Freestanding cabinets look simple on a drawing: a box on the floor, somewhere along a wall. In production they are anything but simple. Every Santerson freestanding unit is made to measure, so the accuracy of your enquiry determines whether the cabinet arrives fitting the space it was designed for. The inputs below are the ones our workshop needs before a quotation can be prepared and production released.
Why Freestanding Cabinets Are Built From Your Inputs, Not A Catalogue Size
Santerson is a China-based furniture and building materials supplier working on villa, hospitality and office projects since 2008. Our storage ranges are not stocked in fixed sizes. The Santerson Freestanding Cabinets in the bathroom Storage Units collection and the Santerson Freestanding Cabinet in the Display Cabinets collection are both specified per project: dimensions, layout, material and finish are set by the buyer's drawings and room conditions. The same applies to Santerson Freestanding TV Cabinets and Santerson Freestanding Open Shelves.
That means a request that only says "one 1200 mm cabinet, grey" is not yet a producible order. It becomes one once the seven input groups below are supplied.
1. Room Dimensions And The Cabinet's Own Envelope
Send the length, height and depth of the wall or recess the unit will stand against, taken at floor level and at ceiling level rather than a single mid-height measurement. Floors and walls in renovated villas and hotels are rarely square, and a freestanding unit that must sit flush to a skirting line or a tiled return needs to know it.
- Clear opening width and height at the installation position, plus available depth from finished wall face to finished floor finish.
- Positions of skirtings, cornices, architraves, radiators, door reveals and any projection the cabinet has to clear or scribe around.
- Whether the unit is free on all sides, against one wall, or into a corner — corner positions change side-panel finishes and door swing.
- Access route from the building entrance to the room: lift car dimensions, stair widths, corridor turns and door leaf heights decide whether the unit ships as one body or in sections that assemble on site.
2. Layout And Internal Configuration
Tell us how the interior is to be divided, not just how the outside looks. Hanging zones, drawer banks, shelf pitches and closed-versus-open ratios are what drive the carcass build.
| Zone | What to specify |
|---|---|
| Closed storage | Door type (hinged, sliding, lift-up), number of doors, which side the hinges go, shelf count and adjustable pitch. |
| Open display | Number and depth of open bays, whether dividers are full-height or partial, and any niche for a vase, lamp or tray. |
| Drawers | Drawer count per bank, front heights, and whether runners are soft-closing. |
| Hanging | Rail height, double-hang or single-hang, and trouser or accessory pull-outs if required. |
| Mixed units | For combinations such as open and closed storage, mark which bays are open and which are enclosed on the elevation. |
3. Materials, Finishes And Edge Details
Our custom and OEM service covers board selection, surface finishes, veneers, glass and metal frames, so finish decisions should be made at enquiry stage rather than after production starts. Specify the door/drawer front material and colour or grain reference, the carcass colour matching the fronts or contrasted against them, edge treatment on visible sides, and hardware style and finish (handles, integrated pull profiles, knobs). Where a project already has a joinery schedule, send it; where the palette is still open, our interior design services team can develop concept boards and 3D renderings before anything is cut.
4. Fixing, Safety And Interface Conditions
A freestanding cabinet still has to be restrained and connected to the room. Confirm with your site team:
- Wall construction behind the unit (stud, brick, tiled substrate) so the correct restraint fixings are supplied.
- Whether anti-tip anchoring is required by the project specification or local practice — this is decided per project and per market.
- Any cut-outs for skirting, pipework, sockets or switches, with their exact offsets from floor and side datum.
- For media units, cable routes, socket positions behind the cabinet and ventilation needs for equipment.
5. Use, Loading And Environment
The same carcass behaves differently in a guest bathroom and in a family hallway. Tell us what the cabinet will carry — linen, glassware, books, bottles, appliances — and where it stands. Bathroom storage sits near splashes; a display cabinet in a lobby sees daily public handling. These conditions guide board choice, finish durability and hardware grade for that unit.
6. Quantities, Phasing And Site Programme
Give the quantity per type, the room or apartment schedule they belong to, and the date each batch is needed on site. Repeat units in a villa or hotel development are usually produced as one run with per-room variations; that only works if the variations are marked on the drawings you send.
7. Documentation That Speeds Everything Up
- Room elevations or a joinery schedule with dimensions already annotated.
- Finish schedule or sample references for doors, carcass and hardware.
- Photographs of the actual wall and floor conditions where the unit stands.
- The project's FF&E or fixture numbering system, so each cabinet matches its line on your bill of quantities.
What Happens After You Send The Inputs
Enquiries move through the same sequence as our other turnkey project work: brief and design proposal, quotation with detail confirmation, then production, shipment and follow-up. Because Santerson supplies furniture and building materials together, freestanding cabinets can be ordered alongside the kitchen cabinetry, wardrobes, vanities, lighting and flooring of the same villa or hotel package, under one coordination team, with freight by sea, air or rail and door-to-door delivery arranged centrally.
If you are specifying storage for a villa, hotel or apartment project, send your elevations, dimensions and finish references to the Santerson project team. We will return a quotation built on those inputs, with any dimension or fixing conflicts raised before production rather than after.