A set of classic wooden hinged wardrobes is one of the few items in a bedroom fit-out that cannot be adjusted after it leaves the factory. Panel mouldings, door heights and internal layouts all depend on numbers that are fixed at the quotation stage. Before a manufacturer can price the work, the project team needs to hand over a defined package of measurements and decisions. The list below is what we ask for on residential and villa projects, and why each item matters.

1. Room Dimensions Taken at Three Depths

A single tape measurement of the wall is not enough for a built-in wardrobe. Walls in new builds and renovated villas are rarely square or plumb, and a run that measures 2,400 mm at floor level can measure 2,370 mm at head height. We ask for the wall length at floor, mid-height and ceiling level, plus the room depth at both ends of the run.

Take the height in several places as well, because a suspended ceiling, a beam or a services duct running above the wardrobe line changes what the carcass can be. Note the position of any skirting board, architrave or radiator that has to be cut around or worked behind.

Send dimensions as a simple sketch with numbers marked on it, in millimetres, and state which figures are finished-floor-to-finished-ceiling. Photographs of the wall, taken square-on from both ends, resolve most of the questions that a drawing leaves open.

2. Clearances That Decide the Door Type

Hinged doors need swing room in front of them. Measure the distance from the wardrobe face to the opposite wall, to the bed, and to any chest or sideboard that will sit in the walkway. As a working check, allow enough standing room for a person to dress comfortably in front of an open door; where that space is not available, the run should be reconsidered as sliding or wooden sliding door wardrobes instead of hinged.

Also record the position of doors and windows that open into the same wall plane, plus any light switch, thermostat or socket that a carcass side would cover. These fix where the run can start and end.

3. Layout Inputs: What Has to Be Stored

Internal configuration is a decision the project team makes, not the manufacturer. Before we draw the elevation, tell us:

  • The hanging split — long garments, shirts and jackets, or double-hang rails for shorter items.
  • How many drawers are wanted, and whether they sit in a low bank or at chest height.
  • Shelf depths and the tallest item to be shelved, such as boxes or folded bedding.
  • Whether shoe storage, a trouser pull, a valet rod or an ironing bay is required.
  • Lighting inside the carcass, and whether wiring must be concealed in the panel.

For shared family bedrooms and guest rooms, we usually split one run into assigned zones so that each user has their own hanging and drawer block. For a compact bedroom, the same principle applies at a smaller scale — see our custom minimalist bedroom wardrobe work for handleless, high-capacity layouts.

4. Finish and Panel Detail Decisions

Classic wooden hinged wardrobes are defined by their door detail: raised or recessed panels, arch profiles, moulding widths and the style of the handle or knob. Send us a reference image of the door you want, together with the wood species and the stain or paint colour. Where the wardrobe has to match existing joinery — a classic paneled solid wood wardrobe already on site, a door set, or a vanity unit — include a sample or the make and model of the existing piece so the grain and sheen can be matched rather than approximated.

Confirm the surface treatment for the interior as well. A lacquered or laminated interior wipes clean; a natural wood interior smells warmer but marks more easily in a walk-in with high use.

5. Project Inputs Beyond the Wardrobe Itself

For apartment blocks, villas and hotel room packages, the following information lets us quote the whole package at once rather than one room at a time:

InputWhy it is needed
Room-by-room schedule with quantitiesGroups identical runs so that carcasses, doors and hardware are produced as one batch.
Floor plan and elevations, PDF or DWGCross-checks the site dimensions against the design intent before production starts.
Finish schedule and hardware selectionFixes handles, hinges and soft-close specification across all units.
Delivery address and access notesDetermines packaging, crate size and whether panels can reach the room intact.
Installation responsibilityClarifies whether our team fixes on site or your contractor does, from drawings we supply.
Programme datesSets the production sequence so that wardrobes arrive when the room is ready for them.

6. Who Measures on Site

On villa and apartment projects we handle site measurement ourselves before cutting any panel, as part of the one-stop service that runs from design consultation through production to installation. Where a local contractor measures instead, we check their numbers against the drawings and flag anything inconsistent — an out-of-plumb wall, a floor level that changes along the run, or a ceiling that drops below the design height. Catching these on paper costs nothing; catching them at installation costs a remake.

A Short Checklist Before You Send an Enquiry

  • Wall length at three heights, room depth, ceiling height — in millimetres.
  • Obstructions: skirting, beams, ducts, sockets, switches, radiators.
  • Swing clearance in front of the run, and confirmation that hinged doors are workable there.
  • Internal layout: hanging split, drawer count, shelf depths, accessories, lighting.
  • Door profile reference image, wood species, colour or stain, handle style.
  • Any existing joinery the new work must match.
  • Quantities per room, delivery address, access route, installation responsibility, required dates.

Send that package and a manufacturer can return a drawing you can sign off, rather than a provisional price that moves later. Dimensions and selected specifications are confirmed for each project before production begins.

Send us your dimensions

SANTERSON manufactures made-to-measure hinged, sliding, corner and walk-in wardrobes for villas, apartments and hotel projects, with material and finish options specified per project. Share your room measurements, layout requirements and finish references through the contact page, and we will prepare drawings and a quotation for review.