Why Two Model Codes Sit on One Swim Spa Listing

When a villa or resort project starts specifying hydrotherapy facilities, the first thing a procurement team usually notices is that swim spa listings rarely come as a single fixed item. The Outdoor Swim Spa WS-S08T1 / WS-S08T2 is a good example: one product page, two model codes, and a long list of options that can be added or left out. That structure is normal for configurable equipment, but it creates a documentation problem. If the paperwork only says "one 7.8 m swim spa", nobody downstream knows which configuration was actually priced, shipped or installed.

This article sets out what procurement teams should record before a purchase order is raised, using the WS-S08T1 / WS-S08T2 listing as the working reference. Everything quoted below comes from the published catalogue entry; items marked for confirmation are exactly the ones the supplier asks buyers to confirm.

Record the Model Pair and the Configuration, Not Just the Size

The catalogue lists both models under one set of dimensions: 7800 × 2200 × 1500 mm. That is a long, narrow shell — a lap-and-hydrotherapy format rather than a family plunge pool — and the footprint drives almost every other decision on site: access routes for delivery, plant-room distance, structural loading and the surrounding deck layout.

What should not sit in the file is an assumption about which of the two codes applies to your project. The listing presents WS-S08T1 and WS-S08T2 as a pair, and the supplier explicitly asks buyers to confirm included equipment and electrical requirements for the selected configuration. So the requisition should carry three separate lines:

  • Model code requested — state WS-S08T1 or WS-S08T2 in writing, with the date it was confirmed.
  • Catalogue dimensions — 7800 × 2200 × 1500 mm, plus any site-specific deviation from those figures.
  • Confirmed equipment list — what is included in the chosen configuration versus what has been added as an option.

A single sentence such as "configuration confirmed by e-mail on [date]" saves a great deal of arguing at handover, because it fixes which version of the specification everyone is working to.

The Published Specification Sheet: What You Can Rely On Now

These are the figures shown on the site for this listing. Treat them as catalogue values to be verified against your quotation, not as a substitute for it.

ItemCatalogue valueProcurement note
ModelsWS-S08T1 / WS-S08T2Record the selected code on the purchase order.
Dimensions7800 × 2200 × 1500 mmCheck against site access and deck setting-out drawings.
Control system1 setConfirm the control location and who operates it daily.
Swim training system1 setDefines the intended use: exercise lap swimming, not just soaking.
Water pump2 pcsConfirm duty and standby arrangement for your application.
Filter pump1 pcNote the filtration cycle expected by the supplier.
Jet total50 pcsRecord jet layout if seating positions matter to the design.
LED lights / small LED lights4 pcs / 28 pcsConfirm control grouping and any ambience scenes required.
Total power9.55 kWElectrical load to be checked by the site engineer, not assumed.
Features shownWater jets, LED lighting, ozone, swim training systemOzone is a water-treatment method; confirm dosing and maintenance duties.
Do not lock in numbers that the source itself flags as variable. The 9.55 kW total power figure belongs to the configuration shown on the page. Add a heat pump, sand filtration or UV sterilisation and the connected load changes. Put the confirmed load for your specific order in the electrical schedule after the quotation is signed, and keep the catalogue figure only as background.

Options and Accessories: Document Each One Separately

The catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options. Availability and compatibility vary by model, so each line needs its own confirmation rather than a general "as per catalogue" note.

  • Heat pump — the single biggest driver of running cost on an outdoor spa in a cool climate. Ask what water temperature the unit is expected to hold, and at what ambient condition.
  • Insulation — relevant wherever the spa sits outdoors through a cold season; record the insulation method as well as whether it is supplied.
  • Sand filtration vs. standard filter pump — note which filtration route was chosen, because it changes consumables and the maintenance schedule handed to the facilities team.
  • UV sterilisation alongside ozone — both appear in this range. Document which treatment combination is being bought and what chemical dosing remains necessary.
  • Steps — an access item that architects often assume is included. Confirm whether steps are supplied, and who builds the surrounding platform.

For hospitality work this list matters commercially as well as technically: options change both the unit price and the maintenance obligations you inherit after handover.

Site Conditions Worth Writing Down Before Order

Configurable equipment causes most of its disputes at the interface between the supply package and the builder's scope. For a 7.8 m shell with a published load figure that depends on configuration, the following should be settled in writing before production starts:

  • Structural support — who designs and constructs the slab or plinth, and to what loading figures.
  • Electrical supply — cable size, protection device and isolator location, based on the confirmed load for the selected configuration.
  • Delivery route — whether the shell can reach the position on site, and whether a crane is needed.
  • Drainage and plant access — where backwash water goes and how service staff reach the pumps and filter.
  • Daily operation duties — who reads the control system, logs treatment and reports faults.

A short interface schedule covering these five points is usually enough to prevent the common delays. Attach it to the enquiry rather than sending it after the order.

How a Configurable Spa Fits a Wider Procurement Package

Swim spas are rarely bought alone. On villa and resort projects they arrive as part of a broader package that also covers poolside lounging, pergolas, outdoor dining sets and interior fixtures. Coordinating those items through one supplier reduces the number of interfaces to manage — which is precisely why turnkey solutions for villa, hospitality and office projects are structured around design coordination, production, logistics and installation as a single workflow.

Where a standard catalogue model does not suit the plot — an irregular terrace, a curved deck, a spa set into an existing landscape — the range also includes customizable shape outdoor spas with acrylic shells in square, round, oval and curved formats. If you go that route, your documentation gains a drawing-approval step: the shape, seat positions and jet layout all need sign-off before tooling.

For buyers comparing footprints within the same family, the wider swimming pool and swim spa range lists shorter and deeper alternatives. A 7.8 m shell suits sites with a long, narrow outdoor axis; on a compact terrace a shorter model may free up deck space for circulation and seating.

Rule of thumb: if a specification line cannot be pointed at a confirmed document — quotation, drawing or e-mail — it is not yet a specification. It is an assumption with a number attached.

A Practical Documentation Checklist

  • Selected model code (WS-S08T1 or WS-S08T2) and the date it was confirmed.
  • Catalogue dimensions 7800 × 2200 × 1500 mm, plus any agreed deviation.
  • Included equipment versus optional accessories, item by item.
  • Confirmed connected load for the selected configuration, separate from the catalogue figure.
  • Water treatment route: ozone, UV, sand filtration, and remaining chemical dosing duties.
  • Interface schedule: structural support, electrical supply, delivery route, drainage, service access.
  • Spare parts, warranty terms and response arrangements as actually quoted.
  • Handover record for the facilities team: control system operation, filtration cycle, maintenance intervals.

Common Questions from Buying Teams

Why does one page cover two models?

Configurable ranges group closely related variants to keep the catalogue readable. The differences sit in included equipment and electrical requirements, which is why the listing asks buyers to confirm the configuration rather than letting the model code decide on its own.

Is 50 jets a fixed number for my order?

It is the catalogue figure for the configuration shown. Jet count and layout follow the selected option set, so confirm both against your quotation if seat positions matter to the design intent.

Can I use the 9.55 kW figure in my electrical design?

Use it as an early planning reference only. Final cable sizing should follow the load confirmed for your exact configuration, once options such as heat pumps or additional pumps have been settled.

Specify your configuration before you compare prices

Send us the model code you need, the site dimensions and the option list you expect — heat pump, insulation, filtration and treatment included — and we will confirm what is supplied in that configuration, along with the electrical requirements.

Phone / WhatsApp: +86-13928214007 (PHILLIP) · Email: santerson@qq.com · Contact page