A square swim spa is easy to shortlist and hard to specify. Outdoor Swim Spa WS-PC02 is listed at 3000 × 3000 × 1050 mm with water jets, LED lighting and ozone, and it sits inside a configurable outdoor swim and hydrotherapy range rather than being sold as one fixed box. That distinction shapes the purchase: the model number opens the conversation, but the specification you agree on is what determines whether the unit works on your site.
For buyers specifying a spa for a villa courtyard, a resort terrace or an apartment podium deck, the customisation topics below are the ones worth putting in writing before a quotation is confirmed. They follow the order SANTERSON uses when a project enquiry arrives: space and structure first, shell geometry, water treatment and heating second, control and operation third, then delivery, installation and support.
Start with the footprint, not the jets
The 3000 × 3000 mm plan of WS-PC02 means a square shell that fits tight terraces and courtyards, but the number that decides construction is the 1050 mm depth. Depth drives the excavation, the retaining edge, the parapet if the spa sits on a deck, and how people actually enter the water. Three site facts are worth stating in the first message to any supplier:
- The clear internal space available, including access routes for delivery, crane or forklift if needed.
- Whether the unit is above ground, semi-recessed or fully recessed, and what surround material you intend to build.
- Water depth you want people to sit and swim in, and whether children or guests with limited mobility will use it.
Depth and access are linked. A spa that is comfortable for an adult sitting jet-to-jet can be awkward for an older guest stepping over the shell edge. Steps are one of the catalog-listed options on this range, so raise them in the first round of discussion instead of treating them as a site problem later.
Confirm what is included before you compare quotations
The catalog entry for WS-PC02 shows one control system, two water pumps, one filter pump, 60 jets in total, one LED light and a total power figure of 7.35 kW. Treat those as the reference configuration shown on the product page, not as a promise about the unit that arrives. Two buyers specifying "WS-PC02" can end up with different equipment lists, and that is where price comparisons go wrong.
For each line item, ask three questions: is it included in this price, is it sized for this water volume, and who supplies the wiring, isolator and plumbing on site. The product page states clearly that included equipment and electrical requirements must be confirmed for the selected configuration, so settle that during the drawing stage rather than at handover.
| Catalog reference for WS-PC02 | 3000 × 3000 × 1050 mm; control system: 1 set; water pump: 2 pcs; filter pump: 1 pc; jet total: 60 pcs; LED lights: 1 pc; total power: 7.35 kW; features shown: water jets, LED lighting, ozone. |
| Catalog-listed options on the range | Control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model. |
Other models in the range worth pricing against it
The same configurable range carries several other footprints, and it is worth pricing them against WS-PC02 so the decision rests on the site rather than on habit:
- WS-PC01 — 3000 × 1050 mm, 53 jets, total power 6.65 kW. A narrower profile for tight side passages and narrow terraces.
- WS-PC05ST — 5000 × 2400 × 1470 mm with a swim training system, 6 jets, 4 LED lights, total power 6.55 kW. The option to consider when lap swimming is the priority rather than jet seating.
- WS-PC08U — 8000 × 3000 × 1500 mm, 4 water pumps, 33 jets, total power 11.85 kW. For resort and large villa decks with more simultaneous users.
Note how unevenly the specifications move between models: jet counts fall as swim systems appear, and pump counts rise with water volume. Comparing model names alone tells you very little; comparing equipment lists side by side is what makes a quotation comparison meaningful.
Shell geometry: what can be changed and when to switch products
The catalog figure for WS-PC02 describes the reference build, not a limit on what can be manufactured. Where the geometry of the site is the constraint rather than the equipment, SANTERSON also produces a Customizable Shape Outdoor Spa with square, round, oval and curved forms in an acrylic shell with structural reinforcement. That route suits sites that are narrow, irregular or wrapped around an existing structure, where a fixed catalogue footprint forces awkward compromises.
Water treatment: ozone is the base, UV and filtration are the decisions
Ozone appears as a feature on this model. What you add on top of it depends on how the spa is used. A private villa spa used by a handful of guests has a very different bioload from a resort or clubhouse spa where turnover is high and usage is unpredictable.
- UV sterilization as an added layer, particularly where guest turnover is high.
- Filter pump sizing and run hours against the water volume, not against the model name.
- Sand filtration versus cartridge arrangements, and where backwash or cartridge changes can be carried out without draining the spa.
- Chemical dosing access, storage space, and who maintains the schedule after handover.
Heating, insulation and the power supply your site can actually deliver
Total power on a spec sheet is a headline figure for the reference build. The real operating cost sits in heating and in how well the shell holds that heat overnight. Two options on this range matter more than most buyers expect:
- Heat pump. Discuss the target water temperature, the ambient climate at the site, how many hours per day the spa is used, and whether the unit is exposed to wind.
- Insulation. Relevant for cool-climate villas and for outdoor spas that run year-round; it affects both start-up time and standing heat loss.
Send the available supply details — single or three phase, the rating of the distribution board, and where the isolator can be installed. Electrical capacity is a frequent reason a swim spa specification has to be revised on site, and it costs nothing to check before production starts.
Control system and how the spa will really be operated
One control system is listed for WS-PC02. Decide who operates it: a homeowner, a hotel engineer, or a facilities contractor with no familiarity with the equipment. Then agree on what they need to be able to change day to day — water temperature, jet zones, lighting, filtration run hours — and what should be locked out. A resort spa with guest-operated controls is an invitation to service calls.
If a project includes other wet areas, it is worth specifying the spa control approach alongside the rest of the wet-zone fit-out so that one contractor understands the whole picture. SANTERSON supplies Swimming Pools and Swim Spas together with bathroom ceramics, showers, lighting, cabinetry, flooring and wall finishes under one procurement scope.
Where a swim spa belongs in a larger project package
On villa and hospitality projects the spa is rarely an isolated purchase. It sits next to sun loungers, cabanas, hardtop gazebos, outdoor dining and poolside paving, and all of those need to agree on level, drainage, material palette and maintenance access. Coordinating them through one supplier removes a category of interface disputes that otherwise surface late in the programme. The Interior Design Services page describes space layout planning, 3D visual renderings and whole-space indoor and outdoor furnishing schemes, with design coordination covering drawings, production coordination and on-site guidance.
Delivery, installation and after-sales: fix the scope in writing
SANTERSON's Logistics and Door-to-Door Delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. For an imported swim spa, agree the delivery point, the offloading method, and where supplier responsibility ends and the site contractor's begins. Import terms, duties and transit arrangements are confirmed case by case for each destination; they are not published as a blanket service level.
On site, Installation and After-sales Support covers installation, inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance. Two things to settle before order confirmation: which parts of the civil, electrical and plumbing work sit with your contractor, and which spare parts should ship with the unit rather than be ordered later if a component fails.
A short specification checklist for your next enquiry
- Site drawings: clear dimensions, access route, above-ground or recessed, surround detail.
- Equipment list against the reference configuration, with inclusions and exclusions marked line by line.
- Water treatment stack: ozone, UV, filter pump sizing, filtration schedule, dosing access.
- Heating and insulation strategy for the actual climate at the site.
- Electrical supply available on site: phase, board rating, isolator location.
- Control system operation: who operates it, what is adjustable, what is locked out.
- Access and steps, plus any swim training requirement that changes the model choice.
- Delivery point, offloading method, installation split of responsibility, spare parts plan.
Every figure quoted above is transcribed from the catalog listing for the model named. Availability and compatibility of options vary by model, and included equipment and electrical requirements must be confirmed for the configuration selected before an order is placed.
Send the footprint, the site drawings and a note on how the spa will be used, and SANTERSON will come back with a configuration for Outdoor Swim Spa WS-PC02 that matches all three — or say plainly if another model in the range is the better fit. Enquiries can be sent through the contact page.