi-unit jobs — apartment floors, serviced blocks, several villas in one development — the quantity list should be cut by phase as well as by room. We produce to the phase schedule and pack by unit number, so a crew opening container two is not hunting for fronts that belong to unit five. Where the site sequence is uncertain, we hold the tall units and appliance housings for a later shipment because they are the items most likely to be damaged or re-measured.
Confirm three numbers before any production slot is booked: the measured opening sizes after plastering, the appliance dimensions from the final schedule, and the worktop thickness the stone supplier will deliver. Every one of those changes a cut list, and each change costs less the earlier it reaches the drawing.
What to send us with your enquiry
- Measured elevations and floor plan, PDF or DWG, with heights and openings marked
- Appliance schedule with built-in dimensions, including fridge, oven and dishwasher positions
- The two lacquer colours you want, plus any wood-effect or glass-front surfaces in the same view
- Door style preference per run, flat or framed, and handle or handleless detail
- Delivery phases and unit numbers, if the site is being handed over in stages