A media unit looks like one item on a drawing, but it is really several trades meeting at one wall: joinery, glass, electrical, sometimes structural fixing. That is why an enquiry about Santerson Glass Front Media Units goes much faster when the information arrives complete. The preparation below mirrors our own working sequence — brief, design proposal, quotation and detail confirmation, then production, shipment and follow-up — so you can send one clear enquiry instead of five rounds of email.

Why media units need more detail than ordinary cabinetry

Our TV Cabinets / Media Units range is configurable rather than fixed. Glass Front Media Units and Santerson Integrated LED Media Units are made to the dimensions, layout and finish of each space, and the same applies to the wall-mounted systems in the Media & TV Walls collection, such as Santerson Full Height Media Walls. Because nothing is stocked to a standard size, we cannot quote from a product name alone. A quotation that leaves out glass type, hardware or cable provisions will be revised later, and revisions delay production.

The other reason is coordination. Glass fronts need safety and handling decisions. Integrated lighting needs transformer placement and a switching arrangement. Sliding panel systems need the mechanism chosen before the panels are cut. Each of these decisions belongs to a different supplier or trade on site, so the enquiry is where they get aligned.

1. The space: dimensions and how the wall is built

Send measured drawings rather than a photograph. We need overall width, height and depth, plus clearances for doors, skirting, cornices, radiators and any return wall. For wall-mounted systems, tell us the wall construction — timber stud, light-gauge steel, masonry or a framed substrate — because that determines the fixing method and whether a backing frame is required.

If the unit sits in a larger scheme, say so. Media walls are frequently specified together with other built-in work, and Custom Built-in Kitchen Cabinets in the same project should be ordered against one set of dimensions and one finish schedule so the veneers, laminates and paint colours match.

2. The screen: size, mounting and what sits behind glass

  • Screen size, model if selected, and whether it is wall-mounted or recessed into the unit.
  • The preferred viewing height, so we can position the screen aperture instead of guessing.
  • Equipment to be housed: console, soundbar, receiver, games consoles, set-top boxes — with their dimensions where available.
  • Ventilation expectations for enclosed equipment, since closed compartments and glass fronts trap heat.
  • Whether you want the equipment visible behind glass or concealed behind solid panels.

Where a screen should disappear when not in use, tell us at enquiry stage. That points the design toward sliding panel systems rather than an open unit, and it changes both hardware and cost.

3. Storage layout: what goes where

List what you intend to store — books, glassware, records, ornaments, linen, cables — and how much of it should be on display. Open shelving, closed storage and a combination behave differently in price and in production. If your design intent is mixed, say which proportion you want open; we will then set shelf spans and shelf thickness to suit the load rather than defaulting to a generic spacing.

4. Glass: type, colour and how it opens

Glass-front units need four decisions confirmed before production, because our product listings do not lock these down for you:

DecisionWhat to specify in the enquiry
Glass type and safetyToughened or laminated, thickness, and any child-safety or impact requirement for the project.
Glass tint and reflectivityClear, bronze, smoked or ribbed — tints shift noticeably under site lighting, so confirm against a sample.
Frame and profileAluminium frame finish, slim or standard profile, and whether the frame colour matches adjacent joinery.
Opening method and hardwareHinged, sliding or lift-up; hinge type, soft-close, handle or push-to-open; and required door swing clearance.

5. Lighting and electrical: the part most enquiries miss

Integrated lighting is a specification item, not a decoration. For Santerson Integrated LED Media Units, confirm before quotation:

  • Where the light is wanted — shelf edge, niche, vertical reveal, or behind the screen for contrast.
  • Colour temperature and brightness, and whether dimming is required.
  • Switching: door-activated, wall switch, remote or app control.
  • Transformer location and how it will be accessed for servicing.
  • Local supply voltage and plug standard, plus who supplies the mains connection on site.

Also send a cable schedule: how many HDMI runs, power outlets inside the unit, and whether low-voltage or fibre runs are needed. Our product pages describe configurable lighting and electrical options but do not publish fixed technical values, so these details come from your project.

6. Finishes and materials

Name the finish you want to match — a veneer species, a laminate code, a paint reference or an existing sample number — and state whether the media unit must match kitchen, wardrobe or wall-paneling work in the same project. Our Custom & OEM service covers bespoke finishes and textures alongside material choices such as wood, metals, engineered stone and laminates, so a named reference is far more useful than a photograph of a mood board.

7. Quantities, delivery terms and site sequence

Give the number of units per dwelling or floor, and whether the order covers one project or several. Our Custom & OEM service lists flexible minimum order quantities, but we still need the quantity to price tooling, packaging and freight sensibly. For logistics, state the delivery location and the Incoterms you want quoted — door-to-door delivery, customs paperwork and container loading are part of our service, while duties, local import terms and transit time are confirmed case by case.

Then give us the site sequence: when the wall substrate is finished, when first fix electrical is complete, and when we may deliver. Glass-front units delivered before the wet trades finish are a damage risk on almost every job.

8. Your project drawing set

Attach what you already have: elevations, joinery details, reflected ceiling plans if lighting is involved, and the finish schedule. If no joinery detail exists yet, say so — our interior design service covers space planning, furniture layouts and 3D visual renderings, and we can develop the detail with you before production begins.

A quick pre-enquiry checklist

  • Measured width, height and depth, plus wall construction for wall-mounted units.
  • Screen size, mounting method and preferred viewing height.
  • Equipment list with dimensions, plus ventilation expectations for enclosed compartments.
  • Glass type, tint, frame finish and opening method.
  • Lighting position, colour temperature, dimming, switching and transformer access.
  • Cable schedule and number of internal power outlets.
  • Named finish reference and any joinery it must match.
  • Quantities, delivery location, preferred Incoterms and the on-site sequence dates.

If you are specifying concealed screens rather than glass-front storage, send the same information for Santerson Sliding Panel TV Systems and note the panel material and mechanism you expect, so the track and clearance are designed in from the first drawing.

What we send back once the enquiry is complete

With those inputs, a single enquiry produces a workable path: design proposal and drawings, then quotation with confirmed details, then production, shipment and follow-up. As a one-stop furniture and building materials supplier, we can hold the media unit together with the surrounding joinery, wall panelling and lighting on one production and delivery schedule, which removes most of the interface arguments that appear when these items are bought separately.

Send your drawings and checklist to our team and we will confirm the glass, hardware and electrical selections for your specific project before anything enters production.