A shell nearly 8.5 m long is not a catalogue item you drop on a deck and wire up. Before we put Outdoor Swim Spa WS-PC08ST-L into production, the buyer and our engineering team sign off a written specification covering size, equipment options, site interface and delivery. This is the checklist we work through with project purchasers, contractors and distributors, together with the figures published for this model so you know which items are settled and which still need your decision.

Why "Custom" Changes What Has To Be Agreed

A standard configuration means you accept our specification sheet as published. A custom order — a different option set, a branding programme, or a shell adapted to an awkward terrace — means the specification is written for your project, and production only starts once that document is closed. For WS-PC08ST-L the practical consequence is simple: every line in the table below either matches our published listing or is recorded as an agreed change on your order. Nothing is carried into manufacture on an assumption.

The Published Baseline You Are Starting From

WS-PC08ST-L sits in our configurable outdoor swim and hydrotherapy range. These are the values shown on the product page today; read them as the starting point of the conversation.

ItemListed for WS-PC08ST-LWhat to confirm before production
Overall dimensions8490 × 2400 × 1470 mmCabinet footprint against your deck or plinth drawing, and whether the unit sits above ground, semi-recessed or fully recessed
Total power6.55 kWWhether heating is inside that figure; a selected heat pump adds to the connected load
Jet total6 pcsJet type and position against seat layout and how the spa will actually be used
Filter pump1 pcFiltration cycle time for the water volume and any local runtime rules
Water pumpNot listed on the pagePump count, flow rate and swim-jet duty must be stated in writing before ordering
LED lights4Colour mode, control integration and any change to underwater placement
Control system1 setPosition of the controller and whether wall-mounted or remote control is preferred
Swim training system1 setResistance setting and swim channel length against the user profile

The water pump line reads "Not listed" on our own page, which is exactly the kind of gap a sign-off sheet exists to close. Where the listing is silent, we state the item explicitly on your order rather than leaving it to interpretation.

Site Interface: Structure, Drainage and Access

A cabinet of this length carries a full water load, so your designer needs our dimensions before the deck or slab is detailed — not after. We confirm the installation condition first, then agree the load path and maintenance access.

  • Load capacity of the timber deck, concrete plinth or paved terrace, calculated with water, occupants and cabinet weight
  • Level tolerance, plus perimeter drainage or overflow provision where the site requires it
  • Access panels or removable cabinet sections so pump, filter and controller stay serviceable
  • Insulation package for cold or exposed sites — offered as an option in this range
  • Steps and entry height, which matter for children and older users on a raised deck

Power, Heating and Water Treatment After Options

The 6.55 kW figure is what your electrician starts from, but the final supply requirement is only fixed once the option list is closed, because options change the electrical load.

  • Supply voltage, phase and frequency for the destination country; breaker size and cable run
  • Whether a heat pump is included — if so, its rating is added to the connected load
  • Ozone as part of this range, with UV sterilization available as an option
  • Sand filtration as an alternative filter arrangement where the site supports it
  • Location and mounting of the control system
Our catalogue lists control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps as options for this range. Availability and compatibility differ by model, so each option is confirmed against the specific configuration you are ordering before it enters production.

When a Custom Shape Replaces a Standard Shell

If an angled terrace or courtyard corner rules out a rectangular shell, the discussion moves from configuration to genuine customisation. Our Customizable Shape Outdoor Spa covers square, round, oval and curved forms on an acrylic shell with structural reinforcement, for gardens, terraces and leisure areas. That route adds shell geometry, tooling, seat layout and a longer design-approval loop, so the shape has to be frozen before production time can be quoted.

Standard Configuration or OEM Programme

Distributors and hospitality groups frequently need more than a specification change. Through our Custom & OEM Service, buyers agree cabinet finishes, branding and packaging with flexible order quantities instead of a single fixed SKU. If length rather than features is the deciding factor, compare this model with Outdoor Swim Spa WS-PC08ST, the shorter body in the same family; the wider Swimming Pools and Swim Spas range lists every shell size we hold.

Delivery, Lifting and Handover

An 8.5 m cabinet is a freight decision as much as a product one. Our logistics service covers sea, air and rail forwarding, packaging and container loading, customs paperwork and door-to-door delivery. For this model, confirm the shipping mode, the lifting plan at destination and who places the unit on site — all agreed case by case with your project, not assumed from marketing copy.

Sign-Off Checklist Before Production Begins

  • Model code and shell size confirmed, dimensions cross-checked against the site drawing
  • Option list closed: heat pump, UV, filtration type, insulation, steps, control placement
  • Electrical schedule agreed, including total connected load after options
  • Jet count, seat layout and swim training settings recorded on the order
  • Structural and drainage details accepted by the site contractor
  • Branding, finish and packaging fixed if the order runs through OEM
  • Freight mode, lifting plan and installation responsibility named in writing

Send us your site drawing and the intended use — daily lap swimming, family hydrotherapy, or a resort amenity — and we return a configuration sheet for WS-PC08ST-L with every open item resolved, so production starts on an agreed specification rather than an assumed one.

Talk to our project team

Contact PHILLIP for configuration sheets, option pricing and freight planning on custom outdoor swim spas.