A Glass & Acrylic Combination Wardrobe looks simple on a rendering: glossy coloured doors, a glass panel or two, an aluminium frame between them. On site, it is where three different materials meet, and that junction is exactly where disputes start. Before a purchase order is signed for a villa bedroom, a walk-in wardrobe or a guest-room fit-out, buyers should put the finish details in writing. The list below follows the way these units are actually built and delivered, from panel edge to handover.

1. Which surface is acrylic and which is glass

In a combination door, acrylic carries the colour and reflectivity; glass usually sits as an insert, an inset panel or a glazed strip inside a frame. Ask the supplier to mark up each elevation and state, per panel, what the visible face is made of and how it is fixed. Acrylic sheet thickness, the substrate behind it and the fixing method (bonded, captured in a channel, or screwed through) change both the look and the serviceability of the door. Two doors that read identically in a photo can behave very differently after two years of daily use.

2. Gloss level, colour reference and grain direction

"High gloss white" means nothing on its own. Confirm the acrylic colour by a physical reference code or a signed sample board, not a screen image, and record whether the finish is high gloss, metallic, matte or two tone. Our White Acrylic Wardrobes and Matte Acrylic Wardrobes pages list finish options per project, so the same carcass can be quoted in either sheen. For metallic and pearl acrylics, note that light travels across the sheet: specify the grain or flow direction on every door elevation, otherwise a run of doors will show a visible shift in tone where the sheets are butted.

Ask how colour matching is handled between materials. Acrylic, glass coating and the aluminium frame are produced on separate lines, so a "black" frame, a black acrylic panel and a black-coated glass insert can each sit slightly apart under warm bedroom lighting. If an exact match matters, request a combined sample that shows all three together.

3. Glass type, thickness, tint and edge treatment

For the glazed parts, state the glass type and thickness you expect, and whether the insert is clear, frosted, smoked, bronze or ribbed. Tint changes the whole character of a mirrored or dark bedroom: Frosted Glass Wardrobes soften contents and hide fingerprints, while smoked and bronze tints read warmer against wood tones. Confirm the edge treatment on show edges — polished, seamed or chamfered — because an unfinished edge is the first thing a hand finds when sliding doors are pushed daily.

Also confirm what sits behind the glass in a combination door: an acrylic panel, a mirror, a lacquered back or an open cavity. That decision controls whether the glass reflects, glows or shows storage, and it is frequently changed late in a project when nobody has priced it.

4. Frame profile, colour and hardware duty

The frame is what makes a combination door look deliberate rather than assembled. Confirm the profile width and the finish of the aluminium section — clear anodised, bronze, black or wood-effect — and whether the same profile is used on hinged doors, sliding doors and any fixed glass panel next to them. Where a run mixes door types, a mismatched frame depth is obvious at the reveal. Then match hardware to the duty: sliding systems need track, wheel and stop components rated for the finished weight of an acrylic-and-glass door, which is heavier than a plain board door. Hinged doors need hinges set for the door mass and the gap you want between doors.

5. Interior finish and edge banding

Buyers specify the front and forget the inside. Confirm the carcass material, the colour of interior panels, and whether all visible edges are banded and in which colour. Inside a walk-in or an open section, every cut edge is on show. Decide now whether interiors match the door colour or contrast with it, and how shelves, drawers and hanging rails are fixed — cam, dowel or metal bracket — because adjustable systems need pre-drilled rows that must line up across the whole run.

6. Site dimensions, floor level and the tolerance question

These units are made to measure, so the numbers on the order have to come from the finished room, not the structural drawing. Confirm that screed, flooring, skirting, plaster and ceiling finishes are complete at the setting-out date, and record floor level across the run: an out-of-level floor is corrected in the plinth or the sliding track, and only if someone has agreed which. Note the position of switches, sockets, lights, air-conditioning lines and doors that swing into the wardrobe front, plus the clearance needed for handles.

Practical rule: nothing counts as agreed until it appears on a signed elevation drawing with material codes. A quotation line reading "glass & acrylic combination door, as design" is not a specification — it is an argument waiting to happen.

What to have in writing before production starts

Item to confirmWhy it matters on site
Signed elevation per unit, with panel-by-panel material calloutsRemoves ambiguity about which face is acrylic and which is glass
Acrylic colour code, sheen level and grain directionPrevents tone shift across a run of doors
Glass type, thickness, tint and edge finishShow edges take daily handling; tints change the whole room tone
Frame profile width and finish, consistent across door typesMixed hinged and sliding doors must meet cleanly at the reveal
Hardware rated for finished door weightAcrylic plus glass is heavier than a plain board door
Interior colour, edge banding and shelf-fixing systemOpen and walk-in sections expose every cut edge
Final site dimensions after wet trades, with floor levelsLevel is corrected in plinth or track only if agreed in advance
Named approval contact and a single revision deadlineLate changes to glass inserts are the most common cost surprise

How the confirmation round runs with our team

As a furniture and building materials manufacturer working on villa, hotel and office projects, we build these wardrobes as part of a wider fit-out, which is why the finish sheet is confirmed together with doors, wall panelling, vanities and lighting rather than in isolation. Our built-in furniture range is made to measure, with material and finish options set per project and layout tailored to the space. Under our custom and OEM process, elevations and 3D models go back and forth before production, so the panel callouts above are settled on paper rather than in the bedroom.

If your wardrobe run sits alongside other fit-out items — Glass Sliding Door Wardrobes in the corridor, panelling behind the bed, a vanity in the ensuite — we coordinate the finishes across the package so frames, trims and interior colours match. Freight is arranged to site, with installation support at handover.

Send us your room elevations or floor plans, together with the acrylic colour reference and glass tint you have in mind, and we will return a specification sheet that states each panel material, the frame profile and finish, the hardware set and the interior detail — so what you approve is what arrives. Contact SANTERSON to start the confirmation round.