A swim spa shell is one of the few items in a villa or resort package where a colour mismatch cannot be corrected after the fact. Once the shell, cabinet cladding and trim of Outdoor Swim Spa WS-PC02 are formed, assembled and packed, a finish that reads wrong under site lighting becomes an expensive argument rather than a simple change. The sample stage is where that risk is removed.

The steps below describe what a buyer or project manager should ask for, check and sign off before the order enters production, using WS-PC02 as the reference model.

Why finish samples matter more on a swim spa than on furniture

With cabinetry or seating, a wrong tone can often be re-finished, re-upholstered or replaced piece by piece. A swim spa behaves differently. The shell is formed as one unit, the exterior cladding wraps a fixed frame, and the whole assembly ships in a single container with the pump, filter and control assemblies already wired to it. Three conditions make the sample review worth the time:

  • Outdoor light changes the perceived tone. A neutral shell sample can look warmer or cooler under direct sun than it does indoors, and it will read differently beside pale stone paving than beside a dark timber deck.
  • Water shifts the perceived tone. The interior surface is seen through 1,050 mm of water with lighting running, so the dry sample and the filled basin are two different visual results.
  • Adjacent finishes have to agree. The cabinet cladding has to sit correctly against the pool deck, coping and exterior wall finishes already specified for the site.

What to request before production starts

For a configured unit, ask for physical pieces rather than photographs or on-screen renderings. A practical request list for WS-PC02 covers:

  • A shell surface sample in the selected interior finish, large enough to judge under raking light.
  • A cladding or trim sample in the chosen exterior finish, with the same edge treatment the production unit will have.
  • Hardware and accessory pieces — steps, handrail, control panel surround — in the finishes stated on your quotation.
  • The specification sheet for the exact configuration you ordered, so the sample can be checked against it line by line.

Where a project already has finish samples approved for other scopes — decking, wall panels, cabinetry — send those across as well. Our team matches the swim spa finishes against your existing approved palette instead of working from a description in an email.

How to evaluate the samples on your side

Judge the pieces where they will actually be installed, not on an office desk:

  • Test at the site. Hold the shell and cladding samples against the prepared deck area, checking both a shaded side and a side that takes direct sun. The same sample can read warmer or cooler depending on which way it faces.
  • Check wet and dry. Wet the shell sample and view it through a shallow tray of water with the site lighting on. This is the closest preview of the filled basin available before production.
  • Compare against the approved palette. Lay the cladding sample beside your paving and wall finishes. Note the result in writing, including where it was viewed and under what light.
  • Confirm the specification, not just the look. Check the model designation and configuration details on the sheet that comes with the samples, so the approved finish is tied to the exact build you are ordering.

Keep the signed-off sample. It becomes the reference for the pre-shipment inspection, and it settles any later question about what was agreed.

Configuration details to confirm in the same review

Finish approval is the natural moment to close out equipment choices, because both are locked at the same point. The catalog entry for WS-PC02 records the following:

ModelWS-PC02
Catalog dimensions3000 × 3000 × 1050 mm
Water pump / filter pump2 pcs / 1 pc
Jet total60 pcs
LED lights1 pc
Control system1 set
Total power7.35 kW
Features shownWater jets, LED lighting, Ozone

Catalog-listed options for this range also include UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so confirm each item for your configuration before the order is released — a heat pump or sand filtration package changes both the plant layout and the power supply the site has to provide.

The 7.35 kW figure above is the total power recorded in the catalog for WS-PC02, and it applies to that catalog configuration. Added options change the electrical load, so hand the confirmed configuration to your electrician before first fix rather than after delivery.

Where this fits in the order process

SANTERSON works as a one-stop furniture and building materials supplier, supplying project packages for villas, hospitality and office developments. The cooperation steps we follow run from the project brief and design proposal through quotation and detail confirmation to production, shipment and follow-up. Finish sample approval sits inside the detail confirmation step, which is why it should be completed before any production slot is booked.

If the swim spa is part of a wider package — swimming pool and swim spa products together with outdoor furniture, wall panels, lighting or cabinetry — sample review can be grouped so all finishes in the package are approved in one pass. That avoids a situation where the spa arrives in a tone that no longer matches a deck or cladding finish revised months later.

A short checklist

  • Physical samples requested for shell, cladding and trim — not photos.
  • Samples viewed on site, in sun and in shade.
  • Shell sample assessed wet and under lighting.
  • Cladding compared with approved paving and wall finishes.
  • Configuration sheet checked line by line, including options such as heat pump, sand filtration and insulation.
  • Electrical load confirmed with your electrician after the configuration is fixed.
  • Approved sample signed, dated and retained for pre-shipment inspection.

Send us the model, the finishes you are considering and the site photographs of the installation area, and we will prepare the samples and the matching configuration sheet for review before production is scheduled.