A one piece toilet looks simple on a specification sheet, then quietly decides whether a bathroom still works five years after handover. When an enquiry arrives that only says "supply ceramic WCs", the questions come back the same day: which drain, which rough-in, which room type, which spares. The gap between a smooth installation and an expensive re-order is usually the quality of the first brief. Here is what to put in front of your furniture and building materials manufacturer when the line item is a washdown one piece toilet, using our 1003A model as a working example.

Start With the Drain, Not the Style

Colour, glaze and profile are the easy decisions. The one that causes most rework on site is the waste connection, because a one piece toilet has to match the outlet already cast into the slab or wall of each room type. On our washdown one piece toilet, model 1003A, the same bowl is offered in two configurations:

  • P-trap, wall drain — for bathrooms where the waste leaves through the wall. The connection centre sits 180 mm above finished floor level.
  • S-trap, floor drain — for bathrooms where the waste drops through the slab. The connection centre sits 250 mm from the finished wall face.

Send a marked-up room schedule that states, for every bathroom type, which arrangement exists and what the measured dimension is. On renovations, take that measurement from the completed floor or the finished wall face, not from the structural slab. A 30 mm discrepancy reads as nothing on a drawing and as everything once the pan will not sit back against the wall.

What Belongs in the Brief

A brief that lets a factory quote accurately the first time covers seven points. Written as questions, they are the ones we ask on every ceramic enquiry:

  • Quantities by room type. Guest WCs and main bathrooms rarely carry the same specification, so give counts per type rather than one project total.
  • Trap type and rough-in dimension for each type, with drawings — or a photograph of the existing outlet on renovation work.
  • Cistern or flush arrangement. Exposed cistern, low-level pan connector, or concealed frame are different products, not variations of one.
  • Seat specification. Soft-close or standard, quick-release hinges for cleaning crews, and whether seats ship fitted or boxed separately.
  • Finish expectation, plus a colour reference if basins or vanities are already on site in another white.
  • Documentation required at handover — certificates, packing lists keyed to room numbers, carton marking that matches the unloading sequence.
  • Delivery address and phasing. A hotel tower and a villa compound load very differently.

Where a point is genuinely unknown, say so in writing rather than leaving it blank. An explicit unknown lets us propose two compliant options; a blank cell gets filled with an assumption that surfaces at installation.

Reading the Product Sheet Without Over-Reading It

Catalogue pages describe bowls in adjectives; a procurement file needs nouns and numbers. This is how the 1003A sheet reads once the marketing language is stripped back to what actually affects installation:

Model1003A, one piece washdown toilet
BodyVitreous ceramic with a glossy glaze; the seamless one piece moulding removes the joint between pan and shroud that two piece pans carry
FlushingWashdown action, described as strong cleaning performance at efficient water use
Waste optionsP-trap wall drain (180 mm rough-in) or S-trap floor drain (250 mm rough-in)
Certification stated by the manufacturerCE. Request the certificate that accompanies your shipment rather than relying on a catalogue image.
Applications named on the product pageHouses, villas, hotels and commercial restroom renovations

Two cautions apply to any sheet you receive, ours included. A certification mark printed in a catalogue does not prove the certificate covers the batch being shipped — ask for the document matched to the consignment. And flushing or water-performance figures should be checked against current technical documentation before they enter a tender submission, because plumbing requirements differ between regions and no supplier can certify compliance on your behalf.

Specify the Wet Areas as a Set

A toilet ordered in isolation tends to arrive as an orphan: the seat does not suit the basin range, the tapware finish sits slightly off from the accessories, and the lighting schedule was written by a different consultant. Coordinating wet areas as one package saves freight and shortens the snag list. Our ceramic range covers washdown one piece toilets in several body styles alongside wall hung WCs, basins, vanities and shower systems, so a single drawing set can be matched across rooms. Where the same project also needs joinery, flooring, lighting and outdoor furniture, our turnkey solutions bring villa, hospitality and office scopes under one procurement team.

Settle Spares Before You Sign

Toilets are specified once and maintained for fifteen years. Seats, flush valves and fill sets wear out long before the ceramic does. Two clauses in a purchase order protect you later: a spare-parts allowance held on site, sized against the installed count, and written confirmation that the same seat and valve pattern stays available for reorder. On hotels and managed residential blocks, ask us to record spare part codes against the room schedule so maintenance can order a part without removing a cistern lid to identify it.

Pre-Order Checklist

  • Room schedule with trap type and rough-in for every bathroom type
  • Approved finish reference or physical sample on file
  • Written confirmation of the certificates that will travel with the shipment
  • Packing marked by floor or room, not by carton count alone
  • Spare parts allowance and reorder codes agreed in writing
  • Delivery phasing matched to site access and storage capacity

Questions We Are Asked Most

What actually differs between one piece and two piece?

A two piece pan has a separate cistern fixed to a shroud, leaving a joint that collects dust and cleaning residue. A one piece moulding joins those elements in a single body, so there is no crevice to scrub and the profile sits cleaner against the wall. Installation logic is otherwise the same: both need the correct trap and rough-in.

How do I tell whether a room needs P-trap or S-trap?

Follow the waste pipe. If it leaves through the wall, specify P-trap and measure up from the finished floor. If it drops through the floor, specify S-trap and measure out from the finished wall face. Measure before the brief goes out, not after the cartons land.

Can one model carry an entire hotel project?

It can, as long as both trap options are ordered against the correct room types and the cistern or frame arrangement matches each wall build. Most projects standardise on one or two bowl styles and vary only the waste connection.

Send us your bathroom schedule. Give quantities per room type, trap arrangement and rough-in dimensions, and we will quote against the 1003A or a closer matching model in our ceramic range. SANTERSON has manufactured furniture and building materials since 2008, with custom and OEM service, door-to-door delivery and after-sales support coordinated by one project team.

Phone / WhatsApp: +86-13928214007 (PHILLIP)  |  Email: santerson@qq.com  |  Contact page