A quotation for a corner wardrobe can look complete on the page and still be unusable on site. Below is the checklist we use when buyers compare proposals for open corner wardrobes, so the price, the drawings and the delivery terms in a manufacturer’s proposal all describe the same piece of joinery.

Why Corner Units Are Where Proposals Fall Apart

A straight wardrobe is easy to price: width, height, depth, door type, finish. A corner unit adds a second run that has to meet the first one cleanly, and every unresolved dimension turns into a site problem later. Three things go wrong most often:

  • The corner detail is never drawn. The proposal shows elevations of each leg but no plan view of the junction, so nobody has confirmed which carcass runs through the corner and how the returns are scribed to the wall.
  • Access is assumed rather than tested. An open layout has no doors to clear, which helps in tight rooms, but the diagonal or curved return still has to be reachable from the standing position, or the depth becomes dead space.
  • The finish schedule stops at the front face. Corner joinery shows its returns and end panels from several angles in a bedroom. If only the door faces are priced in the specified laminate or lacquer, the exposed returns arrive in a different material.

None of these are difficult to fix at proposal stage. They are only expensive once the boards have been cut.

What a Complete Proposal Should Contain

Before comparing prices, check that each manufacturer has supplied the same information set. If one supplier quotes from a full drawing pack and another from a sketch, you are not comparing like for like.

Item in the proposalWhat to confirm before accepting
Made-to-measure dimensionsWhether the figures come from a site survey or a design drawing, and which one governs production. For an imported corner unit, the surveyed opening should be recorded in writing.
Internal layoutPositions of hanging rails, shelf stacks, drawer zones and any full-height end bay, drawn to scale rather than described in words.
Corner junction detailA plan view showing the return, the scribe to wall, and how skirting or cornice is handled at the meeting point.
Material and finish scheduleBoard substrate, edge treatment, surface finish for carcass, doors and every visible return; each item named, not left as "as discussed".
Hardware specificationHinge or slide brand and series, load rating, soft-close provision, and which items are included versus optional.
Scope boundaryWho supplies lighting, plinth, scribes, wall fixings and packing; who carries site installation.
Packaging and shipment termsDeclared Incoterms for the shipment, container or parcel loading plan, and what happens if a panel is damaged in transit.
Replacement routeHow a single wrong or damaged panel is re-made and shipped, and at what cost basis.

If any row of that table is missing from a written proposal, ask for it before the price discussion starts. A supplier who will not put the corner junction on paper is telling you how the site problem will eventually be resolved: on your floor, at your cost.

Read the Customisation Terms, Not Just the Price

Corner wardrobes are almost always made to measure, so "custom" appears in every proposal you receive. The useful question is how far that customisation actually goes. A supplier who can adjust only width and height will charge you for the difference through site packing and trim; a supplier who specifies layout, door style and finish per project usually prices the corner correctly the first time.

For our own projects we specify open corner wardrobes, L shaped corner wardrobes and U shaped corner wardrobes from the same Corner Wardrobes collection, with sizing, materials and finishes set per project. That single detail matters when you read a proposal: if the supplier cannot show three different layouts drawn to your room, they are quoting a standard module with a filler panel, not joinery built around the corner.

Ask for the internal layout of each leg separately. A hanging run on one wall and shelf storage on the return behaves differently from two hanging runs meeting at an angle: the second needs a defined rail end and clearance so coats do not jam against the return panel.

Match the Corner to the Rest of the Fit-Out

Corner wardrobes rarely stand alone. In villa and apartment projects they sit in a line with bedroom joinery, and sometimes with kitchen and bathroom cabinetry from the same supplier. Assessing the wardrobe proposal in isolation misses a real cost saving: one manufacturer producing wardrobes, custom minimalist bedroom wardrobes and cabinetry to a single finish schedule keeps colour, grain direction and edge banding consistent across rooms, and puts one production queue behind the whole set.

This is also where a supplier's wider capability becomes a procurement question rather than a marketing claim. If the same partner handles turnkey interior project solutions, they are already coordinating drawings, production slots and shipment consolidation for other trades in your project, and the wardrobe package inherits that coordination. If they do not, you carry the interface yourself.

Seven Questions to Put Back to the Manufacturer

  • Which drawing is the production reference — my architectural set or your shop drawing, and when do I sign it off?
  • Show me the corner junction in plan, with the wall scribe dimensioned.
  • What is the finished external depth of both legs after scribes and skirting are accounted for?
  • Which surfaces of the carcass are finished, and which stay hidden behind returns?
  • Is the hardware included in this price or listed as an option, and what is the replacement lead time for one hinge set?
  • What packaging standard applies to a full-height corner panel shipped by sea?
  • If one panel arrives damaged, what is the re-production and dispatch process, and who pays the freight?

A serious manufacturer answers all seven in writing within one round. Vague answers at this stage predict exactly where the project will stall later.

Delivery Terms Decide Whether a Good Wardrobe Arrives Intact

For buyers sourcing from China, the wardrobe specification is only half of the proposal. The other half is logistics: declared Incoterms, packing method for tall panels, container loading plan, customs documentation and the route to your site. A corner carcass that cannot pass through a stairwell or lift because nobody checked the access at design stage is a design failure, not a shipping one — which is why access should be confirmed before drawings are frozen.

Practical rule: do not let any corner wardrobe go into production until someone has drawn the junction, dimensioned the finished depth of both legs, and named every visible surface in the finish schedule. Everything else on the quotation is negotiable after that; these three are not.

A Short Example From Our Own Process

When we prepare a bedroom package for a villa project, the corner unit is drawn first and the straight runs follow it, because the corner sets the grid for everything else. The proposal we send back includes the plan view, both elevations, an itemised finish schedule, the hardware list, and the shipment terms stated as Incoterms with a named destination. If a buyer receives a proposal that does not read this way, they should ask for the missing sheets before signing, not after.

SANTERSON is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, which is why we read wardrobe proposals the same way we read any other fit-out package: drawings first, finish schedule second, shipment terms third. Our project services cover design coordination, custom and OEM production, logistics and installation as one scope, so the corner wardrobe is drawn alongside the rest of the joinery instead of arriving as a separate purchase order.

Send us your drawings

Share your room dimensions, layout preference and finish reference, and we will return shop drawings with the corner junction detailed, both legs dimensioned, and the full material schedule priced. Project enquiries are answered within 24 hours during business days (GMT+8).

Contact: PHILLIP — Phone / WhatsApp +86-13928214007 — Email santerson@qq.com