A tall mirror cabinet looks like a small item on a bill of quantities, and that is exactly why it causes rework. The unit arrives, the tiler has already set the basin position, the wall turns out to be a different build-up than assumed, and the door swing clashes with the vanity drawer. A Santerson Tall Mirror Cabinet is made to measure for each project, so the decisions that matter are taken before production starts, not on site. Below is the checklist we ask buyers, contractors and designers to complete before an order is released.

1. Site measurements, taken from finished surfaces

Made-to-measure sizing only works if the numbers describe the room as it will be at handover. Record dimensions after wall finishes, waterproofing, screed and ceiling heights are settled, not from structural drawings alone.

  • Clear width and height between finished surfaces, including tiles, cornice and skirting.
  • Projection available from the finished wall face, checked against the circulation route in front of the basin.
  • Exact centre line of the basin, tapware and any exposed shower mixer, so the cabinet does not cut across them.
  • Position of downlights, exhaust fans and switch plates that fall inside the cabinet footprint.

2. Wall construction and fixing method

A full-height mirrored unit carries real weight over a long lever arm. The wall build-up determines the fixings, and it is one of the first items our project team confirms with the site team.

  • Timber or metal stud with noggin/backup framing at the fixing lines, confirmed before lining.
  • Masonry or brick, with anchors suited to the substrate and a level, plumb face.
  • Wet-area substrates where penetrations must be limited so the waterproof membrane is not broken.
  • Any recess or niche that changes how the cabinet case sits relative to the tile line.

3. Layout, storage zoning and interior fit-out

Tall units earn their height only when the internal layout matches who uses the room. Specify shelving heights per zone rather than leaving them uniform: daily items within reach, bulk stock higher up, and taller compartments for bottles and styling tools.

  • Shelf spacing for the tallest item that must stand upright on each level.
  • Enclosed versus open storage, and whether sockets inside the cabinet are required for charging or electric toothbrushes.
  • Bottom section used as a laundry integration column, where hamper drawers and appliance clearances change the internal layout completely.
  • Adjacent tall runs such as corner tall cabinets, so depths and reveals align across the joinery package.

4. Door type, mirror finish and clearance for the swing

The door decision is a clearance question disguised as an aesthetic one. Hinged mirrored doors need room to open past the basin tap and any wall-mounted light; sliding options suit narrow bathrooms but reduce the access width per opening.

  • Handedness of hinged doors, checked against the entry door and the shower screen.
  • Glass and mirror finish, edge treatment and whether a demister pad is wanted for wet areas.
  • If lighting is integrated into the mirror face, this belongs to the LED mirror cabinet configuration, and its electrical specification must be confirmed per project.
  • Consistency with other mirrored joinery in the same building, for example mirror sliding door wardrobes, so glass tones and hardware match across rooms.

5. Services, lighting and electrical coordination

Nothing delays a bathroom more than a cable that cannot be reached. Decide the electrical scope on paper before the case is fixed to the wall.

  • Supply point location relative to the cabinet back panel, and whether it must stay accessible after installation.
  • Switch position: inside the cabinet, on the side panel, or on the wall outside.
  • Circuit details for demister pads, internal sockets and any integrated lighting, including who supplies power to the unit and who terminates it.
  • Coordination with the electrician's first fix date, which normally precedes tiling.

6. Sequence of trades and site access

Mirror cabinets are fragile, heavy and finished on all visible faces, so they should be one of the last items into a bathroom. The plan needs to say when.

StageWhat must be settled before it starts
Order releaseConfirmed dimensions on finished surfaces, chosen finish and layout, electrical positions fixed.
First fixBackup framing at fixing lines, cable and socket positions, any in-wall boxing.
Wet works and finishesWaterproofing, tiling and ceiling complete around the unit footprint.
Delivery and storageRoute width, lift or stair access, and a dry upright storage space on site.
InstallationAll wet trades cured; unit fixed, levelled, doors adjusted, then snag list signed off.

7. Delivery, packaging and after-sales records

For imported joinery the paperwork is part of the installation plan. Our logistics and door-to-door delivery service covers freight, packaging and container loading, customs documentation and shipment tracking, so the site team knows which crate holds which bathroom and when it lands.

  • Unit identification matched to the room or dwelling number on the drawings.
  • Inspection at unpacking, with damage reported against the delivery record rather than after installation.
  • Spares carried for hinges, handles and shelf pins where multiple identical bathrooms are involved.
  • The installation and after-sales support scope agreed in writing, including who installs and what is covered afterwards.

8. Sign-off documents to attach to the order

  • Dimension sheet signed against finished surfaces, with tolerances noted.
  • Elevation showing door swing, mirror edge and switch position.
  • Finish and material schedule entry matching the rest of the joinery package.
  • Electrical note naming supply point, circuit and responsibility for termination.

Before you order: send us the bathroom elevation, the wall build-up note and the electrical layout. Our team confirms dimensions, layout, materials and finishes with you before production, so the cabinet arrives ready for the sequence above. Contact SANTERSON to review your bathroom joinery schedule.

SANTERSON has manufactured furniture and building materials since 2008 for villa, hospitality and office projects, supplying mirror cabinets alongside cabinetry, ceramics, lighting, flooring and wall finishes from one factory. Getting the installation plan right on paper is what keeps a small item off the snag list.