A wall-hung vanity looks simple on a drawing. It is one of the few bathroom items where the cabinet, the countertop, the basin, the mirror and the waste all have to agree with each other before anything is cut, tiled or fixed to the wall. When buyers shortlist a Santerson Floating Vanity, the questions that decide the outcome are rarely about style. They are about what sits behind the wall, where the drainage falls, how the unit is supported and who signs off the final dimensions.
The floating vanity range is configurable rather than fixed: Santerson lists made-to-measure sizing, material and finish options, and layouts tailored to each project. That flexibility is useful for villas, serviced apartments and hotel room bathrooms where the space rarely repeats, but it moves decisions forward to the specification stage. The detail below sets out the project inputs that change the product you actually receive, and what to send with an enquiry so the first quotation is close to the final one.
What a configurable floating vanity does and does not fix
A standard-size unit from a catalogue arrives with its dimensions already settled, and the design has to bend around it. A made-to-measure unit does the opposite: the width, depth, drawer layout, countertop and basin arrangement are drawn to the room, which is why these vanities appear so often in villa and hospitality fit-outs where several bathrooms share one detail standard but not one wall length.
The trade-off is that nothing is decided until you decide it. Two projects ordering a "1200 mm floating vanity with two drawers" can end up with different products depending on the countertop edge, the basin type, the carrier system and where the services sit. For procurement teams this means the specification has to be written before the order, not corrected during production.
The wall build and what is behind it
A floating vanity carries its own weight plus the countertop, basin, tapware and the things stored inside it, all of it transferred into the wall rather than the floor. The wall build therefore has to be settled before the unit is made:
- Substrate and fixing method. Stud partition, framed timber wall or masonry each take a different carrier and fixing pattern. Santerson's bathroom storage and vanity items are listed as project-configurable, so the supporting structure is part of the specification conversation rather than an afterthought on site.
- Solid blocking or a steel carrier. Where the wall build cannot take fixings at the required centres, reinforcement is added inside the cavity. This has to be located before the lining is closed up, which puts the vanity decision ahead of the wet-area works in the programme.
- Tile set-out against the unit. The height the vanity sits at determines where tile rows break and where the skirt or shadow gap falls. Confirming the mounting height with the tiling set-out avoids a finished wall that no longer matches the drawing.
Drainage: waste position, trap type and floor falls
This is the detail most often left too late. A floating vanity usually drains through the wall or down through the cabinet into the floor, and which one you use changes the cabinet build:
- Wall waste or floor waste. A wall waste needs the outlet set at the right height and offset from the centre line; a floor waste needs clear access through the base of the unit. The base construction is not the same for both.
- Trap type and access. S-trap and P-trap arrangements suit different service locations. Some basins in the Santerson range are offered with more than one trap option, which shows how much the waste route matters to the final fit.
- Fall to the waste. In wet areas and ensuite layouts, the screed fall has to reach the floor waste without conflicting with the cabinet footprint. Send the drainage drawing, not just the plan.
Countertop, basin and tapware: three dimensions that have to agree
The vanity carcass, the top and the basin are usually specified as separate line items, which is where mismatch errors appear. Deck-mounted basins sit above the surface and raise the usable height; undermounted basins sit below it; an integrated top forms both in one piece. Each choice changes the countertop thickness, the cut-out, the tap reach and the splash line at the back wall.
For stone and marble tops, note that Santerson Stone & Marble Surfaces are also made to project dimensions with material and finish options. That means the top can be sized to the vanity instead of the vanity being cut down to a stock slab size, but it also means the countertop template should follow the confirmed cabinet drawing.
Tapware is generally supplied by others on a project, so three numbers need to travel with the order: spout reach relative to the basin bowl, the mounting hole count and pattern in the top, and the clearance between the basin rim and any upstand at the rear. Confirming these before production prevents a site fix that involves re-drilling a stone top.
Storage layout: drawers, doors or open niches
The internal layout is where daily use is won or lost, and it interacts with the waste route because plumbing takes space inside the cabinet. Practical options to specify:
- Drawers above the waste line, deeper storage below. Where the cabinet height allows it, this keeps everyday items accessible without fighting the trap.
- Mirror cabinets and tall storage as companions. A compact floating vanity often works best when toiletries move into a Santerson LED Mirror Cabinet or matching storage units, which are specified to the same finish family so the bathroom reads as one joinery package.
- Consistency across multiple bathrooms. On villa and apartment projects it is common to keep one drawer configuration and vary only the width. That keeps hardware, finishes and detailing identical while each unit still fits its own wall.
Finishes in a wet room: what to state on the order
Bathroom joinery lives in a cycle of humidity, cleaning products and temperature change. Rather than relying on a general claim about water resistance, specify what you need and have it confirmed back in writing:
- Board and substrate construction for wet-area use, plus the edge treatment on all four sides, since exposed edges are where swelling starts.
- Finish system and colour reference, matched against a physical sample under the room's lighting rather than a screen image.
- Hardware specification: hinge and runner type, load rating, and whether handles are used or a handleless profile is required to match the rest of the joinery.
- Ventilation assumptions for the room. Enclosed ensuites with poor air exchange put more stress on any finish than a ventilated main bathroom.
Lighting and electrical points around the mirror zone
Vanity lighting is set out at the first-fix stage, so it should be drawn together with the vanity and mirror. Santerson Vanity Lighting is part of the bathroom lighting and accessories range and is likewise specified to project dimensions and finishes. The points to lock before the wall closes: mirror height, sconce or backlight position, switch location outside the splash zone, and the supply for any illuminated mirror cabinet.
How the same room reads against the other vanity types
| Vanity type | What it suits | Project detail it depends on |
|---|---|---|
| Floating vanity | Small ensuites, villa and hotel bathrooms where a clear floor line makes the room read larger and floor cleaning stays simple | Wall substrate, blocking or carrier, waste route behind the unit |
| Single Vanity | One-basin family bathrooms and guest WC layouts with a conventional floor-mounted build | Floor waste location, skirting and tile break lines |
| Santerson Double Vanity | Principal bathrooms and master ensuites with two basins side by side | Two waste routes, tap centres, elbow room between users |
| Santerson Integrated Countertop Vanity | Projects wanting one continuous top and basin with fewer joints to maintain | Top material, cut-out and fall to the waste confirmed as one assembly |
Where these vanities are being specified
Santerson is a China-based manufacturer and one-stop supplier of furniture and building materials, working from an operating base established in 2008. Bathroom joinery rarely travels alone on the projects this range suits: villa and apartment work typically packages vanities with wardrobes, kitchen cabinetry, doors, wall panelling, flooring and lighting so that finishes are produced together rather than matched across separate suppliers.
Published project references include residential work in New South Wales and Western Australia — Platin Housing Willoughby, Platin Housing North Turramurra, Platin Housing Perth, plus modern villa projects in Sydney and Melbourne. The case pages carry the scope actually delivered on each job, so treat them as evidence of the kind of work undertaken rather than a list of interchangeable specifications.
Figures quoted on the site for factory area and export share differ between pages, and service claims such as response times and warranty terms are stated in marketing copy. Ask for current written confirmation of any number that has to appear in a contract, specification or project report.
A short checklist before the order is placed
- Room set-out with fixed dimensions: wall lengths, clear opening heights, door swing and the position of any returning wall.
- Drainage drawing showing waste location, height above finished floor and trap type.
- Wall build detail for the fixing wall, including reinforcement locations.
- Vanity width, depth, mounting height and internal layout, drawn to the confirmed set-out.
- Countertop material, thickness, edge profile and basin type with cut-out dimensions.
- Basin and tapware schedule: spout reach, hole pattern, clearance to rear upstand.
- Finish reference from a physical sample, plus hardware type and handle style.
- Mirror and lighting positions, switch location and supply points for the first-fix stage.
- Delivery route, access to the site, and who carries out installation and checks the finished work.
Questions buyers ask most often
Can one project mix floating vanities and floor-mounted units in the same finish? Yes, provided the carcass construction, veneer or lacquer system and hardware are specified identically across both types. Confirm this at quotation stage rather than assuming the finish names match between ranges.
What happens if the wall cannot take a wall waste? The unit is built for a floor waste instead, which changes the base panel and access. This needs to be settled before production, because it is not a field modification.
Are basins and tapware included with the vanity? It depends on the package quoted. Send the basin and tapware schedule with the enquiry so the top cut-out, hole pattern and spout reach are confirmed against the items actually being installed.
Can several bathrooms be ordered at different sizes but the same detail? That is the normal way these units are specified: keep the layout, finish and hardware constant, and vary only the width to suit each wall.
If you want a floating vanity checked against your drawings, send the set-out plan, the drainage detail and the wall build for the fixing wall, together with the basin and tapware schedule. The Santerson project team reviews those inputs before quoting, so the first proposal reflects the room rather than a catalogue size — start at the contact page.