A wardrobe quote that looks complete on the surface can still hide three or four decisions that only become visible after the order is placed. Corner units with sliding doors are worse than straight runs for this, because the return leg, the track and the door overlap all sit in places a drawing does not force you to look at.

Why corner layouts make quotes harder to compare

A straight wardrobe quote is usually priced as a run of metres. A corner unit is not one continuous box: the two legs meet at an angle, and the return leg changes how deep the carcass can be, where the hanging rail stops, and how much clear opening you actually get in front of the doors. Two suppliers can both describe a "sliding door corner wardrobe" and mean different structures.

That is why our Sliding Door Corner Wardrobes page is written around project-specific dimensions, layout and finish rather than a fixed size. Before you compare numbers from two workshops, make sure both quotes answer the same questions about the corner itself.

1. The opening dimensions, not just the wall lengths

Check that the quote lists the two leg lengths separately, plus the depth of each leg and the overall height. Ask whether those are finished-wall dimensions or structural ones, and whether plasterboard, skirting and any floor build-up are already deducted. A quote based on a shell measurement will not fit once flooring and wall finishes are in.

  • Leg A length, Leg B length, carcass depth per leg, overall height
  • Whether out-of-square walls are measured on site or assumed square from drawings
  • Whether the ceiling line is level across the whole run, which decides if the top scribe can be a constant width

2. What happens in the corner itself

This is the item most often left blank. Ask the supplier to state, in writing and on the elevation drawing, which of these applies:

QuestionWhy it changes the price
Is there a false post or filler at the apex?A carcass that stops short of the apex is easier to build and install; one that returns into the corner needs a scribed panel and tighter site tolerances.
Does the internal fit continue around the corner or stop at it?Rails, shelves and drawers cannot pass through an apex post. A blocked corner is normal — but you should know which storage you are losing before sign-off.
What is the usable depth of the return leg?Hanging garments need clear depth. A shallower return leg works for shelves and folded storage, not for suits and coats.

3. The sliding door system and its clearance

Sliding doors save the swing arc that hinged doors need, which is exactly why they are chosen for bedrooms and villa rooms where a bed or a doorway crowds the wardrobe face. They cost you somewhere else: an overlap between panels, and a track zone at head height and floor level.

  • How many door panels, and what is the clear opening width to each half of the unit once panels overlap?
  • Top-mounted or bottom-rolling track, and what floor clearance the track needs above the finished floor level
  • Whether the corner allows both doors to travel fully, or whether one panel has a limited travel range
  • Track material and spare-part availability, since a worn roller on a discontinued profile is a maintenance problem years later, not a design one

If you are weighing sliding against hinged for the same corner footprint, compare the Hinged Door Corner Wardrobes option on the same drawing. The hinged version needs clear floor area in front of it; the sliding version does not, but gives you a narrower opening to each side.

4. Materials and finishes stated by name

A quote that says "white board" or "wood finish" is not comparable with anything. It should name the substrate, the surface material and the edge treatment, and it should say which parts carry which material — door panel, carcass interior, shelves, back panel. Veneer, laminate, lacquer and acrylic behave differently at edges and under light, so matching a sample to a written specification matters more than matching a colour name.

Our Custom & OEM Service covers bespoke finishes and materials, and the workshop quotes what is actually specified rather than a standard catalogue finish. If you are furnishing several rooms or units in one project, ask for the same finish code to appear on every line so that doors from different batches can be compared.

5. Internal fit-out priced as an option, not an assumption

Check whether rails, drawers, shelving and any lighting are included in the quoted price or listed separately. Corner units often need a shallower rail or a pull-down hanging fitting to stay reachable. Decide this at quote stage; retrofitting into a built unit usually means removing doors and re-drilling.

Where storage density matters more than appearance, an Open Corner Wardrobes layout or a walk-in arrangement can use the return leg better than a closed box. It is a trade of appearance against usable volume, and it should be priced as a considered choice.

6. Delivery, packaging and who installs

For units made to measure overseas, the quote should say how panels are packed, how the corner scribe panel is protected, and whether hardware ships loose or pre-assembled into sub-sets. Ask which party handles freight and customs paperwork, and which party carries out installation and snagging on site.

We handle this as one scope — Furniture Logistics and Door-to-door Delivery covers freight by sea, air and rail with the accompanying paperwork, while Furniture Installation and After-sales Support covers on-site fitting and inspection. A quote that bundles these is easier to compare than one where each line comes from a different vendor.

A short comparison checklist

  • Both quotes priced on the same measured opening, with the same floor and wall finish assumptions
  • Corner apex treatment stated, plus which internal fit stops at the corner
  • Panel count, overlap, track type and clear opening width per side
  • Substrate, surface material and edge banding named for each part
  • Internal fit-out itemised, with any special corner fittings shown
  • Packaging, freight scope, installation and snagging either included or priced separately on both quotes

Note: dimensions, material options, freight terms and after-sales arrangements vary by project. Treat the figures and terms in any quote as confirmed only when they appear in writing against your own drawings.

Send us the room drawing. If you are sourcing built-in wardrobes for a villa or hotel fit-out, we can price the corner layout, door system and finish as one line item under One-stop Furniture and Building Materials Supplier scope, with made-to-measure sizing. Contact PHILLIP on WhatsApp +86-13928214007 or email santerson@qq.com.