A handleless, flat-front kitchen in a villa or apartment renovation usually looks simple on paper and complicated on site. The visual clarity of Minimalist Slab Melamine Cabinets depends almost entirely on information supplied before production starts: exact room dimensions, the level and plumb condition of the walls, appliance models, and a clear decision on door style and finish. This guide lists the inputs we ask project buyers, contractors and designers to provide so that a make-to-measure melamine cabinet package can be quoted, built and installed without avoidable rework.

The cabinet range is made to measure, with material and finish options and a layout tailored to each project. Dimensions and selected specifications are confirmed for every order, so the list below is a checklist of what we need from you rather than a set of standard sizes.

Start with the room shell, not the door style

Flat slab fronts expose every irregularity in the surrounding structure. Where a framed shaker door can absorb a few millimetres of variation, a full-height slab door running floor to ceiling cannot. Before choosing a finish, record the shell:

  • Overall run lengths for each wall, measured at three heights and three depths rather than one point, so out-of-square walls are visible in the drawings.
  • Floor-to-ceiling height at both ends of every run, plus the finished floor level. In renovation work the existing floor is rarely level across a whole kitchen.
  • Wall plumb and squareness, noting which wall the tall units will sit against.
  • Positions of soil stacks, waste outlets, water supply points, gas points and the electrical consumer unit, each measured from a fixed corner and from the finished floor.
  • Window and door head heights, opening widths, and the swing direction of any door that crosses a cabinet run.
  • Radiator positions, skirting heights, and whether the skirting is being removed behind the runs.

Send photographs of each wall with a tape measure visible. A short set of good site photos resolves more queries than a long email exchange.

Measure the appliances before you measure the cabinets

Appliance envelopes drive most of the carcass dimensions in a minimalist kitchen, because integrated units are sized around them. For each appliance, provide the manufacturer's cut-line drawing rather than only the retail product page:

ItemWhat to record
Refrigeration columnNiche width, depth and height; door hinge side; ventilation gap required at the base and rear.
Oven and microwaveNiche width and height, required clearance behind, and whether the control panel is front-vented.
DishwasherNiche width, door type, and whether the plinth is continuous or cut back.
Hob and extractionHob cut-out size, extractor type (ducted, recirculating or integrated in the hob), duct route and the ceiling or wall opening it needs.
Sink and mixerBowl dimensions, deck thickness, waste position and whether a disposer or water filter occupies the base unit.

Where appliances are not yet selected, tell us which category you intend to use. We can then size the niches to a commonly available envelope and note where a change of model would affect the carcass.

Decide the door and drawer specification

Slab melamine doors are specified by surface, edge and opening method. Each choice changes both appearance and price, so confirm them before quotation:

  • Surface finish. The melamine kitchen range includes matte, high gloss, textured, wood grain and two-tone options, alongside the minimalist slab door. If a project needs a warm timber look without real veneer, Wood Grain Melamine Cabinets are the closer match; for a soft, low-sheen surface, see Matte Melamine Cabinets.
  • Edge treatment. State whether edges are to be matched on all four sides and whether visible returns face into the room. In open-plan layouts, the side of a tall run is often in view from the living space.
  • Opening method. Handleless runs need either an integrated profile or a push mechanism, and the choice affects the gap detail at walls and ceilings. Related options are shown under Handleless Minimalist Kitchen Cabinets.
  • Drawer versus door. Base units specified as drawers need different internal fittings than hinged doors. List the tall and base units you want as drawer stacks, and note intended loads such as small appliances or provisions.
  • Colour reference. Quote a recognised colour system reference or send a physical sample. Screen-rendered colours are not an acceptable basis for production approval on a project of any size.

Supply the internal fit-out and worktop information

Interiors and horizontal surfaces are where a minimalist kitchen either works or frustrates its users day after day:

  • Worktop material, thickness and edge profile, plus whether the upstand is continuous with the worktop or a separate piece. Send a template or measured drawing for any non-rectangular counter.
  • Splashback method: matched melamine panel, glass, stone, or tiled wall built by others. This determines whether we supply panels to size.
  • Internal fittings you want quoted: larder racking, corner solutions, cutlery organisation, bin housings and appliance shelving.
  • Lighting: whether under-cabinet lighting is required, where transformers may sit, and who provides the wiring. If lighting is included, we coordinate it with carcass drilling so that fittings are concealed.
  • Appliance integration details, including handleless kick-and-pull or servo-drive openings on integrated oven and dishwasher doors.

Project information we need alongside the drawings

For residential renovations, apartment blocks and hospitality fit-outs, the commercial and programme inputs matter as much as the dimensions:

InputWhy it matters
Unit count and repeatsDetermines whether identical carcass sets can be repeated across units, which simplifies both production and site installation.
Delivery destination and accessSite access, lift dimensions and floor level affect packaging and container loading plans for door-to-door delivery.
Installation responsibilityState whether your trades fix the cabinets or whether installation support is required from us.
Approval drawings and sign-off routeTells us how many revision rounds to expect and who signs off the final elevation set before production.
Programme datesThe on-site completion date drives the production schedule and the shipping method chosen for the consignment.

Our services cover design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, and final installation and handover. For kitchens that form part of a wider fit-out, Custom Built-in Kitchen Cabinets can be specified together with vanities, wardrobes and media walls so that finishes are consistent across the project.

Common specification errors we see on site

  • Measuring before the flooring is laid. A tall unit specified against a structural slab will not fit once the finished floor is installed. Confirm the finished floor level in writing.
  • Ignoring the return of a run. A handleless run that stops short of a wall needs a deliberate shadow gap or a scribe; leaving it to the fitter produces an uneven reveal.
  • Appliance substitution after production. Changing an integrated oven for one with a different venting requirement can make a completed housing unusable. Freeze appliance models before the drawings are released.
  • Mixed colour references across suppliers. Where another trade supplies panelling or doors, match references from the same batch system rather than assuming close visual equivalence.

Frequently asked questions

Can you work from an architect's drawing instead of site measurements? Yes, as a starting point. Elevations and plan layouts let us prepare a first proposal quickly. We then confirm dimensions against the actual site before production, because tolerances in the completed structure are what determine fit.

Do you supply appliances? The cabinet package is supplied with worktops, internal fittings and integrated lighting coordinated as required. Where appliances are included in a project order, we size the carcasses around the selected models; confirm at enquiry which items you want quoted.

What if the site dimensions change after order? Tell us as early as possible. Carcass sizes can be revised while drawings are still open for comment; once panels are cut, changes become additions rather than amendments.

Send your floor plan, elevations with the measurements listed above, appliance schedule and finish references, and we will return a proposal for Minimalist Slab Melamine Cabinets sized to your project. Contact SANTERSON to start the specification review.