An eight-metre swim spa is a serious line item on a villa or resort budget, and two models with the same footprint can carry very different equipment lists. Outdoor Swim Spa WS-PC08T sits at the long end of our configurable swim and hydrotherapy range, and it is exactly the kind of model where a careful buyer reads past the dimensions before comparing prices. Here is what to check, in the order that actually matters.

Start With the Shell, Not the Features

The catalogue footprint for WS-PC08T is 8000 × 3000 × 1500 mm. That length is what makes the model useful: an eight-metre basin gives a genuine swim channel plus a separate seating and jet zone, so one person can train laps while another sits in the massage area. Width and depth decide how usable that split really is. A three-metre width lets you turn around comfortably and keeps two bathers from disturbing each other; a shallower shell feels cramped once the water is up to hydrotherapy temperature.

Before you compare any feature list, confirm three site-specific numbers with your own drawings: the finished floor level of the deck or plinth, the clear access route from the delivery point to the installation position, and the head height if the spa is partly recessed. A shell that fits on a plan can still fail on a gate width or a stair turn.

Read the Jet Count and the Pump Set Together

The WS-PC08T specification shows 28 jets, one water pump, one filter pump, one control system and one swim training system. Jet count is the number most buyers fixate on, and it is the least useful figure on its own. Twenty-eight nozzles fed by a single pump will feel very different from twenty-eight spread across two pumps with separate zones. What you want from a supplier is the mapping: which jets sit in which zone, what each zone is fed by, and whether the control system lets you run the swim channel without firing every nozzle at once.

Ask for the pump schedule in writing. It tells you more about how the spa will perform than the total jet number does, and it is also where you will see whether a lower-priced quotation has quietly dropped a pump or reduced a zone.

Check the Power Figure Against Your Supply

The power figure on a product page is the starting point for an electrical conversation, not the end of it. The listed total for this configuration does not include a heat pump if you add one, and it assumes a particular supply arrangement. Before you sign anything, confirm with your electrician what supply capacity the installation position can deliver, whether three-phase is available, and what isolation, earthing and protection arrangements apply at the site.

Every swim spa in this range is configurable, so the equipment list on a product page describes one build. Confirm the included items, the total power figure and the electrical requirements for the configuration you are actually ordering before you place the order.

Compare Like-for-Like Inside the Same Range

The fastest way to see value is to compare models that share a length but differ in width and equipment. Two close neighbours of WS-PC08T illustrate what changes when the shell narrows. The figures below are transcribed from each product page; treat them as listed values for one build, not guarantees.

ItemWS-PC08TWS-130A IIIWS-PC08ST
Catalogue dimensions (mm)8000 × 3000 × 15008000 × 3000 × 14008000 × 2400 × 1470
Jet total28 pcs20 pcs6 pcs
Filter pump1 pc1 pc1 pc
Water pump1 pcs1 pcsNot listed on the page
LED lights374
Total power (as listed)10.85 kW10.85 kW6.55 kW
Swim training system1 set1 set1 set

All three are eight metres long and all three carry a swim training system, so the length is not what separates them. The Outdoor Swim Spa WS-130A III holds the same width at a shallower depth and changes the jet layout, while the Outdoor Swim Spa WS-PC08ST narrows to 2400 mm and carries far fewer jets at a lower listed power figure. If your site can carry the extra width, the wider shell is usually worth having; if the width is fixed by a terrace or a courtyard wall, the narrower build is the honest answer.

Price the Options Before You Compare Suppliers

Catalogue options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Two quotations that look identical at headline level often differ by two or three of these. Insulation matters more than most buyers expect if the spa is used outside warm months, because it drives how hard a heat pump works once installed. Sand filtration and UV sterilisation change the weekly chemical routine, which is a running cost, not just an equipment line.

A useful discipline: send every supplier the same option list and ask them to price the base unit and each option separately. Bundled pricing hides substitutions; itemised pricing exposes them.

Work Out Who Handles Delivery, Set and Commissioning

A swim spa of this size is a logistics problem before it is an equipment problem. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. For project buyers this matters because the spa, the deck substructure, the plant room and the finishing trades all have to arrive in a sensible sequence.

Settle in writing who prepares the supporting base, who connects power and controls, who commissions the system on site, and what happens if a component is damaged in transit. Those four questions account for most of the friction on cross-border installations, and answering them early costs nothing.

Fit the Model Into a Whole-Project Specification

Swim spas rarely stand alone. On a villa or hospitality project they sit alongside outdoor furniture, paving, lighting and screening, and the finished look depends on those decisions being made together rather than sequentially. As a one-stop furniture and building materials supplier, we produce the pool shell together with surrounding outdoor collections, wall and ceiling finishes, flooring and lighting, which means one specification sheet, one production schedule and one delivery window instead of six suppliers arguing over tolerances.

If you are specifying for a hotel, resort or private residence, our project services run from consultation and space planning through production, logistics, installation and after-sales support. Send us the site drawings and the intended use of the water — daily training, guest hydrotherapy, or a mix of both — and we will confirm which configuration in the range suits the position and what the equipment list actually contains.

Send us your pool deck drawings

Share the site plan, the available supply capacity and the intended use, and we will confirm the configuration, options and delivery arrangement for a WS-PC08T build. Contact PHILLIP at SANTERSON to start the specification.