A swim spa is one of the few site amenities that touches structural, electrical, waterproofing and maintenance decisions at once. That is why the paperwork around it matters as much as the shell itself. This guide walks through the record set a procurement team should build around Outdoor Swim Spa WS-PC04CH, so that quotations, site works and after-sales claims all refer to the same confirmed configuration.

Why the Documentation Set Matters More Than the Model Name

In villa gardens, resort terraces and wellness areas, a swim spa is usually bought as part of a wider package of outdoor and interior products. When the spa is delivered separately from paving, decking, power distribution and drainage decisions, gaps appear: an electrical load that no one scheduled, a delivery route that cannot take the assembled shell, or a jet package that the site team assumed was standard. Documenting the product before order placement removes those gaps.

SANTERSON is a China-based one-stop furniture and building materials supplier working on villa, hospitality and office projects, so the spa arrives as part of a coordinated package rather than an isolated purchase. The same documentation discipline we ask buyers to keep is what allows our production, logistics and installation stages to line up with the site programme.

Record the Catalogue Data Exactly as Published

The published listing for WS-PC04CH gives a starting point. Keep these values in the requisition file, and treat them as catalogue figures to be reconfirmed on the quotation rather than as fixed site dimensions.

ModelWS-PC04CH
Catalogue dimensions4500 × 3000 × 900 mm
Control system1 set
Water pump / filter pump1 pc each
Jet total46 pcs
LED lights1 pc
Total power (catalogue)2.45 kW
Features shown in listingWater jets, LED lighting, Ozone
Swim training systemNot listed for this model
Two cautions we would write into the file ourselves. First, the listing does not show a swim training system for WS-PC04CH; if the project brief calls for continuous swimming against a current, compare models in the swim spa range that do list that equipment instead of assuming it can be added. Second, the 2.45 kW figure is a catalogue total for the standard configuration — it is not a substitute for an electrical schedule signed off by the project engineer.

Confirm What Is Included and What Is Optional

Catalogue listings show equipment fitted in a reference configuration. Options listed alongside this product family include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each line should be marked as included, optional or not offered, and the answer recorded in writing with a date.

  • Heating approach: heat pump capacity and insulation package, if the spa will be used outside the warm months.
  • Water treatment: ozone is shown in the listing; note separately whether UV sterilisation or sand filtration is specified for a shared or commercial setting.
  • Access and surround: steps, decking interface, handrail positions and any cover requirement raised by the operator.
  • Controls: who operates the system, where the control panel sits, and whether access needs to be restricted in a hospitality context.

Document the Site Interface, Not Just the Product

Most swim spa disputes are about the boundary between supply and site works. Write down who is responsible for each of these before the order is placed:

  • Foundation and support. Bearing capacity, level tolerance and the finished slab or pedestal arrangement under the full weight of a filled shell.
  • Power. Circuit sizing, protection devices, isolation location and the electrical schedule that references the confirmed equipment list — including any heat pump added later.
  • Drainage and overflow. Drain points, priming and first fill water supply, and where discharge from drainage or maintenance goes.
  • Access for delivery. Route width, turning space, crane or lifting needs, and whether the shell reaches the terrace or garden intact.
  • Operating duties. Water testing, filter cleaning cycles, winterisation in cold climates and who performs them after handover.

Where a spa sits inside a larger outdoor scheme — pergolas, loungers, dining sets and poolside seating — the interface drawings are easier to manage when one supplier coordinates the package. Our interior design services cover space planning and product specification for indoor and outdoor areas together, which keeps the spa, its surround and the adjacent furniture on a single set of drawings.

Keep Commercial and After-sales Records in the Same File

Alongside technical data, procurement teams should hold:

  • The quotation with the confirmed configuration list, including every option agreed by email.
  • Packaging and container loading notes, plus the shipping mode — sea, air or rail — and the delivery address for the site itself.
  • Inspection records at handover: physical condition, commissioning results, and any snag items with a named owner.
  • Warranty terms, spare-parts contact and the maintenance guidance supplied with the unit.

Our service scope covers logistics and door-to-door delivery as well as installation and after-sales support, so the same project file can carry production records, shipping documents and handover sign-off. Import terms, duties and delivery scope for a specific country are confirmed case by case, and we record them in that file rather than relying on general marketing statements.

A Short Checklist Before Purchase Order

  • Catalogue dimensions cross-checked against the quotation and against site access constraints.
  • Equipment list marked included / optional / not offered, with dates of confirmation.
  • Electrical schedule issued by the project engineer, referencing the final equipment list.
  • Foundation, drainage and surround responsibilities named in writing.
  • Handover inspection sheet and after-sales contact details attached.

Send us the location, intended use — private villa, resort or wellness facility — and your target programme, and we will return a configuration sheet for WS-PC04CH together with the interface requirements your site team needs to plan around it. Enquiries through our contact page receive a response within 24 hours during business days.