A set of Two Tone Melamine Cabinets is one of the easier cabinetry orders to specify: two finishes, made-to-measure carcasses, a layout that follows the plan. It is also one of the easiest orders to get wrong once it leaves the factory floor. Cabinets arrive in the wrong sequence, panels are damaged in transit, or the site cannot tell which module belongs to which wall, and an installation planned for two weeks runs into a month of claims and re-orders.

International delivery is where those problems get expensive: a damaged panel is not a swap-out but a new production run plus a new container booking. The delivery itself is not a single event at the end of the job either. It is decided during specification, confirmed at production, and only then executed by the freight forwarder. Below is how we plan each stage for an international cabinetry order, using our own workflow at SANTERSON as the working example.

Before Production: What Has to Be Fixed on Paper

Cabinetry is a made-to-measure product. Our Two Tone Melamine Cabinets line is built with project-specific dimensions, a layout tailored to the space and selectable material and finish options, which means every order needs its own confirmed drawing set before a single panel is cut. Nothing about international delivery can be planned reliably while the drawings are still moving.

Three decisions have to close at this stage:

  • Finish split and grain direction. A two-tone scheme looks simple in a render, but on site it needs the door code, the carcass code and the edge-band tone written down separately for every elevation. Melamine foils have a grain direction; if the drawing does not say which way panels are faced, doors that match on paper can read as mismatched once installed.
  • Final dimensions from site survey, not architectural drawings alone. Tolerances in a finished wall, a screed level or a service run will change a 600 mm tall unit into a cut-down job. We ask for the as-built survey before release to production and confirm every dimension with the buyer in writing.
  • Appliance and interface schedule. Ovens, hobs, dishwashers and refrigerators set the internal dimensions of tall and integrated units. An appliance model confirmed after production starts usually means a rebuilt cabinet, not a modified one.
Practical rule: treat the drawing sign-off as the delivery date's starting point. Every container plan, packing sequence and site readiness date is counted from the day the final drawings are signed, not from the day the purchase order was raised.

Choosing How the Cabinets Travel

We arrange global freight forwarding by sea, air and rail, so a cabinetry order does not have to be locked into one mode. The choice is really about volume, urgency and how much site work can proceed in parallel.

ModeWhen it suits a cabinetry orderWhat to watch
Sea freight, full containerA whole apartment, villa or housing package where cabinets travel with other fit-out goods. Usually the lowest cost per cubic metre.The number of containers depends on how the modules are packed, not only on their raw volume. Ask for the packing list before committing to a booking.
Sea freight, shared containerA single kitchen or vanity package shipped alongside other suppliers' goods.Shared containers mean shared handling, so panel protection and palletisation matter more, and arrival timing follows the consolidator's schedule.
Air freightReplacement doors, a missing tall unit, or hardware that has to catch an installation window already in progress.Cabinetry is bulky relative to its weight, so air is rarely sensible for a complete set. Plan it as a recovery option rather than the base choice.
RailRoutes where rail gives a shorter transit than sea at a workable cost.Availability depends on origin and destination; confirm the routing with the forwarder instead of assuming it.

For most residential and small hospitality projects we plan the main cabinetry shipment by sea and keep air freight as the recovery option for any short-ship. That split keeps the base cost predictable while protecting the installation date.

Packing and Container Loading

Our packing and container loading planning covers three freight types that travel together in one cabinetry order: board panels, assembled boxes, and fragile glass or mirror elements. Each needs its own pack type.

  • Pack type by component. Door panels are packed vertically with edge protection; carcass panels are banded in bundles with corner guards; worktops travel separately on their own support; glass and mirror elements are crated independently of board packs.
  • Marking to the site, not to the shipment. Every carton is labelled against the room code and elevation number from the signed drawing set, so an installer on site can find "kitchen tall unit, west elevation" without unpacking anything. This single habit removes most of the day-one confusion at delivery.
  • Loading sequence that matches installation order. The first items needed on site come off the container first. Cabinets for the wet rooms and utility areas are not buried under a wall of living-room joinery.
  • Dunnage and moisture protection. Board products and sea freight do not mix well without barrier wrapping and adequate dunnage, so both are specified in the loading plan rather than left to whoever loads the container.
  • Cargo insurance. Insurance options are arranged with the shipment, and the declared value should reflect the replacement cost of made-to-measure cabinetry, which is higher than a like-for-like shop purchase.

We write these rules into the loading plan and send it ahead of arrival, so the loading team at origin and the unloading crew at destination work from the same instructions.

Export Documents and Import Clearance

Our team prepares commercial invoices, packing lists, certificates of origin and other shipping documents for the consignment, and works with the buyer on import paperwork where the destination requires it. For a cabinetry order, four document details cause most of the delays:

  • Consistent HS codes and descriptions across invoice and packing list. "Kitchen cabinets" on one document and "furniture parts" on another invites a hold.
  • A packing list that matches the count in the container. Piece counts, net and gross weights and carton marks must reconcile line by line; a discrepancy stops clearance while someone re-checks the tally.
  • Correct Incoterms and named place. "Door-to-door" only means something when the agreed term says who pays freight, insurance and destination duties, and where risk transfers. We confirm this per project rather than assuming a default.
  • Duty and tax treatment confirmed with the local broker before arrival, not after the vessel docks. The broker's classification decision can change landed cost, and it is far cheaper to resolve in advance.

We prepare these documents as part of the shipment and keep a logistics coordinator assigned to the project, so the buyer has one contact for booking, documents and arrival. Shipment tracking runs through to delivery.

Site Readiness Before the Truck Arrives

A container that clears customs into an unready site costs as much as a delayed one. Before the delivery window we ask the buyer to confirm:

  • First-floor access, a level area for staging cartons, and a route wide enough for the longest panel in the shipment.
  • That wet trades — plastering, screed, tiling, painting — are complete in the rooms where cabinets will be installed, and that those rooms are dry and secure.
  • That first-fix services — water, waste and electrical positions — match the signed drawings, since cabinet fixing points depend on them.
  • An unloading crew or forklift at the agreed time, plus a documented inspection of cartons against the packing list while the container is still on site. Anything damaged or short should be photographed and recorded the same day.

Delivery Inspection, Installation and After-sales

We provide on-site installation support, inspection and snagging, plus spare parts and replacement service within the warranty scope agreed on the order. Two points matter more than usual once a cabinetry order crosses a border:

  • Raise the snag list against the signed drawing set, not against a render, and send it to us with carton marks and elevation references. That is what allows a replacement panel to be produced to the same specification as the one being replaced.
  • Treat spares as part of the original order. Cabinet panels are made to measure, so replacements are manufactured orders rather than shelf stock. Adding one spare door set for high-traffic or handed-over units is usually cheaper than a later single-piece production run.

A Working Sequence to Plan Against

Run the order in this order and each stage has something solid to start from:

  1. Brief and space planning, with finish selection for both tones and hardware confirmed.
  2. Drawing set issued, site survey returned, dimensions and appliance schedule signed off.
  3. Quotation and detail confirmation; production released only after that sign-off.
  4. Production and quality control, with photographs of the packed sets before the container is booked.
  5. Freight mode confirmed, packing list and documents prepared, insurance arranged, booking made.
  6. Shipment tracking, clearance support, site readiness check before arrival.
  7. Delivery inspection against the packing list, installation and snagging, then handover documentation.
Every stage above runs as a single furniture logistics and door-to-door delivery flow, with the same team handling production coordination and shipping. If you are specifying cabinetry for a home or a multi-unit project overseas, send us the drawings and destination port and we will come back with the packing plan, container estimate and document checklist for that specific order.