A wall-hung storage and display system looks simple on a drawing. It is a run of units, some open, some closed, fixed to a wall with nothing underneath. That is exactly why the installation plan matters more than for a freestanding cabinet: there is no base carrying the load, every unit hangs from the wall, and the joints between modules are visible once the piece is finished. When we build Santerson Floating Modular Systems for a residential project, the drawing that reaches the factory should already answer the questions an installer would otherwise ask on site. Here is what belongs in that plan.
1. Wall construction and fixing method
A floating system transfers its weight and any load placed on it into the wall substrate, so the plan starts with what is behind the finish. Record the wall type for every run — masonry, stud partition, tiled surface or an existing joinery panel — together with the fixing detail chosen for it. Where a partition cannot carry the intended loading on its own, the plan should show the reinforcing backing or spreader plate required before the wall is closed up.
This item belongs in the plan rather than in the installer's hands because the reinforcement has to be built in. A wall that has already been plastered and painted limits what can be added afterwards, and a change made on site usually shows on the finished face.
2. Setting-out dimensions and levels
Floating systems are set out from a datum line, not from the floor. The plan should give the height of the hanging rail or bearing line above finished floor level for each run, the height of finished floor level itself at both ends of that run, and the distance to any obstruction above — ceiling, cornice, curtain track or light.
Two details are worth stating explicitly:
- Tolerance on the wall face. Existing walls are rarely flat over several metres. State the acceptable deviation and how it will be handled — packing, a scribed filler, or a shadow gap that absorbs it.
- Where runs start and stop. Note each end condition: a scribed finish to wall, a butt to another unit, or an exposed end panel. End conditions are priced and manufactured separately, so leaving them out of the plan is the most common source of variation later.
3. Module configuration and order
The plan needs a module-by-module schedule, not just an elevation. For each unit: type, width and depth, open or closed, door or drawer orientation, and its position in the run from one end. A numbering system that matches the factory drawings means the person on site can lay units out on the floor in order before anything is fixed to the wall.
If a project mixes systems — for example combining open shelving with closed storage, as in Santerson Mixed Open & Closed Systems — the schedule should show where one system hands over to another and how the transition is detailed. Where a project needs storage that reaches the slab above instead of stopping short, that is a different build-up and fixing detail, which is why Santerson Floor to Ceiling Modular Systems should be specified separately rather than treated as an extension of a floating run.
4. Finish schedule and sample approval
Because these systems are made to measure, finish is selected per project rather than chosen from a short list of stock colours. The plan should carry the finish reference for each surface — carcass, door face, shelf, internal lining and any metal frame — and confirm which surfaces are visible. A single mismatched edge band or sprayed edge reads badly on a floating unit because the whole underside and both ends are in view.
Include who approves the sample and by when. Finish approval usually sits on the critical path: production of the joinery cannot start until it is signed off, and everything downstream shifts with it.
5. Integrated lighting and services
If the design includes lights inside niches or under shelves — as with Santerson Integrated Lighting Systems — the plan must settle this before production, not at installation. Specify the position of each light, how it is switched or dimmed, where the driver sits and how it stays reachable for maintenance, and which trades run the cable to that point.
Cable routes have to be shown on the wall drawing, since a floating unit hides the run behind it. Confirm the electrical specification and compatibility of each fitting for the final configuration; these details are set per project, so they should appear in the plan rather than be assumed from a catalogue.
6. Sequencing with other trades
A floating system is usually one of the last items in a room, and that makes it dependent on everyone else. The plan should state, for each run: whether wall finishes are complete before installation, where flooring is laid up to or under the unit, whether decorating is done before or after fixing, and which other items — curtains, artwork, appliances, headboards — share that wall.
For a project where several rooms receive fitted systems, sequence the rooms as well as the trades. Installing one complete run first gives both parties a reference for the standard expected on the remaining rooms before the rest is fixed.
7. Delivery, handling and access
Long shelf panels and full-height end panels do not always reach the room they belong in. The plan should record the delivery point, the route to the installation area, lift or stair dimensions, and where packages will be stored between delivery and fixing. For projects overseas, this is also where freight arrangements are set out: our logistics and door-to-door delivery service covers freight forwarding, packaging and container loading, customs paperwork and tracking, but the last leg to the room is a site matter that needs someone responsible for it.
State clearly whether goods are delivered complete to the installation floor or to the building entrance. The difference affects labour on both sides and is settled far more cheaply in the plan than on the day.
8. Installation responsibility and sign-off
Name the party fixing the system, the date window, and what a completed installation consists of: units level and secured, doors adjusted, drawers running freely, lighting tested, protective packaging removed and waste taken away. Our installation and after-sales support covers on-site fixing, inspection with a snag list, warranty work and spare parts, so the plan should say which of those apply to this project and who signs the snag list off.
A short joint inspection at handover is worth recording in writing. It fixes the date from which warranty periods run and gives both sides one agreed list of outstanding items instead of two different memories of the visit.
Installation plan checklist
- Wall type and fixing detail for every run, with reinforcement noted where required
- Datum height above finished floor, plus floor level at both ends of each run
- Clearances to ceiling, cornice, curtains and lighting
- End conditions: scribed, butted or exposed end panel
- Module schedule with numbering, sizes, open or closed, door and drawer orientation
- Finish references per surface, with approval owner and date
- Lighting positions, switching, driver location, access for maintenance, cable routes
- Trade sequence: flooring, decoration, other wall items
- Delivery point, route, lift or stair limits, storage area
- Installer, date window, completion definition, snag list and sign-off
Questions buyers ask before we quote
Can a floating system go on a stud partition? It can, with the right backing. The plan has to show the reinforcing substrate and its position before the wall is closed, which means this decision belongs at the design stage rather than on installation day.
What information do you need to produce shop drawings? Room dimensions with floor and ceiling levels, the wall build-up for each run, the intended layout of open and closed units, finish preferences, and whether lighting or cables are involved. Site photographs of the wall help.
Should the whole wall be one system? Not necessarily. Mixing a floating run with floor-standing or full-height units is often the practical answer where loading or services make one build-up unsuitable, as long as each system is specified and detailed on its own terms.
If you are putting together a project that includes fitted living systems alongside other joinery, SANTERSON's turnkey solutions cover design coordination, production and site support across the whole fit-out. Send us the drawings and we will return a configuration and an installation plan your site team can work from.