A towel rail looks like the smallest line on a bathroom schedule, which is exactly why it causes trouble. Quantities are guessed, finishes are left open, and the electrical and fixing details arrive late in the job. A request for quote that states the scope clearly gets you a comparable price from the start and avoids a variation order after the wall finish is already installed. Below is the information we need from buyers and specifiers when they ask us to price Santerson Towel Warmers & Rails for a villa, hotel or residential project.

Start with the room, not the product

Towel warmers and rails in this range are configurable: finish, layout and dimensions are set to suit each space rather than chosen from a fixed size list. That means a quote request that only says "towel rail, chrome, 600 mm" cannot be answered accurately for a made-to-measure item. Send us the bathroom layout or a marked-up elevation instead. We can then confirm whether the rail length you assumed actually fits between the vanity and the shower enclosure, and whether the towel hang clears the door swing.

For multi-unit work such as apartment blocks and guest rooms, send the room-by-room schedule with a type code for each bathroom. Repeat types are where pricing differences show up most clearly, because one corrected dimension applied across thirty bathrooms changes both the unit price and the packaging plan.

The information to put in the RFQ

ItemWhat to stateWhy it changes the price
Quantity and unit breakdownNumber of pieces per room type, plus spares for maintenance stockBatch size drives production planning and container loading
DimensionsOverall width and height, projection from the finished wall face, centre-to-centre of fixingsMade-to-measure sizing is priced per configuration
FinishColour or finish name, and whether it must match other ironmongery in the same projectNon-standard finishes are treated separately from the standard option
LayoutRail spacing and bar count, single or double rail, whether a shelf or robe hooks are requiredLayout determines material use and welding steps
FunctionPassive rail or heated warmer, and the control method if heatedHeated units carry electrical components and additional documentation
Electrical specificationSupply voltage and frequency at site, switched or unswitched feed, connection location, and the local requirement for the circuitThe supply standard is set by the destination country, not by us
Mounting conditionWall build-up (masonry, stud with noggin, tile over board), finished wall line, and distance to the nearest wet zoneFixing method and bracket detail depend on the substrate
Related itemsVanity, mirror, vanity lighting or ceramics ordered for the same bathroomCoordinating these in one order reduces separate shipments and finish mismatches
Delivery termsDestination city or port, delivery address, preferred incoterm, required on-site dateFreight mode and packaging are planned around the destination

Specify the electrical and fixing details yourself

Do not leave voltage, earthing or circuit protection to the supplier to assume. Tell us what your local electrician will provide: 110 V or 220-240 V, 50 Hz or 60 Hz, whether the feed is in the wall or the floor, and whether a switched spur or a fused connection unit will be installed. If your jurisdiction requires a specific protection device or a particular class of installation for a bathroom zone, state that requirement in the RFQ and have your electrician confirm it before we finalise the drawing.

For mounting, send the wall build-up. A rail fixed into tiled masonry and a rail fixed into a stud wall with timber noggin between the studs need different bracket details and different fixing sets. Where the finished wall line changes because of a later tile thickness decision, tell us the final face dimension, not the structural dimension.

Coordinate the rail with the rest of the bathroom fit-out

Towel rails rarely fail on their own; they fail because the finish no longer matches what was installed beside them. If you are also ordering Santerson Floating Vanity, mirror cabinets, or Vanity Lighting for the same rooms, put them in one enquiry. We produce bathroom joinery and sanitary accessories under the same project management, so finishes, heights and fixing lines can be checked against a single set of drawings instead of three separate purchase orders.

This is also where custom work pays off. Under our Custom & OEM Service, dimensions, finishes and textures are set to the project rather than taken from a catalogue page, which matters when a design intent calls for a rail that matches a bespoke shower frame or ironmongery set.

What you receive back from us

  • A priced schedule by room type, with each configuration listed separately so you can compare options line by line.
  • A dimensioned drawing of the proposed rail for your approval before production starts.
  • The material and finish description in writing, so the approved sample and the delivered goods are described in the same words.
  • Packing list and container loading plan, plus the shipping documents your customs broker will ask for. Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail with paperwork handled through to the delivery address.
  • Installation guidance and after-sales support for spare parts. See Installation & After-sales Support for the scope of that service.

A short checklist before you send

  • Room schedule with quantities and type codes
  • Marked-up elevations showing the finished wall face
  • Finish selection, and any ironmongery it must match
  • Voltage, frequency, feed location and required protection device
  • Wall build-up and substrate for fixing
  • Destination, delivery address and required on-site date
  • Drawings in PDF plus a dimension list in an editable file
Send the drawings, the wall build-up and the site supply standard in your first message. A quote request that carries those three items comes back priced and drawable; one that does not comes back with questions.

If you want a quotation reviewed against your bathroom schedule rather than a generic price list, send the room types and elevations to our project team and we will return a configuration-by-configuration quote for approval before any production is scheduled.