A curved bouclé modular sofa is one of the fastest ways to give a penthouse or villa living room a sculptural focal point, and it is also one of the loose-furniture items where a catalogue price means very little. The module count, the radius of the curve, the fabric grade and whether the nesting tables and ottomans travel with the set all move the quotation. If you are specifying this piece for a residential project, here is what to send us so the quote comes back usable rather than approximate.

The reference piece in our custom curved bouclé modular sofa set is a curved sectional upholstered in bouclé fabric, paired with multi-height nesting coffee tables in stone and glass and matching upholstered ottomans. It was developed for high-end penthouse and villa living rooms, and it is produced as custom loose furniture rather than a fixed SKU.

Custom curved boucle modular sofa set with nesting coffee tables and ottomans for a villa penthouse living room

Curved bouclé modular sofa with nesting stone and glass coffee tables and upholstered ottomans, produced as custom loose furniture.

Start with the floor plan, not the photo

The single most useful thing you can send is a dimensioned floor plan of the room. A curved modular set behaves differently from a straight sectional: the back of the curve needs circulation space on all sides, and the overall footprint grows faster than buyers expect once the ottomans and coffee tables are placed. With a plan showing the room dimensions, the position of the glazing, the traffic routes and where the media wall or fireplace sits, we can propose a module combination that fits instead of guessing from a reference image.

If you already have an interior design drawing, send that. As a furniture manufacturer with an in-house design team, we produce loose furniture to design drawings, so a designer's elevation or 3D rendering is enough for us to work from. If there is no drawing yet, tell us the room size and the intended seating count and we will start from there.

The four things that actually change the price

For this type of set, cost is driven by a small number of decisions. Sending them with your enquiry means the first quotation is close to the final one.

DecisionWhat to specify
Module combination and overall dimensionsNumber and type of modules, total length and depth of the curve, seat height and whether you want a lower lounge profile or a standard one.
UpholsteryBouclé, performance fabric, commercial-grade fabric or leather. Name the colour or send a Pantone / fabric reference, and state the abrasion cycle requirement if the piece is for a serviced apartment or shared residence.
Cushion foam density and firmnessSeat comfort preference (soft, medium or firm) and the foam density you want under the seat and in the back cushions.
Tabletop material and base finishStone or glass for the nesting tables, the tabletop thickness and edge detail, plus the finish on any metal base or frame.

Ottomans are optional modules in this set. Tell us how many you want and whether they should match the sofa fabric exactly or work as an accent in a second fabric.

Match the specification to the building type

The same curved silhouette is specified differently depending on who sits on it. A private villa or penthouse usually allows a softer seat and a more delicate bouclé pile. A serviced apartment, branded residence or hotel lounge needs a commercial-grade fabric with a higher abrasion rating and a firmer cushion build, because the piece is cleaned often and used all day. If you are buying across several units, we can hold one frame size and vary the fabric between unit types, which keeps the quotation simpler than re-engineering each room.

Typical applications for this set are luxury private villas, penthouses, high-end serviced apartments and residential interior fit-out projects. Where a project also needs the rest of the apartment furnished, we supply it as part of a wider package: cabinetry, wardrobes, flooring, lighting, rugs and bathroom fixtures come from the same loose furniture and interior fixtures ranges, so finishes can be coordinated across the whole floor rather than matched after the fact.

How the quotation process runs

Our cooperation steps are straightforward: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. For a custom sofa set that usually looks like this in practice:

  • You send the floor plan or design drawing, the module count, fabric preference and quantity.
  • We confirm the proposed configuration and, where useful, send material samples and a production drawing for sign-off before cutting anything.
  • We quote against that confirmed specification, including packaging and the delivery terms you want.
  • After your approval, the set goes into production under our own quality control, with custom and OEM service covering bespoke finishes, textures and branding where required.
Ask us about the details you are unsure of. Fabric grade, foam density and tabletop thickness are easy to change at quotation stage and expensive to change after production. If you do not know which bouclé weight suits a high-traffic penthouse lounge, say so in the enquiry - that is exactly what the design team is for.

Delivery and installation

Modular sofas ship in sections, which is one reason they suit upper-floor apartments: modules pass through standard doorways and are assembled in place. Tell us the lift or stair dimensions and the highest floor of the site, and we will confirm packaging sizes against that. We handle logistics and door-to-door delivery including freight arrangements, packaging and container loading, and paperwork such as commercial invoices and packing lists, and we provide installation and after-sales support on site.

Transit time, import terms and duties depend on the destination country and order size, so we confirm those per project rather than quoting a generic figure.

A short checklist before you send the enquiry

  • Dimensioned floor plan or interior design drawing, with lift or stair access dimensions
  • Number of modules, overall size you need, and ottoman count
  • Fabric family, colour reference and abrasion requirement
  • Foam density and firmness preference
  • Nesting table sizes, tabletop material and base finish
  • Quantity (single piece or multiple units across a project) and destination city
  • Preferred delivery terms and target installation date

Send those seven items and we can come back with a quotation that reflects the set you actually need, not a placeholder price. We work with residential contractors, interior designers and developers on bulk loose-furniture orders, so a single enquiry can cover one penthouse or an entire floor.

Send your drawings for a quotation

Talk to us about a custom curved bouclé modular sofa set for your villa or penthouse project. Contact SANTERSON with your floor plan, quantities and finish preferences, and our design team will prepare a proposal and quotation.