A smoked glass wardrobe with an aluminium frame is one of the easiest items in a joinery package to get wrong in transit. The panels are large, flat and brittle; the frames are long and easy to dent; and the set usually arrives by sea on a shared container with cabinetry, flooring and lighting. Before you release a purchase order, it is worth putting the same attention on the packing specification that you give to the glass tint or the frame finish. The checklist below follows the way these wardrobes are actually made and shipped as made-to-measure built-in furniture.
Why this product type needs a written packing spec
Our Smoked Glass Aluminum Frame Wardrobes are supplied to project-specific dimensions, with the layout, frame colour and glass selected per space. That flexibility is the reason there is no single standard carton for them. Each set is built to a drawing, so each set also needs a packing plan drawn from that same drawing: which panels travel together, how many leaves per bundle, where the hardware travels, and what the crate looks like when it lands on site.
Ask for the packing proposal in writing before production starts, not after goods are finished. A supplier who can show you the crate build, the glass protection method and the loading sequence is a supplier who has already thought through your job. Get these points confirmed:
- Flat-packed or assembled. Confirm whether carcasses and doors ship knocked down or partly assembled, and which choice applies to each wardrobe in your set. Assembled bodies save site labour but take more volume; flat packs are easier to consolidate with other joinery.
- Glass protection. Ask how each smoked glass leaf is separated and supported: interleaving material, edge protection, corner boards, and whether the glass travels loose or fitted into the frame.
- Frame protection. Aluminium stiles and rails mark and dent easily. Confirm the wrapping at the profile ends and that frames are not stacked directly against one another.
- Crate type. State whether goods go in plywood crates, timber-framed cases or carton-on-pallet, and how the crates are braced for a multi-week sea voyage rather than a local delivery.
- Hardware packing. Slides, hinges, handles, rails and adjustment parts should be boxed separately, bagged by wardrobe and listed against the crate they travel in.
Marking that lets anyone on site find the right crate
Made-to-measure wardrobes are usually delivered as a set of similar-looking cases. If the crates only say "wardrobe", your installer is opening boxes at random and hoping the sizes match the rooms. Put the identification on the outside of every crate, in large lettering, before loading:
- The room or unit reference from the approved shop drawing, matching the drawing numbering your site team already uses.
- Crate number out of total for that wardrobe, so a missing piece is obvious on arrival.
- Glass and fragile marking on every crate holding glazed leaves, plus orientation arrows.
- Frame finish and glass type stencilled on the crate, so a bronze-frame case is never mistaken for a smoked-glass case in the store room.
Ask for a packing list that mirrors those same references. A list keyed to "Crate 3 of 5, Master Bedroom B" can be checked against the delivery in minutes; a generic quantity sheet cannot. For multi-unit jobs, this is also what your site supervisor will use to release crates room by room instead of opening everything at once.
Consolidating wardrobes with the rest of the fit-out
Wardrobes rarely travel alone. In a villa or apartment package they share a container with kitchen cabinets, doors, panelling, flooring and lighting, and the stacking order matters: heavy cabinetry crushing a glazed wardrobe crate is a loss nobody recovers quickly. If your supplier also provides the other finishes, ask them to plan the load as one job and confirm which items are loaded last so they come off first.
That is one of the practical reasons buyers consolidate scope with a single One-stop Furniture and Building Materials Supplier. Our team handles the freight forwarding, customs paperwork, packing and container loading, and door-to-door delivery for these packages, so the wardrobe crates, the cabinetry and the wall finishes are sequenced by one planner rather than three. The service detail is on our Furniture Logistics and Door-to-door Delivery page.
What to agree before goods leave the factory
Inspection of glazed joinery is much easier in the factory than on site. Agree the check points and who signs them off:
| Point | What to confirm |
|---|---|
| Pre-shipment photos | Photographs of each wrapped wardrobe and crate, showing glass edges intact and frames protected, sent before the container is loaded. |
| Spare parts | Whether matching touch-up material for frame finishes and any spare hardware are included, and which crate they travel in. |
| Loading sequence | The crate order in the container, with glazed wardrobe crates kept clear of heavy cabinetry and not under point loads. |
| Documentation | Packing list, commercial invoice and shipping documents all using the same crate references as the stencilled marking. |
| Arrival check | What to photograph at delivery and how damage claims are raised, so a claim is supported rather than argued about. |
One more practical point: keep the crate marking and packing list references identical to your shop drawings. When a replacement leaf or an extra shelf has to be made later, those references are what let the factory match the original frame finish and glass without remeasuring on site.
Related wardrobe options in the same collection
If you are specifying several room types, it is worth reviewing the neighbouring finishes early so the crates, fixings and detailing stay consistent across the job. Within our glass-and-aluminium range, buyers commonly mix Clear Glass Aluminum Frame Wardrobes for brighter rooms with the smoked option where a softer, more reflective surface is wanted.