A wardrobe package is one of the most repeated line items in a hospitality or multi-unit residential tender, and it is also one of the easiest to misjudge on paper. Two quotations can carry the same words, "mahogany solid wood wardrobes", and describe completely different buildings of material, joinery and responsibility. The checklist below is written for procurement managers, consultants and main contractors who need to read a proposal properly before award, not after the first site delivery.

Start With What "Solid Wood" Is Actually Covering

In wardrobe tenders the phrase usually describes the door fronts, frames and visible mouldings, while carcasses may be produced in engineered board for dimensional stability. Neither approach is wrong. The problem appears when the proposal leaves the split undefined and the site team discovers it during installation. Ask the supplier to state, member by member, which parts are solid timber, which are veneered or laminated engineered board, and which are back panels and drawer boxes. Our Mahogany Solid Wood Wardrobes page, for example, lists make-to-measure sizing, material and finish options and a project-specific layout, and asks buyers to confirm dimensions and selected specifications per project. That is the level of detail a comparable quotation should match.

A useful test: request one written specification line per component (door panel, door frame, carcass side, top rail, shelf, drawer front, drawer box, back panel, skirting) with construction method and substrate named. If a bidder cannot produce that table, they are quoting from a catalogue, not from your project.

Read the Specification Before You Read the Price

Price comparison only becomes meaningful once every bidder has been asked to price the same construction. Put the following into your request for quotation and require a line-by-line answer.

  • Species and cut. Confirm whether "mahogany" means solid mahogany timber, a mahogany veneer over a stable core, or a mahogany-tone stain on another species. Ask for the sample reference and the cut (flat-sawn or quarter-sawn) for visible components.
  • Finish system. Number of coats, sheen level, lacquer or open-pore oil, and whether the finish is applied in the factory or on site. Factory-applied finishes are far easier to control in a batch.
  • Movement allowance. Solid timber moves across the grain with seasonal humidity change. Ask how the design accommodates that: floating panel construction, controlled moisture content at dispatch, and detailing where the unit meets plasterboard or stone.
  • Carcass stability. For tall wardrobes in heated or air-conditioned rooms, an engineered carcass with solid fronts is often the more stable build. Ask which the bidder has chosen and why.
  • Ironmongery. Hinge brand and grade, slide load rating, soft-close provision, handle specification and cycle-rating evidence where a unit sees guest-room traffic.
  • Internal configuration. Hanging rail heights, shelf spans and thickness, drawer counts, trouser or luggage provision, lighting provision and cable routes. These drive cost as much as the timber does.
One practical caution on terminology: product titles and technical detail blocks on supplier websites are not always worded identically for the same item. Where a name or dimension matters contractually, restate it in your own purchase specification and have the supplier countersign that version rather than referencing a web page.

Check How the Proposal Handles Made-to-Measure Work

Commercial projects rarely repeat identical room dimensions. A bid that prices one standard module and applies it everywhere will fail at site when floor heights, skirting details and service runs change. The proposal should show how measurement, drawing issue and approval are handled:

  • Design and detailing. Who takes the field measurements: the supplier's team or your contractor, and at what stage of completion (screeds laid, services first fix complete).
  • Whether shop drawings with set-out dimensions, door swings and clearance to ceilings are issued for approval before production is released.
  • How variations between rooms are captured: a per-room schedule, not a single generic elevation.
  • Whether mock-up or sample room approval is offered, and what is included in it (finish board plus one full door and one drawer bank).

For fit-out packages where wardrobes sit alongside vanity units, kitchen cabinets, wall panelling and doors, a supplier who produces the whole built-in furniture scope under one detail standard removes a large amount of interface risk. Timber tone, edge detailing and shadow gaps look consistent only when the same workshop draws and finishes them.

Compare Lead Time in Stages, Not as One Number

A single "16 weeks" figure tells you very little. Break it down: sample approval, drawing approval, procurement of timber and ironmongery, production, finishing, packing, then transport to your port or site. Solid timber work needs conditioning time before and after machining, which is exactly where compressed schedules cause splitting and finish defects later.

StageWhat the proposal must state
Design and detailingNumber of drawing rounds, revision cut-off, who signs off
SamplingFinish board and mock-up lead time, cost treatment, approval period
ProductionBatch size per room type, moisture control, factory finishing
Packing and loadingUnit-by-unit labelling keyed to the room schedule, protection of finished faces
Transport and clearanceIncoterms offered, port of discharge, who handles customs clearance and local haulage
Installation and handoverSupervision model, snag list process, spare-parts provision

A supplier running furniture logistics and door-to-door delivery by sea, air and rail can take responsibility for freight, documentation and container loading plan, which matters when wardrobes travel alongside loose furniture, lighting and sanitaryware from several origins. Ask for the packing list format before award and check that each crate reference maps to a room number on your schedule.

Test the Supplier's Ability to Coordinate, Not Just Manufacture

Wardrobe failures on site are usually interface failures: skirting not removed, floor levels out of tolerance, air grilles in the wrong position, doors rubbing a newly laid carpet. A manufacturer who also works as a one-stop furniture and building materials supplier tends to anticipate these because the same team is drawing the flooring, doors and panelling around the joinery.

  • Ask what site interface conditions they require in writing before production release (level tolerance, moisture readings on screed, first-fix services complete).
  • Ask who attends the site meeting at the setting-out stage, and whether drawings are coordinated with the MEP and ceiling layouts.
  • Ask how installation and after-sales support is delivered in your country: local crew, exported supervision, or a trained local partner.
  • Ask what spares are shipped with the batch (extra hinges, shelf pins, matching touch-up finish) and how later replacement doors are ordered against the same colour reference.

Score the Proposals on a Simple Grid

Weighting the criteria before you open the envelopes keeps a cheap bid from winning on price alone. A workable starting grid:

CriterionEvidence to look for
Specification completenessComponent-by-component construction table, named species and finish system
Made-to-measure processRoom schedule, shop drawings, mock-up proposal
Technical risk handlingTreatment of timber movement, carcass choice, site interface conditions
Programme credibilityStaged lead time with approval periods shown separately
Logistics and handoverLabelling to room schedule, Incoterms, snag and spares process
Whole-package coordinationWhether one supplier covers wardrobes, vanities, cabinets, doors and panelling
PriceTotal delivered cost including freight, duty handling, installation and spares, not ex-works alone

If two bids are close, choose the one whose drawings and packing logic you can verify, not the one with the prettiest render. A wardrobe package is judged at handover by how the doors hang and how the finish reads under corridor lighting.

Where to See the Work Before You Award

Ask for project references in your region and check them against something verifiable: room schedules, photographs of installed units, and a named contact who can confirm whether the supplier met programme. Our published project cases include villa and apartment work in Sydney, Melbourne, Perth and North Turramurra alongside hotel and office fit-outs, and we are glad to walk a client through the joinery scope of any of them during evaluation.

Send us your wardrobe schedule. Share room dimensions, drawings and the finish reference you are working to, and we will return a component-by-component specification, staged programme and delivered price for review, with no obligation to proceed. Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or use the form on our contact page.