A wardrobe quote is only as good as the drawing behind it. Two tone sliding door wardrobes look simple on a mood board — a light field, a darker frame or panel, two panels that glide past each other — but they combine three things that are easy to get wrong at once: an asymmetric finish, a moving door system and a made-to-measure carcass. This guide sets out the specification fields we ask buyers, designers and contractors to fill in before we quote, so the drawing you approve is the wardrobe that arrives on site.
Why two tone sliding doors need a fuller spec than a plain wardrobe
A single-finish hinged wardrobe hides small inconsistencies. A two tone sliding wardrobe does not. The contrast between finishes draws the eye along every joint, and the sliding system fixes the geometry of the front before the carcass is built. Three consequences follow directly:
- The split line is visible. Where the light field meets the dark field becomes a design feature, so its position has to be dimensioned on the elevation rather than left to the workshop.
- Panel overlap is fixed by the track. Sliding panels travel in parallel tracks and overlap at the meeting stile. That overlap decides how much of each panel is visible when the doors are closed, and it affects what you can see when one panel is open.
- Finish sheen changes how colour reads. A matte field next to a gloss field of the same nominal colour will not match under site lighting. Sheen has to be specified per component, not per wardrobe.
Our Two Tone Sliding Door Wardrobes are made to measure for each project, which means the specification sheet below is what converts your intent into a buildable product.
Section 1 — Space and opening conditions
Send us the room as it actually exists at the time of order, not as drawn at concept stage. For each wardrobe position we need width, height and depth at three points (left, centre, right); clear ceiling height and the floor finish build-up; obstructions such as skirting, architraves, switch plates, air-conditioning grilles and curtain boxes; adjacent door swings and circulation width; and the wall construction that the head track will be fixed to.
- Three measurement points per opening. Floors and ceilings are rarely level. Left, centre and right dimensions let us decide whether to scribe the carcass or pack the run.
- Floor build-up above structural slab. Sliding tracks sit at head and sole. A screed or tile bed poured after our measurement changes the effective door height and can leave panels rubbing.
- Obstructions on the run. These determine whether the carcass sits flush to the wall or needs a reveal, and where the track can be fixed.
- Clear travel for each panel. A sliding panel moves sideways across the front. Confirm there is an unobstructed run for every panel and that no door arc or bedside furniture collides with it.
- Substrate and fixing capacity. Head tracks and wall-borne systems need a support that can carry the load, so state stud type, timber framing, blockwork or concrete.
Note the finished-floor level as a single datum line on your drawing. Every split dimension and every track height in later sections should be measured from that one line.
Section 2 — Carcass, layout and internal fittings
The front is what people photograph; the inside is what they use daily. Specify the layout room by room:
- Carcass material and thickness, plus whether the wardrobe is built into a niche, boxed in on both sides, or freestanding with finished side panels.
- Zone split by user. Hanging length for shirts, jackets and dresses; a higher second rail if the room allows double hanging; shelf spacing; drawers; a shoe or bag shelf; space for an ironing board or vacuum. State who uses the wardrobe and how much of each type of clothing they keep.
- Full-height versus sectional. A run to the ceiling removes a dust ledge and looks built-in, but the top zone needs a step stool. Confirm the client accepts that trade-off in writing.
- Corner and return treatment. For L-shaped and U-shaped runs, state whether the corner is a dead shelf, a carousel or an open transition bay — this changes both cost and usable volume.
Where storage needs go beyond a standard wardrobe front, our modular and walk-in ranges cover drawer-focused, shelf-focused and island layouts that share the same finish schedule: Drawer Focused Modular Wardrobes and Island Walk in Wardrobes.
Section 3 — The two tone front: the part to over-specify
This is where most of the rework happens, so it deserves more space than the other sections. Never write "two tone grey and oak" on a purchase order.
Name every component separately
Break the front into parts and give each one its own line:
| Component | What to state for each |
|---|---|
| Sliding panel field | Colour or decor reference, sheen (matte / satin / high gloss), grain direction (vertical or horizontal), and the board or door-core construction. |
| Frame, inserts or accent band | Second finish with its own code, plus the width of the band or the size and pitch of any insert grid. |
| Moulding / handle / edge trim | Material and colour (anodised aluminium, black powder coat, brass tone, matching wood), profile name, and whether it is a true handle or a recessed pull. |
| Glass or mirror insets, if any | Type (clear, bronze, smoked, frosted, ribbed, mirror), thickness, safety backing, and whether the surface is decorated or plain. |
| Visible carcass edges | Which edges face the room and must therefore carry the feature finish rather than a standard edge band. |
Fix the split geometry with a dimension, not a word
For each panel elevation give: overall panel width and height; the offset of every vertical and horizontal split from a stated datum (usually the left edge and the floor line); and the reveal width between finishes. Panels in the same run are often cut from one sheet layout, so an unbalanced split on one door will read as an error across the whole wall.
Confirm the pair, not the sample
Approve a physical sample that shows both finishes side by side with the moulding between them. A single swatch cannot tell you whether the dark field will overwhelm the light one at full scale, or whether the two sheens sit comfortably together under your own lighting.
Section 4 — Sliding hardware and door behaviour
- Panel count and stacking. Two, three or four panels; which panel is fixed and which travel; where the stack lands when open. Confirm the stack does not block a bedside, a doorway or a light switch.
- Track type. Top-hung or bottom-rolling, single or double track, surface-fixed or recessed. State the required headroom for the track and whether a pelmet or boxed valance will conceal it.
- Panel thickness and weight limits, matched to the hardware set you have specified — heavy glass-fronted panels need a different duty rating than a plain board panel.
- Stopping and soft close. Position of bump stops, whether soft-close dampers are required, and whether the panels latch or simply overlap.
- Maintenance access. Whether panels lift out of the track for cleaning and adjustment. Ask this before installation, not after.
If a glazed front is under consideration rather than a board front, compare it against our Glass Sliding Door Wardrobes in the same sliding collection; the hardware and headroom notes carry across, while the finish schedule changes to glass type and frame colour.
Section 5 — Tolerances, interfaces and site sequence
Most on-site problems are interface problems. Write down who owns each junction:
- Floor level and finish tolerance across the wardrobe run — and whether the sole track sits on the finished floor or is set into it.
- Silicon, shadow gap or architrave at wall and ceiling junctions; state which one is required and its colour.
- Lighting: internal LED strips, their switch or sensor type, transformer location, and a service access point for the driver.
- Skirting treatment — does the carcass scribe over the skirting, or is the skirting cut back?
- Order of works on site: plaster, paint, flooring, then wardrobe. Second-fix electrical must be complete before panels go in.
- Delivery route and lift or stair dimensions for the longest panel and the tallest carcass section.
Section 6 — What we send back, and what to check on it
Once your sheet reaches us, our design and production coordination returns drawings for approval. Check them against the same list you sent:
- Overall dimensions at the wall lines, and the marked finished-floor level as your datum.
- Every finish code on the elevation, matched to the sample you approved — field, accent, moulding, glass.
- Panel split dimensions and stacking direction, with clear opening width shown for one panel open.
- Internal layout dimensions against the client's actual storage list.
- Track headroom, pelmet detail and any on-site packing or scribing allowance.
A specification that states finishes per component, split positions as dimensions, and interface responsibilities by trade removes most of the arguments that would otherwise happen after delivery. That is the difference between a wardrobe that photographs well and one that still works properly years later.
Ready to specify?
Send us your room dimensions, the finish references you have selected, and the internal storage list. We will return drawings and a quotation for made-to-measure wardrobes, and can coordinate them with the rest of the joinery, cabinetry and interior fixtures in the same project package through our custom and OEM service. Enquiries reach us at santerson@qq.com or by phone and WhatsApp on +86-13928214007 (PHILLIP).