A swim spa submittal is the document package a buyer, architect or contractor reviews before an order is confirmed. For the Outdoor Swim Spa WS-PC06ST-L, the package has to do two jobs at once: prove that this exact configuration fits the site, and give the procurement team enough written detail to compare it fairly against other models. Below is the checklist we work to when we prepare a submittal for this model, and what you should expect to receive back.

Start With Identification, Not Marketing

The first page of a usable submittal states unambiguously which unit is being quoted. For this model that means the model code WS-PC06ST-L, the catalogue dimensions of 6390 x 2400 x 1470 mm, and the product photograph from the Swimming Pools and Swim Spas range. A submittal that carries only a brochure image and a trade name is easy to misread later in a project, particularly when several models in the same series share a shell design and differ mainly by length and options.

Where a specification field is not published for a model, say so. The captured data for WS-PC06ST-L lists one control system, one swim training system, one filter pump, six jets in total, four LED lights and a total power figure of 6.55 kW, while the water pump is not listed for this model. A good submittal flags that gap and states what is supplied instead of leaving the reader to assume the standard arrangement applies.

Configuration and Options Must Be Listed Item by Item

This model sits in a configurable outdoor swim and hydrotherapy range, so two quotations carrying the same model code can contain different equipment. The submittal should therefore separate standard content from options, with each option named and priced or marked as excluded. Options recorded in the catalogue for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps.

  • Standard equipment: quantity, output and function for the jets, filter pump, control system, swim training system, lighting and ozone treatment.
  • Optional equipment: heat pump sizing, water pump, UV sterilization, sand filtration, insulation package and access steps, each marked included or not included.
  • Substitutions: any component swapped for an equivalent, with the reason and the changed specification.
Read the total power figure together with the option list. A heat pump changes connected load far more than the shell does, so a published total power number describes one configuration only. Ask for the load of the configuration actually quoted.

Site Conditions: Structure, Services and Access

Most swim spa disputes on site are civil or electrical rather than product faults, and this is the section where a thin submittal causes the most rework. The document should state what the receiving structure has to carry, what supply the unit needs, and how the assembled or delivered unit reaches its final position.

Structural and substrate information

  • Unit footprint of 6390 x 2400 mm and overall height of 1470 mm, plus the tolerance that applies to setting out.
  • Loaded weight guidance for the filled shell with users, and the bearing requirement for the slab, deck or plinth beneath it.
  • Whether the installation is above ground, recessed or partly recessed, and what perimeter access is needed for maintenance.

Electrical and plumbing information

  • Supply requirements for the quoted configuration: phase, circuit rating, protective device and any isolator or residual-current protection to be provided locally.
  • Location of the control panel relative to the shell, and who routes the final connection.
  • Drain, overflow and water-fill arrangements, including where the fill and drain points should sit before the shell is positioned.

Electrical and drainage requirements vary by configuration and by local regulations, so the submittal should present these as requirements to be confirmed with your engineer rather than as assumptions carried over from another project. We ask our project team to return this section signed off by the local consultant before production is released.

Documentation to Attach

Alongside the specification sheets, a complete package for a project buyer normally includes:

  • Dimensioned drawings showing plan, elevation and the position of equipment access panels.
  • A general arrangement drawing with maintenance clearances marked.
  • Control system description and operating instructions, in the language required for handover.
  • Water treatment and dosing guidance for the selected sanitation package.
  • Packaging and lifting notes, so the site team can plan unloading and placement.
  • The warranty terms and spare-parts list that apply to the quoted configuration.

Commercial Terms and Delivery Scope

Project buyers compare packages, not prices, so the submittal should state the delivery and service boundary in writing. As a one-stop furniture and building materials supplier, we handle swim spa orders as part of a wider fit-out package: design consultation and space planning, material and product specification, manufacturing and quality control, then logistics, installation and after-sales support. For this model the commercial section should confirm the quotation validity period, production lead time for the selected configuration, packaging list and container loading plan, freight mode and Incoterms, import documentation such as commercial invoices, packing lists and certificates of origin, and the delivery point agreed on site.

Where a swim spa travels with other goods from the same project, say whether it ships consolidated or separately. A shared container reduces freight cost but changes sequencing on site, and that trade-off belongs in the submittal rather than in a later email.

How We Prepare Yours

Send us the model code, the intended installation condition and the option list you want priced, and we return a submittal covering the sections above for review by your architect or engineer. If you are also sourcing poolside furniture, outdoor seating or other interior fixtures for the same development, we can group them under one procurement package so that specification, delivery and handover run on a single schedule. Enquiries through our contact page receive a reply within 24 hours during business days.

Request the WS-PC06ST-L submittal package. Include your project location, installation type and required options, and we will confirm the equipment list, electrical requirements and delivery scope for that configuration before you commit to an order.