A patterned acrylic kitchen looks very different from one quotation to the next, and most of that difference comes down to what was on the drawing when the price was calculated. If you are sourcing patterned acrylic cabinets for a villa or apartment fit-out, the information you hand over at the start decides whether the first number is close to the final one — or whether you spend three weeks going back and forth over drawings.
Here is what our estimating team actually works from, and what happens when each item is missing. Use it as a checklist for your own enquiry.
Start With the Room, Not the Door Finish
The pattern on the door is the part everyone talks about first, and it is usually the easiest thing for us to price. What takes longer is establishing what the cabinet carcass has to do in the space. Before we quote, we need the kitchen layout at a usable level of detail:
- A dimensioned floor plan showing wall lengths, ceiling height, and the position of windows, doors, radiators and any structural columns.
- The run of the base units, wall units and tall units — in millimetres, taken on site rather than scaled off an architect's drawing.
- Notes on obstructions: soil pipes, flues, meter cupboards, skirting that will be removed or kept.
- Appliance schedule with make and model for built-in oven, hob, extractor, dishwasher, fridge and any wine cabinet, so the tall and integrated housings can be sized around them.
When we receive a mood board and a wish list but no dimensions, we can only give a budget range per linear metre. That is fine for an early feasibility check, and it is useless for a purchase order. If you have site drawings, send them; if you do not, tell us the room size and we will work with what exists.
The Four Things That Move the Price of the Acrylic Itself
| What we ask | Why it matters to the quotation |
|---|---|
| Panel size and cut layout | A pattern has a direction. Tall doors that must match across a run need extra sheet material for grain-matching, so a wide door bank costs more per unit than the same area cut randomly. |
| Pattern reference and scale | A sample code, photograph or physical swatch tells us whether the repeat is fine or broad. Broad repeats mean more offcut, and offcut is what you are paying for on a small kitchen with many narrow doors. |
| Edge treatment | Wrapped edges and mitred edges are both available in our acrylic range, but they are not the same job. Mitred edges on patterned panels need careful alignment and are quoted separately. |
| Handle or handleless | A handleless run needs routed profiles or a channel system at the top and bottom of doors and drawers, which changes both the panel specification and the hardware list. |
If you are still deciding between finishes, it helps to see them in the same family. The acrylic collection also covers high gloss acrylic cabinets, matte acrylic cabinets and metallic acrylic cabinets. A common and sensible specification pairs a patterned or metallic door with solid-colour carcasses inside, so the pattern reads on the outside without repeating where nobody sees it.
Interior Specification Is Half the Quote
Customers often assume the door is the product. In a made-to-measure kitchen, the interior specification is where most of the line items sit, and each one has to be settled before we can price honestly:
- Carcass material and colour — matched to the door, contrasting, or neutral inside.
- Drawer configuration — number of drawers per unit, drawer side style, and whether soft-close is standard on your project.
- Baskets and corner solutions — pull-out larder units, carousel or magic-corner fittings for an L-shaped corner cabinet, tip-out bins.
- Tall and integrated units — oven towers, fridge housings and appliance panels, which need the appliance schedule above to be correct.
- Worktop — often quoted separately; if you want it from us, send the thickness, edge profile and sink/hob cut-outs.
- Lighting — under-carcase and in-cabinet lighting has to be planned during production, not added afterwards.
None of these are difficult decisions. They are just decisions, and the quotation gets sharper with each one you make.
Project Context Changes What We Recommend
A single villa renovation and a multi-apartment handover are quoted differently even with identical kitchens, because the delivery pattern differs. Tell us:
- Quantity — one kitchen, or the same layout repeated across several units. Repeats let us cut in batches and hold a consistent pattern match across doors.
- Destination and access — the delivery address, floor level, lift dimensions and whether there is a service entrance. A third-floor apartment with a narrow lift arrives in more packages than a ground-floor house.
- Who installs — your own fitter, our on-site team, or a local contractor we brief. This decides whether assembly drawings and fixing details go to you or to us.
- Programme — the date the kitchen must be on site, and the date the site is actually ready to receive it.
For projects where cabinetry is only one part of a wider fit-out, we handle it alongside the other interior fixtures rather than as an isolated order. Our custom and OEM service covers bespoke finishes and material selection, and our logistics and door-to-door delivery covers freight, packaging and customs paperwork to the site address. Coordinating cabinetry with the flooring, wall panelling and lighting it has to sit against avoids the classic problem of a kitchen delivered before the walls are flat.
What a Complete Enquiry Looks Like
If you want a usable quotation in one round rather than three, send these together:
- Site-measured drawings or a plan with dimensions, plus photographs of the room.
- A pattern reference — code, sample number or a posted physical swatch.
- The appliance schedule and worktop decision.
- Your preferred interior configuration, or simply a note saying "propose something" if you would rather we start from our standard specification.
- Quantity, destination address and required on-site date.
A practical shortcut: if the drawings are not finished yet, send what exists anyway. We will quote the elements that are fixed — door material, run length, unit count — and flag the open items in writing. That gives you a defensible budget figure while the detail is still moving, instead of nothing at all.
The Questions We Will Ask You Back
Expect us to come back on three points in particular, because they are where patterned acrylic behaves least predictably:
Pattern direction across the run
Do you want the pattern running the same way on every door, or mirrored around a central axis? Mirroring looks deliberate and costs less material; uniform direction looks like one continuous surface and needs more.
Where the panels meet other finishes
Acrylic doors meeting stone, tile or a wall panel system need a defined reveal and a decision about who supplies the trim. We would rather settle that at quotation stage than on site.
Sample approval before production
For patterned surfaces we recommend approving a physical door sample, not a printed image or a screen proof. Pattern depth and sheen read differently in person under your own lighting.
All cabinet dimensions, finishes and fittings on this page are made to measure for each project. Specifications shown are options to discuss, not standard items held in stock, and final details are confirmed against your drawings before production begins.
Send us your drawings and pattern reference and we will come back with an itemised quotation you can take to a client or a budget holder. SANTERSON is a China-based manufacturer of furniture and building materials working on villa, hospitality and apartment projects; contact our team to start one.