Wall mounted open wardrobes look simple from a distance: rails, shelves and a back panel fixed to the wall, no doors in front. The quotation is where projects go wrong. Because there is no cabinet carcass standing on the floor to carry the load, and because everything is exposed, the supplier has to know about the wall, the fixing method, the storage plan and the finish before they can price the job honestly. Send the information below with your enquiry and you will get a comparable, buildable quote instead of a rough guess.

1. The wall itself, not just the wardrobe size

A wall mounted unit hangs from the structure behind the surface finish, so the first thing a supplier needs is a description of that structure. For each wall run, state:

  • The wall type — masonry, concrete block, lightweight stud partition with plasterboard, timber frame, or tiled/rendered surface.
  • Total length and height of the run, plus the depth you want for shelves and hanging rails.
  • Where sockets, switches, light points, skirting, cornice or air conditioning ducts sit in relation to the run.
  • Whether the wall is flat and plumb. Old villas and renovated apartments rarely are, and an out-of-plumb wall changes both the fabrication and the site fitting time.
  • The distance from floor to ceiling, and whether the unit should stop short of the ceiling or reach it.

If you can attach a simple dimensioned sketch or photographs of the three walls involved, the factory can flag conflicts before production rather than after delivery. For new builds, send the architectural room drawing with the wardrobe wall marked.

2. Fixing method and load expectations

Open wardrobes carry hanging clothes, which is a live, swinging load on a fixing that has no floor support. Tell the supplier how heavy the loading will be and what substrate the fixings bite into. That single detail decides whether you need concealed steel backing plates, a timber battening frame inside a stud wall, chemical anchors in concrete, or a hybrid solution where the first bay is floor supported.

Also state whether the wall finish is already installed or still to come. A unit fixed before tiling or plastering can be bedded into the finish and looks built in; a unit fixed afterwards needs different trim details and visible fixings are harder to hide.

Practical tip: send a photo of the wall with a tape measure against it, showing skirting height and any services. It removes most of the back-and-forth that delays a quotation by days.

3. The internal storage plan for each user

Open wardrobes show their layout all day, so the internal configuration is a design decision, not an afterthought. Give the supplier a room-by-room brief:

  • Hanging lengths you need — long hanging for dresses and coats, double hanging for shirts and trousers, or short hanging only.
  • Number of shelves, and the shelf spacing for folded stacks, boxes and bags.
  • Drawer zones, including whether you want shallow sock-and-accessory drawers or deep linen drawers, and whether they are open fronted or fitted with trays.
  • Special items: suitcases, ironing board, vacuum cleaner, safe, laundry basket, jewellery tray, trouser pull, tie rack.
  • Integrated lighting — shelf-mounted LED strips, motion sensors, or a driver position for a switch.

A usable format is one line per bay: "Bay 1, 600 mm wide, double hanging at 1050 mm and 1750 mm; Bay 2, five shelves plus three drawers." That level of detail lets the factory price hardware once instead of revising it.

4. Materials, finish and edge details

With no doors, every visible surface matters: shelf edges, side panels, back panel and rail covers are all on display. Specify:

  • Board material for carcass and shelves, and the board thickness you expect for spans of the depth you requested.
  • Surface finish — melamine, lacquer, veneer or acrylic — and the exact colour reference from the supplier's sample range rather than a description like "light oak".
  • Edge treatment: matching ABS edge, 2 mm rounded edge, or a solid timber lipping on visible shelf fronts.
  • Rail and frame material, for example aluminium profile versus timber rail, and the metal colour if profiles are exposed.
  • Back panel choice: full-height decorative panel, recessed panel, or no back panel where the wall finish is the background.

Our wall mounted open wardrobes in the Open Wardrobes collection are made to measure, with material and finish options and a layout tailored per project, so this information is exactly what we need to turn an enquiry into a firm price.

5. Quantities, rooms and programme

Quotations move faster when the quantity survey is clear. Provide:

Item to confirmWhy it changes the price
Number of wardrobes per room type (guest, master, staff)Repeating identical bays shares tooling and reduces unit cost.
Total project quantity across all rooms or unitsLarger runs allow batched boards and one hardware order.
Required delivery date and site access dateDetermines production slot, packaging level and freight mode.
Destination city and delivery address typeAffects packing for the journey and the last-mile arrangement.
Who installs: your contractor or oursDecides whether we supply fixing details only or fitting supervision.

6. Drawings, samples and approvals

Attach whatever you already have: architect's joinery schedule, elevations of the bedroom walls, a mood board, or photographs of a detail you want to copy. If your project needs approval before production, say so and ask for physical finish samples and a first-article elevation drawing for sign-off. As a one-stop furniture and building materials supplier, we can also match the wardrobe finish to cabinetry, doors, wall panelling and flooring from the same project package, which is worth raising in the enquiry if other joinery is still open.

7. What a complete quote should contain

Before you compare prices, check that each supplier returned the same scope. A serious quotation for wall mounted open wardrobes lists:

  • Itemised bays with dimensions and finish codes, not one lump sum per room.
  • Hardware schedule: rails, brackets, drawer runners, hinges where applicable, and the brand or model line.
  • The stated fixing method and any supplementary steelwork or battening you must provide on site.
  • Packaging description and loading plan for the shipment.
  • Production lead time counted from drawing approval, not from enquiry date.
  • What is excluded: installation, on-site making good, structural works.

Send the brief once, get a comparable price

The pattern behind all seven points is the same: wall mounted open wardrobes have no doors and no floor-standing carcass, so wall condition, fixing strategy, storage plan, finish specification and quantities must be settled before pricing. A buyer who sends wall construction, a per-bay layout, finish references, quantities and dates receives an itemised quote that can be compared line by line — and avoids the change orders that appear when a rail is fixed into plasterboard that was never meant to hold winter coats.

Preparing a bedroom or villa package? Send your wall dimensions, per-bay storage list and finish preference to our project team, and we will return an itemised quotation with the fixing details for your contractor. Related collections include metal frame open wardrobes and wood tone open wardrobes.