A wood veneer hinged door looks finished the moment it leaves the factory, and looks wrong the moment a site team opens the wrong carton. The difference is rarely the door leaf itself. It is whether the buyer wrote down the finish decisions clearly enough that a factory 9,000 kilometres away could build them without guessing. Below is the confirmation list we ask buyers to complete before we start production on Santerson Wood Veneer Hinged Doors, and it applies just as well to the flush, concealed, pocket and sliding versions of the same idea.

Why veneer doors generate more confirmations than painted doors do

A painted door leaf has one visible variable: colour. A veneered leaf has several at once - species, cut, grain direction, matching pattern, sheen, edge treatment and how the face meets the frame. Each of those is a decision somebody has to make on paper before a sheet is cut. Our product pages describe these doors as made-to-measure, with material and finish options specified per project, which means the specification you send is what gets built.

The second reason is coordination. In villa and hospitality fit-outs, the same veneer usually appears on wood veneer wall panels, cabinetry and wardrobe fronts as well as on doors. When those items come from different suppliers, small differences in tone and grain become visible the moment they sit side by side on one wall. Buying them together under one-stop furniture and building materials procurement means one batch of veneer, one pressing schedule and one set of approved samples.

Confirmation 1: species, cut and how the grain runs

"Oak" is not a specification. Before production we need:

  • Species and origin preference - oak, walnut or another species named on the approved sample.
  • Cut - rotary cut, sliced, quarter-cut or book-matched, because each produces a different figure on a tall door face.
  • Grain direction - vertical on the leaf, and whether horizontal grain is acceptable anywhere.
  • Matching pattern across multiple leaves - book-match, slip-match or centre-match for pairs and sets.
  • Colour and grain tolerance - what variation between leaves you will accept, since veneer is a natural material.

For pairs of doors at a corridor or a master suite entry, say so explicitly in the order. Book-matched pairs are a production decision, not something a factory can infer from a quantity of two.

Confirmation 2: sheen and topcoat

Sheen changes how a veneer reads under project lighting far more than most buyers expect. A matte surface flattens the figure; a higher-sheen surface throws light across it and makes every grain change visible. In our catalogue you will see both approaches - matte finish veneer fronts and high gloss veneer fronts - and the same choice exists for doors.

Confirm three things in writing:

  • The sheen band you approved, stated as a number or by reference to a signed physical sample.
  • The topcoat type agreed for that location, especially where the door sees hands, cleaning agents or humidity.
  • Which sample is the governing reference - the one you signed and dated, with your project name on it.
Practical note: a sheen approved against a small offcut under warehouse lighting can look different on a full-height leaf under warm 2700 K downlights. Approve a full-size or near-full-size sample before the order goes into production, and keep the signed sample on site as the handover reference.

Confirmation 3: edge, face thickness and how the leaf meets the frame

This is where veneer doors most often disappoint, because the detail sits at arm's length rather than across the room.

  • Edge construction - whether the edges are solid timber lipping, ABS or another edge band, and in what colour.
  • Veneer wrap on edges - grain continuity around the edge, or a butt joint, and which arrises get which treatment.
  • Leaf thickness and total opening size - measured on site against the finished floor level, not taken from a drawing revision.
  • Frame and architrave profile - reveal depth, whether the frame is flush with the wall or set proud, and how the architrave meets skirting.

If your design calls for a door that disappears into the wall, the confirmation list changes shape. Santerson Flush Hinged Doors, decorative concealed doors and handleless concealed doors all depend on the wall build-up being known before the frame is made, because the finish line of the door has to be set against plasterboard thickness, insulation and the final wall finish.

Confirmation 4: ironmongery cutouts and the hardware schedule

Veneer does not forgive a late change. Once the face is pressed and the topcoat is applied, cutting a new hinge pocket or lock bore on site risks chipping the face around the cutout.

Item to confirmWhy it has to be fixed before production
Hinge type, count and positionDetermines pocket depth and leaf thickness allowance; concealed hinges need the cutout shown on the shop drawing.
Lock, latch and strike setBore diameter and backset must match the leaf construction you ordered.
Handle or pull, and whether the door is handlelessA handleless detail requires a routed edge or recess agreed in advance.
Door stops and closersAffects frame profile and how the reveal reads once closed.
Hinge hand for every openingLeft- and right-hand leaves cannot be swapped on site without visible consequences.

Send your ironmongery schedule with the order, and ask for a shop drawing that shows every cutout dimensioned. Sign that drawing, not just the quotation.

Confirmation 5: sizing data, and who measured it

Our door listings are configured as made-to-measure with layout tailored to the project, so the numbers we work from should be second-fix dimensions taken on site after the floor finish is in. Please confirm:

  • Clear opening width and height at three points each, plus diagonal checks for square.
  • Finished floor level, and any floor covering thickness still to come.
  • Floor clearance you require under the leaf, particularly in bathrooms and laundry areas.
  • Wall build-up and stud line positions where concealed frames fix.
  • Whether any opening is out of plumb and who owns the remedial work.

A dimension taken from a construction drawing before the wet trades finish will be wrong by enough to matter. When we produce wood veneer pocket doors or wood veneer folding doors, the wall cavity depth and track position have to be known at the same moment, because the frame and the pocket are built as one assembly.

Confirmation 6: how the door relates to the rest of the joinery package

Doors rarely stand alone. In a villa or apartment package they sit next to panelling, media walls and cabinetry in the same veneer. Buyers regularly ask us to match:

Where matching matters, request that doors, panels and cabinetry be produced from the same veneer batch and confirmed against one shared sample board. Ask for a mock-up corner on site - door leaf, panel, skirting and architrave together - before mass production is released.

Confirmation 7: packaging, sequence and site handling

Veneer leaves are the most easily damaged items in a fit-out box. Confirm these before shipment:

  • Labelling by room and opening number, matching your door schedule exactly.
  • Leaf orientation in the crate - flat or upright - and edge protection on the arrises.
  • Delivery sequence by floor or zone, so early arrivals do not sit in a corridor for six weeks.
  • Storage conditions on site: dry, off the ground, acclimatised to the conditioned environment before fitting.

Our logistics service covers freight forwarding by sea, air and rail with customs paperwork, packaging and container loading planning, shipment tracking and door-to-door delivery. Terms, duties, insurance and transit arrangements are agreed per project rather than assumed, so confirm the Incoterms on your quotation.

A short pre-production checklist

#Confirm before production starts
1Veneer species, cut, grain direction and matching pattern per leaf set
2Sheen value and topcoat, referenced to a signed physical sample
3Edge construction, arris treatment and architrave/frame profile
4Ironmongery schedule and dimensioned shop drawing for every cutout
5Second-fix site dimensions, finished floor level and required floor clearance
6Batch and sample alignment with panelling and cabinetry in the same veneer
7Labelling, packing orientation, delivery sequence and on-site storage rules
8Inspection and snag process at handover, plus spare parts arrangement

Where these doors sit in our range

The hinged collection includes classic panel hinged doors for more traditional interiors and standard interior hinged doors for straightforward room partitions. Where the design wants a clean, frameless wall line, look at flush interior doors and flush sliding doors. The full category is listed under windows and doors, alongside our wider interior fixtures range.

For projects that need a specific construction, size or veneer that does not appear in the catalogue, our custom and OEM service covers bespoke material finishes and textures alongside prototyping - see custom furniture design and manufacturing. Fitting, inspection and snagging are handled through installation and after-sales support, with warranty terms and spare parts confirmed per order.

Send us your door schedule. A room-by-room list with opening sizes, veneer reference, sheen and ironmongery is enough for us to price accurately and flag anything ambiguous before production starts. If you are coordinating doors with panelling and cabinetry in the same finish, tell us - we will arrange one shared sample board rather than three separate approvals.