Two tone melamine wardrobes look simple on a drawing: a light field, a darker accent, a clean reveal where the two meet. On site they are one of the least forgiving items to schedule. The panels arrive as made-to-measure components, the room has to be finished before they go in, and any mismatch between the opening and the delivered size becomes someone else's problem on installation day. This guide walks through how we sequence measurement, production, freight and fitting on our two tone melamine wardrobes, so the joinery lands in a room that is actually ready for it.

Why built-in joinery needs its own delivery window

Wardrobes of this type are built-in furniture. They are manufactured to the dimensions of a specific opening, not to a nominal catalogue size, and they are installed against finished walls, floors and ceilings. That creates two hard constraints.

  • The room must be wet-trades complete. Plaster, render, tile adhesive, screed and paint all hold moisture. Fitting carcasses before those materials have set traps damp against the panels and puts the finish at risk.
  • Levels and lines must be final. A two tone design reads its edges deliberately. If the floor is not levelled or the ceiling line wanders, the scribe cut and the shadow gap expose it. Setting out happens after the finishes, not before them.

In practice that means built-in joinery sits late in the programme, while still being one of the longest-lead items to produce. Reconciling those two facts is the whole coordination problem, and it starts well before the container is booked.

Stage 1: Lock the specification before anything else moves

Every wardrobe we build is made to measure, so the specification has to be closed out before production can begin. For a two tone design there are more decisions than a single-colour unit, and each one affects both price and lead time:

  • Which surface carries which colour. Door faces, carcass edges, internal boxes and the plinth rarely match by default. Confirm on the elevation drawing which panels are light and which are dark, panel by panel.
  • Finish pairing. A matte field with a textured or wood-grain accent is common in our textured melamine wardrobes. Mixed finishes age differently under the same lighting, so review them together rather than from separate sample cards.
  • Interior layout. Hanging zones, drawers and shelving determine internal panel counts. If you would rather work from a storage brief, our drawer focused modular wardrobes follow the same ordering route.
  • Door operation. Sliding and hinged units have different clearance requirements, track fixings and floor tolerances. Decide this before the setting-out visit.

Where the scheme is still open, our design team can work through space planning, layouts and 3D renderings with you first — see interior design services. That step usually removes more rework later than any other decision in the process.

Stage 2: Two sets of measurements, not one

The first measurement is taken from drawings and supports the quotation. The second is taken on site after the room has been built out, and it is the one production works to. Ask for both in writing.

  • Pre-production check: overall height at several points along the wall, not just one; depth at top, middle and bottom; position of skirting, architraves, downlights, air grilles, switches and door swings.
  • Final site verification: floor level across the full run, ceiling line, finished wall faces after plaster and paint, and the location of any pipes or conduits that a fixing must avoid.

Confirm dimensions and selected specifications for each project

This is standard wording on our product pages, and it exists for a reason. Once the second measurement is signed off, changes to size or finish mean re-cutting panels. Agree the cut-off date for specification changes with your site team before production starts.

Stage 3: Production and how it interacts with the site programme

Once drawings are approved, the panels are cut, edged and finished in our factory in Foshan, then packed as a labelled set rather than as loose components. Two practical points matter here:

  • Packaging follows the sequence of installation. Carcass panels, doors, hardware and fixings are separated and marked so that fitters open only what they need at each step. Ask for a packing list keyed to room and elevation.
  • Spare panels are cheaper than replacements. A single replacement door shipped internationally after installation has started is slow and expensive. Ordering one spare door face with the original set is neither.

We also supply two tone melamine cabinets for kitchens in the same project. Ordering wardrobes and kitchen joinery together keeps the colour match consistent across the home, since both are produced in one run from the same batch of board.

Stage 4: Freight, customs and the delivery address

Our logistics team arranges freight by sea, air or rail along with the paperwork, right through to door-to-door delivery — details on furniture logistics and door-to-door delivery. For joinery there are three things worth deciding early:

  • Delivery point. A finished apartment floor is not a loading bay. Confirm whether the container lifts goes to the building, to a consolidation depot, or straight to the unit, and who moves it from the kerb inward.
  • Incoterms and import terms. Duties, insurance and clearance responsibility vary by arrangement. Agree these per project rather than assuming a default.
  • Storage before installation. Panels should sit indoors, flat and dry, ideally in the room where they will be fitted. Do not schedule delivery into an unfinished space with no cover.

When the same container also carries flooring, doors or other finishes, sequence unloading so joinery arrives last and stays packed until its turn.

Stage 5: Site readiness checklist before fitting starts

  • Floors levelled, finished and cleaned; no wet screed under the wardrobe footprint.
  • Walls plastered, painted or wallpapered, with skirting either removed where the carcass runs through it or confirmed as a scribe detail.
  • Ceiling set, including cornices and any downlights near the top of the unit.
  • Electrical positions final: internal lighting, wardrobe switches, and any power for a steamer or ironing drawer.
  • A clear route from the lift to the room, with doors and corridors measured against the largest packed panel.

Send this list to the builder rather than raising it on the day. Almost every fitting delay we hear about traces back to one of these five items.

Stage 6: Installation, snagging and handover

We provide on-site installation along with inspection, warranty cover and spare parts support — see furniture installation and after-sales support. For a two tone unit, the acceptance check is short but specific:

  • Carcass level and plumb along the whole run, checked with a spirit level at several points.
  • Door alignment: consistent reveal between doors, and consistent reveal where light meets dark. This is where poor setting-out shows first.
  • Sliding tracks running freely end to end, with no catching at either stop.
  • Drawer fronts square against each other when closed, with even gaps.
  • Scribe and beading cuts clean, caulk lines thin, and no visible fixings on show faces.

Record snags with photographs against the packing list, so replacements are identified by panel rather than described in general terms.

A practical timeline to work backwards from

Sequence, not dates

Specification sign-off, then production, then freight and clearance, then site readiness, then fitting. Fix the order first and attach your own dates to it. Transit times, customs handling and finishing durations vary by project, so we do not publish a single lead time for joinery — confirm the schedule for your project when you request a quotation.

The mistake to avoid is treating delivery as the end of the process. Delivery is the mid-point. The room being ready determines whether the fitting goes to plan.

Frequently asked questions

Should the wardrobe be installed before or after the flooring?

After. Fitted wardrobes sit on the finished floor, so levelling and floor finishes come first. If the floor runs under the carcass, confirm that detail on the drawing early, because it changes the height dimension production works to.

Can I change a colour after production starts?

Not without cost. In a two tone design most of the visible panels are cut to size at the start of the run, so a late colour change usually means re-cutting rather than re-finishing. Set the cut-off date with your project contact before drawings are released.

What happens if the delivered unit does not fit the opening?

This is why the second, on-site measurement exists. If a discrepancy appears at fitting, photograph it with dimensions and send it to your project contact; minor adjustments are usually handled on site, while panel-level corrections need factory work.

Can wardrobes ship with other materials from the same project?

Yes. As a one-stop furniture and building materials supplier, we consolidate joinery, flooring, doors, lighting and other finishes into coordinated shipments under our turnkey scope. Pack the container so joinery is unloaded last.

If you are planning built-in joinery for a villa or apartment project, send us the room elevations and your target site-ready date. We will confirm the specification items needed for quotation and map the production and delivery sequence against your programme at Contact Us.