A swim spa shell is easy to order. A working installation on a specific site is not. Before production starts on Outdoor Swim Spa WS-S06M, the decisions that shape price, freight and commissioning are all locked down in advance — shell geometry, pump and jet layout, the electrical supply, the base, and who does what on site. This article sets out the list a buyer or project contractor should close out item by item before the order goes into manufacturing.

What WS-S06M Is, and Why Configuration Decisions Matter

WS-S06M sits in our configurable outdoor swim and hydrotherapy range, alongside models such as WS-S06, WS-S06B and the longer WS-S12. It is a one-piece acrylic shell on a reinforced cabinet, with an equipment set specified per model rather than chosen freely. The catalog entry lists overall dimensions of 5900 × 2200 × 1610 mm, so the spa sits in a size band that most terraces, pool decks and villa courtyards can take without redesigning the slab.

Two features set it apart from its siblings. First, depth: at 1610 mm it is deeper than the 1110 mm WS-S06 and the 1250 mm WS-S06B, which changes water volume, heating load and how adults sit in the jet zone. Second, water features: the catalog shows four water columns on this model, along with water jets, LED lighting and ozone. A swim training system is not listed for WS-S06M in the captured specifications — if a project needs that equipment, it belongs at the model-selection stage, not after production.

The practical point for procurement: on a configurable product, "WS-S06M" is only the starting specification. Every item in the sections below either stays at catalog default or moves to an option, and each change re-prices the package and can change the freight plan.

1. Confirm the Site Envelope Before the Shell Size

Send us the site drawing before you commit to a model. We need more than the footprint of the spa.

  • Clear opening and access route. The shell travels as a single unit. Measure gate width, corner clearances, stair or lift dimensions on the route from the delivery vehicle to the final position, and confirm whether a crane or hiab is needed for a roof-top terrace or sunken courtyard.
  • Structural support. A filled spa of this class is a heavy point load. Confirm the deck, slab or podium can carry it with water, occupants and plant included, and have the local engineer sign that off — not us.
  • Base preparation. Tell us whether the spa will sit fully above ground, semi-recessed, or in a recessed pit with an access hatch. Recessed installations need service access to pumps, filter and control system on at least one side, plus drainage for any leak or drain-down.
  • Drainage and overflow route. Where the water goes during draining, backwash and rain run-off needs to be settled on paper before the cabinet is built around it.

Send your site drawing and we will check it against the shell dimensions before production starts. That one step clears the two problems that come up most often on projects like this: a spa that cannot reach its final position, and a recess that leaves no service access.

2. Confirm the Water System Against the Catalog Baseline

The catalog specification for WS-S06M reads as follows. Check each line against what your client actually asked for, and confirm in writing what is included.

ItemCatalog specification shown on site
ModelWS-S06M
Catalog dimensions5900 × 2200 × 1610 mm
Control system1 set
Water pump2 pcs
Filter pump1 pc
Jet total48 pcs
LED lights17; 17 small LED lights
Total power6.95 kW
Features shownWater jets, LED lighting, Ozone, 4 water columns
Swim training systemNot listed for this model in the captured specification
Catalog optionsControl system, UV sterilization, water pumps, heat pump, sand filtration, insulation, steps

Two of those lines carry real cost and site consequences. The jet total of 48 pcs together with four water columns means a jet layout to agree before the acrylic is formed: which seats get massage jets, where the water columns sit, and whether any of them face a wall or a window. The LED count shown in the catalog means the lighting circuit and the underwater fittings need to be on the electrical drawing, not decided on site.

Availability and compatibility of those options vary by model, so each one needs a yes or no against this specific spa. For a villa in a cool-climate region, the heat pump and insulation package changes running cost far more than the lighting spec; for a hotel or resort, UV sterilization and sand filtration are usually on the operator's list from day one.

Ask us for the configuration sheet for your chosen build, not just the catalog page. The catalog shows what the model can carry; the configuration sheet is what we manufacture and what the packing list will match.

3. Confirm the Electrical Supply and Connected Load

Total power for the catalog build is 6.95 kW, as listed in the specification above. That figure covers the pumps, control system, lighting and ozone at the catalog configuration; a heat pump added on top of it raises connected load materially, and the supply your electrician prepares must reflect the final configuration, not the base one.

  • Confirm the available supply at the panel: phase count, voltage and frequency for your country, and the breaker and cable size the electrician will provide.
  • Confirm who supplies and installs the isolator, the run of cable to the spa, and RCD/ELCB protection. We ship the spa with its equipment set; the site supply and final connection are normally local works.
  • Confirm earthing and bonding requirements with your local electrician. Pool-side electrical rules differ by country and state, and they are set by the authority having jurisdiction, not by the manufacturer.
  • If a heat pump is added, ask us for the revised connected load before the cable is pulled.

4. Confirm Water Treatment, Heating and Insulation Strategy

Ozone is shown as a feature on this model. Decide what sits alongside it: UV sterilization, sand filtration, and the dosing routine the operator will actually run. A spa used daily by hotel guests has a different maintenance cycle from a private villa spa used seasonally, and the equipment choice should follow that usage.

Heating and insulation are the second decision cluster. If the spa is expected to hold temperature through cold nights, insulation package and heat pump size matter more than jet count, and both need to be in the order before the cabinet is closed up.

5. Confirm the Scope Split and the Logistics Plan

For an export project, the spa rarely travels alone — it usually arrives with patio furniture, bathroom fixtures or other fit-out goods, and consolidating it into one shipment changes the loading plan. As a one-stop furniture and building materials supplier, we arrange freight forwarding by sea, air and rail with customs paperwork, packaging and container loading, and door-to-door delivery under our logistics service, so the spa can move on the same schedule as the rest of the package. Import terms, duties and transit time are confirmed case by case for your destination.

What to lock down before production:

  • Incoterms and delivery address. Port, site, or door — and who is the importer of record.
  • Container type and loading plan. A spa shell plus cabinet, steps and loose equipment needs a specific loading sequence; tell us the final position on site so the unloading method matches.
  • Documentation. Commercial invoice, packing list and any import paperwork your country requires.
  • Site readiness date. The spa should not arrive before the base, power and drainage are finished. Agree a delivery window against your programme, and we build to it.

6. Confirm Installation, Commissioning and After-sales Terms

Decide in writing who commissions the spa: our team under installation and after-sales support, your contractor, or a local pool service company. Then confirm what the handover includes — jet and control system walkthrough, water chemistry start-up, spare parts list, warranty scope and what voids it. Getting this settled before production avoids the common dispute at handover over whether a fault is a manufacturing issue or an installation issue.

A Pre-Production Sign-off List

Before the order enters production, every line should be signed off
  • Model and catalog dimensions confirmed against site access and structural support
  • Jet layout, water column positions and LED positions on an approved drawing
  • Options list closed: control system, UV sterilization, heat pump, sand filtration, insulation, steps
  • Final connected load issued to the site electrician; isolator, cable and protection assigned
  • Water treatment and heating strategy agreed with the operator's maintenance routine
  • Incoterms, container plan, import documents and delivery window confirmed
  • Commissioning party, handover items, spare parts and warranty scope in writing

If the project also needs the spa integrated into a wider villa or hospitality fit-out — decking-adjacent outdoor furniture, poolside loungers, bathroom fixtures, cabinetry — our turnkey interior project solutions cover design coordination, production and site handover under one scope. For a spa bought as part of that package, the same sign-off list applies, but the base, power and drainage get coordinated with the other trades instead of being solved separately.

Send us your site drawings and configuration sheet

Share the site plan, available supply and required options for WS-S06M, or ask us to recommend a model from the wider swimming pools and swim spas range if the envelope or brief points elsewhere. We will confirm the configuration, connected load and freight plan before production starts.