Why the Brief Matters More Than the Drawing
A glass paneled wardrobe sits at the meeting point of joinery, glazing and hardware. Get the brief wrong and you inherit a set of doors that rattle, a finish that does not match the rest of the bedroom, or a carcass that will not clear the skirting on site. A short, precise written brief sent before any drawing is produced saves more rework than any amount of later correspondence.
The Glass Paneled Wardrobes in our Classic Paneled collection are made to measure for each project, with the finish, layout and dimensions specified room by room. That flexibility is exactly why the specification needs to arrive complete. Below is the information we ask buyers, builders and designers to send, and what each item changes on the production floor.
Start With the Opening, Not the Wardrobe
Send dimensions of the space, not a nominal wardrobe size. For a built-in, we need the width at high, mid and low points, the depth in at least three places along the wall, and the floor-to-ceiling height at both ends of the run. Floors and ceilings in renovation work are rarely square, and a single tape measurement taken at one corner will not reveal that.
- Note obstructions: skirting boards, architraves, light switches, air-conditioning returns, downlights, door swings and radiators.
- State the wall build-up. Plasterboard on studs behaves differently from masonry when it comes to fixing a frame or a top panel.
- Tell us whether the wardrobe is built into an alcove, run along a flat wall, or returned around a corner, and give the internal corner dimension.
- Confirm the finished floor level. A carpet, timber or tiled finish changes the required plinth height.
Decide How the Glass Reads Before You Choose a Colour
"Glass door" covers a wide range of visual results. The same panel layout looks different depending on whether the glazing is clear, frosted, ribbed or smoked, and whether the glass sits inside an aluminium frame or is worked into a paneled door.
| Glass type | What it does in the room | Best suited to |
|---|---|---|
| Clear | Opens up the wall and reflects light, but shows everything inside | Styled interiors where contents are kept tidy |
| Frosted | Softens the reflection and hides contents while still passing light | Smaller bedrooms, shared rooms, hotel guest rooms |
| Ribbed | Adds vertical texture and diffuses the view rather than blocking it | Contemporary schemes that want detail on a flat wall |
| Smoked or bronze | Tints the reflection and reads as a darker, heavier surface | Villa bedrooms, boutique-style dressing rooms |
Frame material is the other half of the decision. An aluminium frame around glass panels gives a slim, crisp shadow line and stays dimensionally stable across a wide door. A hinged glass door lets you open the full face of the wardrobe at once, while sliding glass doors suit rooms where a bed or an en-suite entry leaves no clearance for a door to swing.
If you want the panel work of a classic wardrobe with a glazed centre, say so in the brief. That combination sits between collections, and telling us early means we detail the rebates and the glass thickness together rather than adapting one design to fit the other.
Specify the Interior Layout Around How You Actually Store Things
Glass on the outside makes the interior visible, so the internal layout is part of the appearance. Tell us what has to hang, what has to be hidden and what should be displayed.
- Hanging zones: give the split between long hanging for coats and dresses and short hanging for shirts. Long hanging needs its own vertical run.
- Drawers: state how many, whether they are internal or visible from the front, and whether anything deep has to fit.
- Shelving: note shelf heights for folded stacks, boxes and luggage, plus any adjustable spans you want.
- Lighting: if you want interior lighting on a door opening or a motion sensor, flag it now so we can allow for the wiring route in the carcass.
Match the Finish to the Rest of the Joinery
Where the wardrobe has to sit alongside kitchen cabinetry, vanities or wall paneling from the same package, send the finish reference for those items as well. Frame colour and glass tint are read against each other across a room, so a bronze frame next to walnut veneer cabinetry needs to be decided as one decision.
Our Walnut Veneer Wardrobes and the wider veneer, lacquer, acrylic and melamine wardrobe ranges are all available in project-specific finishes, which makes it practical to carry one timber tone through from the kitchen into the bedroom. When you supply a sample or a brand-and-code reference rather than a description such as "warm brown", we match against that reference instead of guessing.
Send physical references when you can. A glazing sample, a frame finish coupon, or a manufacturer code removes the ambiguity that colour names create between teams working in different countries.
Say Who Measures, Who Delivers and Who Installs
This is where custom wardrobe projects most often lose time. Confirm in writing:
- Who takes the final site measurement — us or your site team — and at what stage the opening will be finished enough to measure.
- The delivery address, access route and lift or stair constraints for long panels.
- Whether installation is by your trades or ours, and who is responsible for making good around the frame.
For projects outside China we handle logistics and door-to-door delivery, including packaging, container loading and customs paperwork, and we provide installation and after-sales support. Confirm the delivery terms, duties and installation scope for your site at quotation stage, since these depend on the destination and the building.
What a Complete Brief Looks Like in One Pass
- Room drawings or annotated photographs of the opening, with dimensions at multiple points.
- Glass type and frame colour, plus the finish reference for adjacent joinery.
- Door type — hinged or sliding — with the clearance that drove the choice.
- Internal layout: hanging split, drawer count, shelf spans, lighting.
- Delivery address, access notes, and who installs.
- Programme dates: when the opening will be ready, and when the wardrobes are needed on site.
Send that and we can return drawings and a quotation against a defined scope rather than a set of open questions. If you are specifying wardrobes as part of a wider villa or hotel fit-out, our turnkey project service covers design coordination, production and site delivery under one package.
Contact SANTERSON with your drawings and finish references, and we will confirm the specification before production starts.