Grey matte cabinet doors show every rub, corner chip and pressure mark. A run of cabinets can pass factory inspection, survive a container crossing, and still arrive with panel edges that no installer can hide. For project buyers, packaging is not a detail left to the supplier's discretion — it is part of the order. The checklist below covers what to confirm in writing before production starts on Grey Matte Cabinets, so the goods that reach site match the goods that left the factory.

Why matte finishes travel differently from gloss or veneer

A matte surface is a low-sheen coating. It does not reflect light, which is exactly why a shallow dent or a scuffed edge becomes visible under kitchen lighting rather than disappearing into a reflection. Two handling risks follow from this:

  • Direct contact leaves marks. When two matte doors touch, friction between the surfaces can leave dull patches or fine scratches that cannot be polished out on site.
  • Adhesive and wrapping residue shows. Tape, stretch film and foam pressed directly against a matte face can leave a shine line or an imprint. Wrapping material has to be compatible with the specific panel finish, not generic.

Grey sits in the middle of the tone range, so it hides dust but reveals grease, adhesive residue and lighter scuff marks. A supplier who wraps dark gloss panels face-to-face with foam may use a very different method for grey matte, and that difference should be stated on the packing list rather than assumed.

The packaging specification to request in writing

Ask the supplier to confirm each of the following points before production. A single sentence per item is enough — what matters is that it appears in the order documents and matches what arrives.

Item to confirmWhat a clear answer looks like
Panel orientation and separationWhether doors and carcass panels ship flat with a protective interleaving layer between every matte face, or assembled with protective corner guards.
Edge and corner protectionWhat protects the visible edges of mitred or wrapped door panels, and whether protectors stay on until installation.
Carton grade and ply casesPaper carton strength for the shipment mode, and whether high-value or long-transit orders move in ply cases instead.
Hardware handlingHinges, runners and handles packed separately from panels, with fixings bagged and labelled per unit.
Marking and packing listEach carton marked with a case number that matches the packing list and the layout drawing, so installers can find the right part at site.
Container loading planHow cartons are blocked, braced and dunnaged inside the container, and whether heavy items sit under — not against — door panels.
Moisture protectionDesiccant or moisture barrier use for sea freight, given that board and panel goods move through humidity swings in transit.

Matching packaging to the delivery term you actually bought

Packaging standard should follow the transport leg, not a generic export default. A pick-up-at-factory order and a door-to-door villa delivery carry different risks: the first may travel one leg by truck to a port, the second moves through inland trucking, transhipment and final-mile delivery on a residential street.

SANTERSON's Furniture Logistics and Door-to-door Delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and delivery to site. Confirm with the logistics coordinator which packing grade applies to your routing, and whether cargo insurance is included or arranged separately for your order.

Practical step: ask for photographs of packed cartons and the loaded container before the doors close at the factory. A short photo set is the cheapest evidence you will have if a claim follows on arrival.

What to check in the first hour after delivery

  • Count the cartons against the packing list before signing, and mark any crushed or re-taped cartons on the delivery note.
  • Open one or two cartons at site and inspect matte faces and edges under work light, not only in daylight.
  • Match case numbers to the layout drawing so damaged units can be identified by position rather than described generally.
  • Photograph packaging as it was found — blocking material, dunnage and carton condition — before the site crew clears the debris. Packaging evidence supports the replacement claim; discarded dunnage does not.

SANTERSON lists inspection and snag handling, spare parts and replacement under its Furniture Installation and After-sales Support. Response times and coverage vary by project and region, so agree the reporting window for transit damage in writing before shipment, and keep that window short enough to affect production of any replacement panels.

How custom sizing changes the packaging conversation

Grey matte cabinets from this range are made to measure, with material, finish and layout specified per project. Custom sizes mean fewer standard carton formats, more oversized panels, and a higher share of one-off pieces that cannot be swapped out of stock if damaged. Two consequences worth raising early:

  • Oversized door panels need edge support along the full length; short corner protectors on a tall panel do not stop the mid-span chip.
  • A replacement panel for a custom size repeats the whole production and freight cycle, so the cost of a better packing grade is usually smaller than the cost of one damaged made-to-measure door.

If your project also includes other cabinetry from the same matte family — such as Handleless Matte Cabinets or Two Tone Matte Cabinets — ask whether mixed cartons are allowed. Handleless doors with integrated profiles and two-tone panels with contrasting edges each have their own protection needs, and mixing them in one carton makes damage attribution harder.

Questions to send the supplier before you confirm the order

  • How are grey matte door faces separated inside the carton, and what material is used as the interleaving layer?
  • Are the panels shipped flat or assembled, and how does that change if the container tranships?
  • Which carton grade applies to my routing, and can it be upgraded for the final inland leg?
  • Will you send packing and loading photographs before container sealing?
  • What is the reporting window for concealed transit damage after delivery?
  • If a made-to-measure panel is damaged in transit, what production slot does the replacement take?

Frequently asked questions

Is flat-pack always safer than assembled for matte cabinets?

Not automatically. Flat-packed panels need strong edge support and clear case numbering, because assembly then falls to the site crew. Assembled carcasses reduce on-site error but take more volume in the container. Ask which method the supplier uses for your panel size and confirm the protection detail either way.

Should protective wrapping stay on during installation?

Keep protectors on panels until the last trade has finished nearby work — plastering, painting and flooring cause most of the late-stage marks on matte doors. Remove film only when the panel is in its final position.

Who arranges packaging for a door-to-door order?

The supplier packs for export and confirms the container loading plan; the buyer's side should confirm receiving arrangements at site, including space for cartons to be staged and inspected rather than carried straight into the property.

Confirming packaging before production starts is a short conversation. Confirming it after a container arrives is a claim, a replacement order and a delayed handover. Put the packing specification in the order documents, ask for loading evidence, and inspect on the day of delivery.