Open shelving and open storage look simple on a drawing. There are no doors, no hinges, no track to specify. That simplicity is exactly why the material and the finish end up carrying the whole result: every surface is on display, and every shelf edge meets light, hands and whatever is stored on it. If you are specifying Santerson Open Storage for a bathroom fit-out, or an open niche inside a larger storage wall, the comparison work happens before any price is discussed.
The good news is that these units are configurable rather than fixed. The product pages list made-to-measure sizing together with material and finish options, and layouts tailored to each space. That flexibility only pays off if you compare the options on a consistent basis, room by room. Below is a practical way for a buyer, contractor or designer to do that.
Start With Where the Unit Actually Sits
Santerson lists open storage under more than one collection, and the location changes what you should ask for. The same finish that reads well on a living room media wall can be the wrong call in a wet bathroom.
| Location | Typical unit | What to pin down first |
|---|---|---|
| Bathroom, near basin or shower zone | Open Storage, Corner Open Shelving, Freestanding Open Shelves | Splash distance, cleaning regime, towel and toiletry loading |
| Bathroom, tall or floor-to-ceiling storage | Open Shelf Tall Cabinets, Linen Cabinets | Reach heights, shelf spacing for linens, top fixing detail |
| Living room or study wall | Wall Mounted Shelves, Open Display Units | Book loading, span between supports, lighting position |
| Integrated storage wall | Open Display Niches, Full Height Storage Walls | Alignment with closed doors and panels, reveal depth |
A useful habit: write the room, the wall and the exposure on the request for quotation before you write the finish. Two projects that ask for "oak open shelving" can need very different boards once one of them sits beside a shower.
Compare Substrate, Surface and Edge as Three Separate Decisions
Most comparison mistakes come from treating "material" as one line item. In an open unit there are three things to specify, and each one can change independently.
1. The substrate: what the shelf is made of and how far it spans
Open shelves have nothing hiding them, so a board that is too thin for its span shows up quickly as a visible dip at the front edge. For shelving that will hold books, glassware or dense bathroom stock, ask for the board type and thickness, the unsupported span you intend to use, and the shelf spacing you want. The catalogue carries both panel-only open options and framed systems, such as Metal Frame Shelves and Metal Frame Modular Systems, where a metal frame supports the shelving instead of relying on the panel alone. Where loading matters, compare those against an all-panel solution rather than assuming a decorative board will carry heavy stock.
2. The surface: how it looks and how it lives
Santerson's built-in furniture range covers lacquer, veneer, melamine and acrylic finishes across wardrobes, cabinets and panels. Open units are listed as configurable systems in the same collections, with material and finish options on each page, so a finish can usually be carried through from closed doors into open bays and read as one joinery package. Three things to weigh when you choose:
- Sheen. A high sheen reflects light and makes an open bay look brighter, but it also shows fingerprints, dust on shelf faces and every stroke of a cleaning cloth. A matte or low-sheen surface is more forgiving in a busy bathroom.
- Grain direction. Wood-look surfaces read best when the grain runs consistently across shelves, niches and the panels beside them. Say so on the drawing, because mixed grain direction is a manufacturing outcome, not an accident on site.
- Cleaning regime. Ask what the surface is expected to be cleaned with, especially for bathroom storage holding oils, creams and toothpaste residue. The answer should match your maintenance note in the handover pack.
3. The edge: where open storage is won or lost
With no door to frame the opening, the shelf edge and the vertical reveal are the visible detail. When you compare quotes, check whether the price includes a matched edge treatment on the faces of each shelf that will be seen, and how the unit meets the wall and ceiling. A cheaper quote that leaves edges unfinished can look different once installed in raking light.
Carry the Finish Into the Rest of the Room
Open storage rarely stands alone. In villa and apartment work it is usually one element in a wall that also includes closed cabinets, paneling and sometimes lighting. The practical advantage of specifying through one supplier is consistency: the same veneer, lacquer colour or textured surface can appear on your Storage & Display Combo, on adjacent Wood Veneer Panels or Textured Panels, and on the closed units beside them. Each of those pages lists material and finish options, so matching is a matter of specifying the same reference across collections.
Where you want open bays to be lit rather than simply used, ask about the illuminated options in the range. The catalogue lists an Illuminated Display Cabinet and integrated lighting for cabinets and media units, which means the electrical detail belongs in the same conversation as the joinery: driver position, access for maintenance, and switch or sensor location. Lighting added after the fact usually means surface trunking, and that changes the look you specified.
A Five-Column Comparison Sheet That Works
For a project with several open units across several rooms, put every option into one table before you decide. Five columns are enough:
- Room and exposure - dry, splash or wet zone; natural light or artificial.
- Unit type and size - open storage, corner shelving, tall cabinet or niche in a wall system, with the dimensions you need.
- Substrate and span - board type and thickness, or metal frame; maximum unsupported span at your shelf spacing.
- Finish and edge - surface type, sheen, grain direction, edge treatment on visible faces.
- Fixing and services - wall build-up behind the unit, fixing method, any lighting or power inside the bay.
Fill it in per room, not per product. The column that most often changes a decision is the first one: an open bathroom shelf beside a basin and a study shelf holding books are different conversations wearing the same finish.
What to Confirm Before You Order
- Final dimensions taken from the built wall, not the drawing, including skirting, tile set-out and any ceiling shadow gap.
- Intended load per shelf and the resulting span and thickness - confirmed in writing for bookshelves and tall open cabinets.
- The exact finish reference for each surface, with a physical sample approved against the closed units it sits beside.
- Glass specification and any load limits where glass shelving is part of the design.
- Electrical details where lighting is built in: driver location, access panel, control method.
- Wall build-up and fixing detail for wall-hung and floating units, agreed with the site team before the substrate is closed up.
These configurable listings publish made-to-measure sizing and material and finish options rather than a fixed specification sheet. Dimensions, board materials, loading, glass type, hardware, electrical ratings and installation requirements should be confirmed for each selected configuration on your project.
Ordering Through One Joinery Package
If the open storage has to match cabinetry, wardrobes and wall paneling, buying them as one package with a single set of finish references removes a common source of variation: two suppliers interpreting the same wood tone differently. SANTERSON works as a furniture and building materials manufacturer and supplier on villa, hospitality and office projects, with services that cover design coordination, custom manufacturing, logistics and installation support. For buyers managing several trades across a fit-out, that means one set of drawings to reconcile and one production schedule for joinery that has to sit flush with each other.
Send us your open storage layout
Share the room dimensions, the intended use of each bay and the finishes you are already using elsewhere in the project. We will quote the substrate, span and finish combination that suits each location, with made-to-measure sizing for every unit.