A metallic high gloss kitchen can read as a showpiece in a villa or apartment scheme, but it is also one of the least forgiving cabinetry specifications to lock down. Reflective door faces expose every millimetre of wall deviation, every uneven reveal between doors, and every dimension that was measured once instead of twice. The drawing set below is the same list our project team works from when a buyer sends an enquiry: what to measure on site, what to decide before production starts, and what to send with the enquiry so the quotation matches the job you actually have.

Why this finish rewards careful inputs

High gloss surfaces return a mirror-like image of their surroundings. On a metallic high gloss cabinet run, that reflection travels across the whole front elevation: an out-of-plumb wall shows as a bent horizon line, and two doors hung one millimetre apart from plan show as a stepped edge. Matte fronts hide those errors; gloss fronts advertise them.

The metallic pigments add a second effect. The perceived colour of a metallic panel shifts with the angle and colour temperature of the light falling on it, so the same door can look warmer under pendants over an island and cooler under ceiling lights along the run. This is why finish approval and lighting decisions have to move together rather than in sequence.

The site measurements that carry the most weight

Send a plan, but do not rely on an architect's drawing alone for cabinetry fabrication. Finished dimensions on architectural plans are frequently nominal, and they rarely account for tile thickness, screed build-up, or the position of the services you now have on site.

What to measureHow to record itWhy it matters here
Wall lengths at three heightsFloor, mid-height and ceiling lines for each wall in the run; note the shortest and longest readingDifferences between the three readings tell us the wall is out of plumb or bowed, which decides whether scribing, a filler panel or a pack-out detail is needed
Room height at several pointsFloor finish level to soffit, at both ends and middle of each runSets the tall-unit and wall-unit heights and whether a top filler or a scribed cornice is required
Corners and anglesCheck each internal corner with a square; record any angle that is not 90 degreesNon-square corners change carcase geometry and appliance clearances, and they are the most common cause of a late site problem
Appliance locations and modelsSizes and model references for oven, hob, extractor, refrigerator, dishwasher, and any integrated unitsIntegrated appliances need exact recess dimensions and ventilation gaps before the carcasses are cut
Services positionsSocket, switch, water inlet, waste and gas outlet locations with heights from finished floorCut-outs and drill patterns are made in the factory; a wrong socket height becomes a visible hole in a gloss panel
Window, door and skirting linesSill heights, reveal depths, opening direction, skirting depth and heightDetermines where wall units can stop, whether the run must return around an opening, and how the base line is handled
Adjacent floor and wall finishesFinish build-up on both floor and walls, with the finished levels markedCabinet plinths and end panels are built to the completed surface, not to the bare slab or plasterboard
Send photographs of each wall in the run, taken square-on rather than at an angle, plus a photo of any junction where cabinetry meets another finish. A short walkthrough video is often more useful than another drawing.

Project inputs to decide before production

These are the choices that change price and lead time, so it is better to settle them at enquiry stage than after the drawings come back.

Layout and storage plan

  • Who uses the kitchen and how: a single household, short-stay apartments, or a show home that must photograph well.
  • The internal fit you want per zone — deep drawers for pots, pull-out larder sections, cutlery organisation, appliance garages, corner solutions such as carousel or pull-out systems.
  • Whether tall units are full height to the soffit or stop short with a filler above.

For multi-unit work, decide the storage plan once and repeat it across every type. Where the same layout repeats, we can prepare custom built-in kitchen cabinets as project-standard interior fixtures with a fixed set of dimensions and hardware per unit type, which keeps both quotation and installation consistent.

Door style and opening method

Handleless fronts are the natural partner for a gloss kitchen because they keep the elevation unbroken and remove the small shadow lines that hardware casts across a reflective face. Where you want them, tell us the preferred edge detail and whether drawers use push-to-open or a recessed pull; both change the front-edge construction.

Colour, sheen and sample approval

Nominate the colour reference at enquiry — an RAL number, an existing panel you can post to us, or a finish from our range. Then request a physical sample of the actual door construction rather than a printed swatch, and view it on site in both daylight and artificial light before signing off. On metallic gloss this step is not optional; a colour approved on a small card under warehouse lighting can read differently across a full elevation.

Carcase, worktop and hardware pairing

  • Carcase colour and edge thickness, so the interior of open shelves does not clash with the front.
  • Worktop material and edge profile, plus the upstand or splashback detail where the top meets the wall.
  • Hinges, drawer slides, lift systems, legs and brackets — specified as part of the order rather than sourced locally at the last minute.
  • Integrated lighting in wall units and glass-front sections, with the driver positions noted on the drawing.

Delivery and access

Record the lift dimensions, stair widths and turning spaces at the property, and confirm whether assembled units can reach the room. Where they cannot, we crate the run in sections for on-site assembly. For overseas jobs this also sets the packing plan and container loading, which our team arranges under door-to-door delivery.

How to read a quotation once it arrives

A useful quotation for gloss cabinetry itemises the same inputs you sent. Check that it states carcase colour and thickness, door construction and finish reference, the hardware brand and model for hinges and slides, the plinth height, and whether worktops, fillers, scribes and end panels are included or excluded. Where a price is given as a lump sum per run, ask for the unit-by-unit breakdown before you compare it with another supplier.

Also check what is assumed rather than measured: appliance cut-outs, site adjustments, and any packing needed because of access limits. Those are the line items that move most between a first estimate and a production order.

What to send with your enquiry

  • A floor plan with the kitchen footprint marked, plus elevations for each wall in the run if you have them.
  • The measurement set from the table above, taken at finished levels.
  • An appliance schedule with model references and dimensions.
  • Your preferred door style, colour reference and the quantity of kitchens or units required.
  • The project location, target installation date and delivery address.

With those inputs we can return a layout proposal, a 3D view of the elevation in your selected finish, and an itemised quotation. Where a design needs adapting — a different carcase depth, another handleless edge detail, or matching cabinetry for wardrobes and media walls in the same scheme — that work is handled under our custom furniture and OEM service, so joinery across the project shares one set of dimensions and finishes.

Send your drawings and measurement list

Share the plan, the on-site measurements and your finish reference, and our project team will review them against the kitchen layout you are working to. You can reach the enquiry desk through the contact page.