Why Sliding Door Details Must Be Settled Before Production Starts
A made-to-measure wooden sliding door is one of the few interior elements that cannot be corrected after it leaves the factory. Panels, tracks and openings are all cut to each other, so a dimension that is off by a few millimetres, or a floor covering that arrives later than the door, becomes a site problem rather than a shop drawing note. Our Santerson Wooden Sliding Doors are configured project by project — size, material, finish and layout — which means the buyer's confirmation list decides how smoothly production runs. The checklist below is the same one our team works through with villa, hotel and apartment clients before a door order is released to manufacturing.
1. Opening Dimensions at the Finished Level
Sliding doors are measured against finished surfaces, not structural shells. Before we quote, please confirm:
- The clear opening width and height after wall finishes, floor levels and ceilings are complete.
- Whether the specified size is a rough opening or a completed opening — the two give different frame sizes.
- Floor-to-floor height on both sides of the opening, especially where tiling, screed or carpet will change the running level.
- Wall build-up and total wall thickness, which determines how a pocket door sits inside the partition and how a bypass set sits in front of it.
For villa and apartment projects where several identical units repeat, we recommend confirming one representative opening on site and recording every deviation from it. Repeating an incorrect dimension across ten rooms is far more expensive than checking it once.
2. Door Type and Operating Layout
"Sliding door" covers several different products with different structural requirements. Tell us which behaviour you want, and we will match the hardware and frame to it:
- Bypass panels that slide past each other in front of the wall — common for wardrobes and room dividers.
- Pocket doors that disappear into the wall cavity, which need a pocket formed to our frame depth.
- Surface-mounted sliding panels on exposed tracks, useful in renovations where the wall cannot be opened up.
- A flush, wall-aligned look, as on our Santerson Flush Sliding Doors, where the panel and frame sit in one plane.
Also confirm the number of panels, which panel is the active one, and the direction of travel. If a matching wardrobe or storage wall uses sliding fronts instead, we can coordinate the two — see Wooden Sliding Door Wardrobes for the built-in furniture version of the same detail.
3. Track, Hardware and Load Assumptions
The running gear is decided by panel size, panel weight and how often the door is used. Please confirm with us:
- Top-hung or bottom-rolling operation, and whether a floor guide or recessed track is acceptable.
- Panels per opening and single or double action, since this sets track length and load rating.
- Soft-close, push-open or plain latch hardware, and any lock or privacy requirement for bathrooms and bedrooms.
- Whether the sub-floor or header can carry the panel weight, and who is responsible for that support — our team will state the load requirement in the shop drawing so your contractor can prepare it.
Where a ceiling, bulkhead or partition is still being designed, send us the section as early as possible. A pocket formed to the wrong depth is one of the most common causes of on-site modification.
4. Material, Core and Finish Selection
Our Custom & OEM service covers bespoke material, finish and texture choices, so the specification should be locked before production. Confirm:
- Panel core and construction suitable for the location and use.
- Surface material — painted, laminated, veneered or solid timber — and the exact colour or grain reference.
- Finish sheen and edge detail, plus whether both faces of a room-divider panel need to match the two rooms it separates.
- Whether frames, architraves and skirting should be produced in the same material and finish so they arrive together.
Colour and grain are best approved from physical samples rather than screen images, particularly for wood tones that need to match flooring or cabinetry already specified on the project. Details of what can be customised are on our Custom & OEM Service page.
5. Glass, Ventilation and Interface Elements
If the design includes glazed panels or a mixed timber-and-glass arrangement, these items need separate confirmation: glass type and thickness, obscure or clear glazing, grille pattern, and whether any panel must be removable for maintenance. For openings that also carry services — curtains, pelmets, lighting switches or skirting breaks — please share the setting-out so we can allow for them in the frame.
6. Quantities, Batching and Site Sequence
Confirm the schedule of openings: door mark, location, size, type and quantity for each. Then confirm how delivery should be batched against your site programme, since sliding doors are usually one of the later trades on site. Our logistics team arranges freight by sea, air or rail with customs paperwork and door-to-door delivery, described on the Logistics & Door-to-Door Delivery page. Tell us the destination port or site address early so packaging, container loading and handling sequence can be planned around it.
7. Installation Responsibility and Handover
Decide in advance who installs the doors: your local contractor or our installation support, outlined on the Installation & After-sales Support page. Either way, we supply setting-out drawings with the order so openings, pockets and floor levels can be checked before panels arrive. Please also confirm the inspection and sign-off method at handover — panel alignment, smooth travel, latch engagement and finish condition are all best recorded while packaging is still on site.
Send us your door schedule
Share the opening sizes, drawings and finish references for your project and our team will return a configuration and quotation matched to them. As a single supplier for furniture and building materials, we can also produce matching wardrobes, wall panelling and cabinetry in the same material and finish — see One-stop Solution and our Windows and Doors range.