A swim spa quotation is only useful when it prices the same thing twice. For a configurable product such as our Outdoor Swim Spa WS-S07M, two buyers can send the same model number and receive quotes that cover different pumps, different treatment options and very different site works. The request for quote (RFQ) is where that gap gets closed. Below is what a purchaser should put in writing before we can price the unit properly.

Start with the model, then state what the model does not tell you

The model code fixes the shell and the baseline equipment list. For WS-S07M the catalogue shows a shell of 7000 x 2200 x 1480 mm, one control system, three water pumps, one filter pump, a jet total of 40 pieces, two LED lights and a total power figure of 10.75 kW, with water jets, LED lighting, ozone, a waterfall and four water columns shown as features. Quote that exact configuration first, so both sides are comparing the same baseline.

Then write down what you still do not know. The captured specification sheet for this model does not list a swim training system, while closely related models in the same series do. If your programme assumes lap swimming against a current, say so in the RFQ and ask us to price it as a line item rather than assuming it is included. Never let an option live inside a lump-sum number.

Baseline as published for WS-S07M

  • Shell size: 7000 x 2200 x 1480 mm
  • Control system: 1 set
  • Water pumps: 3; filter pump: 1
  • Jet total: 40 pieces
  • LED lights: 2
  • Total power: 10.75 kW
  • Features shown: water jets, LED lighting, ozone, waterfall, 4 water columns

List the options you want priced separately

The catalogue for this range carries options such as additional control systems, UV sterilisation, extra water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility change with the model, so an option that is quoted on one shell may not fit another. Ask for each option as its own numbered line with a unit price, and ask us to mark clearly which options are included in the base price and which are additions.

Heating and insulation deserve their own paragraph in the RFQ, because they drive both the purchase price and the running cost. State the installation location, the ambient conditions you expect the unit to sit in, and whether you want the spa usable year-round or only in warmer months. That lets us quote a heat pump and insulation package matched to your duty rather than a generic add-on.

Give the site conditions, not just the product

Most swim spa disputes after delivery are about the building works, not the shell. Put these in the RFQ so the quotation reflects real installation:

  • Above ground, semi-recessed or fully recessed installation, with the finished surround level you want.
  • Slab or plinth details and the load the base must carry when full.
  • Access route for delivery, including gate width, turning space and whether a crane or long carry is needed.
  • Electrical supply available on site: phase, voltage, available capacity against the published total power figure, and where the isolator will sit.
  • Drainage, water fill connection and any plant-room or equipment-access requirement.
  • Local permitting, electrical standards and inspection duties, which remain with the buyer's local contractor unless agreed otherwise in writing.

We publish total power for each model, but we do not design your switchboard. Attach a one-line load schedule from your electrician and the quotation conversation moves much faster.

State quantities, phasing and the delivery terms you expect

A single villa spa and a twelve-unit resort block are quoted differently. Tell us the quantity, whether units deliver in one shipment or in phases, and the site address or addresses. Then state your preferred Incoterms and destination port or door, along with the import documents you will need. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, packaging and container loading, customs paperwork and shipment tracking, so we can price to a delivered basis if you ask for it. Ask for the packing list dimensions and container type in the same quotation; that number decides your on-site handling plan.

Attach the drawings and finish references

Where the swim spa sits inside a wider package, attach the layout drawing. Our interior design services cover space planning, product specification and production coordination, so a plan lets us check clearances for steps, waterfall splash zones and maintenance access before the order is placed rather than after. Also state the cabinet or finish preference, and any matching outdoor furniture from the outdoor furniture range that should be quoted in the same package.

Ask the questions that expose hidden cost

  • Which items are included in the base price, and which are optional extras?
  • What is not included: site works, electrical connection, craneage, permits, start-up commissioning?
  • What spare parts are supplied with the unit, and how are replacements ordered later?
  • What warranty terms apply to the shell, pumps, jets and controls, and what voids them?
  • Who handles installation supervision, and in what form is that support provided?

These five questions turn a brochure price into a comparable quotation. If two suppliers answer them differently, you can see immediately where the difference in price comes from.

Specification note: figures above are transcribed from the published product page for WS-S07M and apply to the standard configuration. Confirm the equipment list, electrical requirement and option availability for your selected configuration before you place an order.

A short RFQ checklist to paste into your enquiry

  • Model: Outdoor Swim Spa WS-S07M, and any variant or option codes
  • Quantity and delivery phasing
  • Installation method and base/substructure detail
  • Electrical supply data and load schedule
  • Heating, insulation and treatment options requested
  • Access route and handling constraints
  • Incoterms, destination, required import documents
  • Drawings, finish references and any matched outdoor furniture
  • Warranty, spares and installation support expectations
  • Quotation validity period and price-break basis

Send the model code, quantity and site conditions together and we can return a configuration-by-configuration quotation for Outdoor Swim Spa WS-S07M as part of your wider villa or hospitality package. Enquiries go through our contact page.