A finish sample is the single most useful document you can hold before a swim spa shell leaves the factory. It settles arguments about colour, texture and sheen that photographs cannot settle, and it gives both sides something to sign. For buyers specifying the Outdoor Swim Spa WS-PC05ST-L, the review stage is short but decisive: a careful round of checking now prevents a shell that reads grey where you wanted warm taupe, or a jet trim that clashes with the surrounding paving.
The steps below follow how we handle finish approvals on custom and OEM orders, written for procurement staff, project designers and villa owners who are signing off a swim spa as part of a wider outdoor fit-out.
What the sample package should contain
Before you schedule a review, confirm what is actually in the box. A complete approval pack for a configurable swim and hydrotherapy unit normally includes:
- the shell or acrylic surface finish in the selected colour, on a panel large enough to judge at arm's length;
- trim, coping and step materials that sit against the shell, since these set the perceived tone of the whole unit;
- a metal or hardware sample for jet surrounds, handrail and control-panel bezel finishes;
- the lighting sample under both daylight and LED operation, because LED colour shifts how a pale shell reads at night;
- a written specification sheet naming each finish, so the signed sample can be matched to production paperwork.
If any item is missing, ask for it before you sign. A shell finish approved in isolation tells you nothing about how the coping will look beside it once installed.
Check the model and configuration first
The PC05ST family shares a common feature set across three sizes, so a sample that matches one variant does not automatically match another. Compare your signed pack against the specification of the exact model you ordered:
| Item | Catalogue reference for WS-PC05ST-L |
|---|---|
| Overall dimensions | 5490 × 2400 × 1470 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Filter pump | 1 pc |
| Jet total | 6 pcs |
| LED lights | 4 pcs |
| Total power | 6.55 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
Treat these figures as the catalogue reference for this variant. The shorter Outdoor Swim Spa WS-PC05ST and the Outdoor Swim Spa WS-PC05ST-S share the same feature list but differ in overall length, so confirm which variant your drawings call for. Where an item such as the water pump is not stated on the product page, ask us to state it explicitly on the sample sheet rather than inferring a value from a similar model.
Optional accessories are also part of finish review. Catalogue-listed options include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each one introduces surfaces that will be visible on site: an insulated cabinet door, a heat pump housing, a set of steps. Decide the finish for those items in the same round as the shell, not later.
How to judge colour and texture properly
Finish disputes almost always come from bad viewing conditions rather than bad manufacturing. Work through this sequence:
- View in two light sources. Daylight near a north-facing window, then the room lighting you will actually use at the site. Pale shells and metallic trims shift noticeably between them.
- View at the real distance. Hold the shell sample about 1.5 m away, which is roughly how the finished unit reads across a patio, then bring it close to check texture and any surface grain.
- Compare against fixed site finishes. Lay the sample on your paving, decking, external render and coping samples together. A shell colour chosen in isolation rarely matches what was intended once those neighbours arrive.
- Wet one test piece. Outdoor surfaces look different when wet. Dampening a spare offcut of the coping or step material shows how the palette behaves after a splash.
- Check sheen, not just hue. Two samples can share a colour and still clash because one is high gloss and the other satin. Note the sheen level in writing beside each finish name.
Record your decision as a dated sign-off naming every finish, its sheen level and its position on the unit. Photograph the signed pack next to the specification sheet and keep both with the purchase order. That record is what protects you if production deviates.
What to reject, and what to accept
Be precise about tolerance. Some variation between a hand-finished sample and a production shell is normal; a different colour code is not. Raise a correction when you see:
- a finish that does not match the named colour or material reference on the specification sheet;
- trim, jet surround or hardware finishes that were never submitted for approval but appear in the pack;
- surface texture, orange peel or visible seam lines you were not shown as acceptable;
- a sample taken from a different variant of the PC05ST family than the one on your order.
Accept and sign when the finishes match the named references, when every visible component is accounted for, and when you have viewed everything under site conditions. Do not leave the review open-ended; an unsigned sample pack delays production more than a prompt rejection with clear notes.
Fit the spa into the wider outdoor package
A swim spa is rarely ordered alone. Poolside loungers, dining sets and shade structures sit within sight of the shell, so reviewing the spa finish alongside the rest of the outdoor package avoids a mismatch you will notice every day. Our Furniture Series covers aluminium frames, rope weave, wicker and teak-look tops that commonly accompany a pool deck, while the Swimming Pools and Swim Spas range shows the full configurable line. If you are coordinating several categories for one project, our Custom Furniture Materials and Finishes service covers bespoke finishes and material choices across categories in a single production schedule.
Before you send the pack back
- Every finish sample is named on the specification sheet, with sheen level noted.
- The model reference on the sheet matches your purchase order exactly.
- Optional accessories are listed as included or excluded in writing.
- Your sign-off is dated and signed by someone authorised to approve it.
- You have kept a copy of the signed pack, not just the photographs.
Common questions at this stage
Can we approve finishes by email?
You can, but not from photographs alone. Colour and sheen are unreliable through a camera. Ask for the physical pack to be couriered, then return your written sign-off once you have viewed it on site.
What if we want a colour outside the standard range?
Bespoke finishes fall under custom and OEM work. Send us the reference you are working to — a paint code, a stone sample, an existing paving piece — and we will produce a matching sample for your approval before production.
Does the sample pack confirm electrical requirements?
No. Finish approval covers appearance only. Confirm included equipment and the electrical supply needed for your chosen configuration separately, with your own electrician or contractor involved.
Send us your model reference and the finishes you are specifying, and we will prepare a labelled sample pack for review before any production begins on your unit.