A wood grain melamine cabinet package rarely fails at the drawing stage. It fails in the gap between a beautiful elevation and the wall it has to fit — a service run that was never measured, a floor that is not level across its length, an appliance whose door swing was not checked. If you are specifying Wood Grain Melamine Cabinets for a villa or apartment project, the quality of your enquiry determines how accurate the quotation and how smooth the production run will be. The list below is what we ask buyers, builders and designers to send us.

Start With the Room Envelope, Not the Door Style

Cabinet carcasses are built to a grid; rooms are not. Before any finish conversation, record the shell dimensions of the space in millimetres, taken at more than one point on each wall.

InputWhat to measure and note
Wall lengthsRun of each wall that carries cabinetry, measured at high level, mid level and skirting level. Note where walls go out of plumb or have a bow.
Room depthClear distance between opposing walls, both with and without any existing base or wall units in place.
HeightsFloor finish level to ceiling soffit; also the height of any beam, bulkhead or duct that drops into the cabinet zone, plus its position from each end wall.
Squares and anglesWhether internal and external corners are true 90 degrees. Record any angled wall and its actual angle rather than assuming a mitre.
Floor conditionLevel, screed height, and whether tiled or floating flooring is already laid — this decides toe-kick heights and where scribing is needed.

Send drawings if you have them, but a dimensioned sketch with photographs of each wall is enough to start. Our team checks the numbers against the layout before production, and where a dimension looks inconsistent we query it rather than guess.

Fix the Services Before the Carcasses

Pipes, waste outlets, power points, switches and rangehood ducting set hard limits on run lengths and unit widths. A sink position moved by 150 mm after carcasses are cut is an expensive lesson.

  • Plumbing: hot and cold inlet positions with heights from finished floor, waste outlet centres, and whether a dishwasher or washing machine is on that run.
  • Electrical: appliance locations and circuit points, hob and oven positions, and any internal lighting circuits for glass-front or niche units.
  • Ventilation: rangehood type, duct route and the ceiling space available for it.
  • Gas: whether the project uses gas, and where the valve sits relative to the hob.

List Appliances and Sanitaryware by Model

Give us model numbers and cut-out dimensions for every appliance that will be built in: oven, cooktop, dishwasher, refrigerator, microwave drawer, wine cooler. Integrated tall units only work when the appliance datasheet is on the table at the design stage. The same applies to countertops and basins if you are ordering them with the cabinetry — stone thickness and basin drop change the door heights.

Decide Layout Logic, Then Storage Internals

Tell us how the kitchen is used, not just how it looks. A villa kitchen for a family who cooks daily needs different drawer stacks from an apartment kitchen in a rental scheme. Useful details to send:

  • Preferred configuration — L-shaped, U-shaped, galley or open-plan with an island — and whether tall units are acceptable on the shorter wall.
  • Work triangle constraints, and which side the hob and sink currently sit on.
  • Storage priorities: deep pan drawers, pull-out corner systems, pantry racking, appliance garages, or open display niches.
  • Handle preference — handleless profile, integrated pull, or visible handles — because it affects door overlap and clearance to adjacent walls.

Specify the Wood Grain and Surface You Actually Want

"Wood grain melamine" covers a wide field: pale oak through to dark walnut-look, fine saw-cut texture through to pronounced embossing, and matte through to high gloss. Send a reference image or a physical sample, and state whether the tone should match an existing floor, door or wall panel elsewhere in the project. Where a whole-house scheme runs through several product families, tell us which pieces need to match — for example Matte Melamine Cabinets in the kitchen paired with Wood Grain Melamine Wardrobes in the bedrooms. Grain direction on doors and panels is worth confirming in writing too, since matching tone with mismatched grain direction reads badly once installed.

Our Custom & OEM Service covers bespoke finishes and textures alongside made-to-measure sizing, so a wood grain look that has to sit against a specific veneer or flooring species is a normal request rather than an exception.

Send the Project Facts That Change Price and Packing

ItemWhy it matters
Quantity of units or apartmentsRepeats drive panel optimisation, batch consistency and per-unit cost.
Project typeVilla, apartment, serviced residence or office pantry each carry different wear and specification expectations.
Destination country and delivery addressSets container loading plan, packing grade and freight route for our door-to-door service.
Incoterms preferenceWhether you want factory, port or delivered-to-site pricing quoted.
Target programme dateHow design sign-off, production and shipping need to be sequenced.
Local installerWhether your builder assembles on site or you want our installation support arranged.

A Simple Enquiry Checklist

Dimensioned room drawings or a measured sketch; photographs of each wall; services positions; appliance and sanitaryware models with cut-out sizes; layout preference and storage priorities; finish reference for the wood grain; unit count; destination address; and target programme date. Send these together and the first quotation is usually close to the final one.

SANTERSON works as a single source for cabinetry alongside the rest of the fit-out — flooring, wall panelling, wardrobes, lighting and bathroom ceramics — so one coordinated set of measurements can serve several product families on the same project. That reduces the risk of a cabinet depth that clashes with a floor build-up or a door reveal that no longer lines up with an adjacent panel system.

Common Questions

Do you need architectural drawings, or will a sketch do?

A dimensioned sketch with photographs works well for single kitchens and small multi-unit jobs. For larger apartment packages, coordinated drawings help us keep unit types consistent, but we still verify site dimensions before production.

Can one wood grain finish run through kitchen and bedroom joinery?

Yes, when you tell us at the design stage which pieces must match. We produce them from the same batch reference so tone stays consistent across rooms.

What if my walls are not straight?

Send the measurements taken at several heights rather than a single "best" number. We plan scribing and filler panels around the real condition instead of designing to an idealised drawing.

Ready to price a package? Send your measurements and project details through our contact page, and we will come back with a specification and quotation built on the numbers you provide.