Outdoor Swim Spa WS-PC07A is a 7000 × 3000 × 1470 mm acrylic-shell unit in our configurable swim and hydrotherapy range. Two buyers can order the same model number and end up with very different installations, because almost everything around the shell is selected at quotation stage: how the water is circulated and treated, how the cabinet is insulated, what the site electrical supply can deliver, and how the unit reaches the property and gets set down. The checklist below follows the decisions we work through with project buyers, contractors and villa developers on a normal enquiry.

Start With the Model Variant, Not the Options List

The first question is which variant you are actually specifying. WS-PC07A and Outdoor Swim Spa WS-PC07A-T share the same catalog shell size, but the specifications published for them differ in ways that change how you use the water:

Specification shown on siteWS-PC07AWS-PC07A-T
Catalog dimensions7000 × 3000 × 1470 mm7000 × 3000 × 1470 mm
Swim training systemNot listed for this model1 set
Water pump4 pcs1 pc
Filter pump1 pc1 pc
Jet total62 pcs56 pcs
LED lights14
Total power9.55 kW11.55 kW

Read that table as two different briefs. The -T variant is specified with a swim training system and more underwater lighting; the standard variant carries more water pumps and jets, which points the budget towards massage and hydrotherapy use rather than lap swimming. If your client wants daily swim training in a seven-metre footprint, raise it before options are priced, because that is a variant decision first and an accessory decision second.

Water Treatment and Circulation

Ozone treatment appears in the standard feature set for this model. Catalog-listed options around it include UV sterilisation, water pumps, sand filtration and control systems — see our swim spa range for how these are configured across models. Go through the items line by line rather than as a bundle, because they decide what the owner has to do every week once the spa is handed over.

  • Sanitisation route. Confirm whether ozone alone suits the expected bather load, or whether UV sterilisation should be added. A shared villa or a small hotel pool will not behave like a family plunge pool.
  • Filtration type. Sand filtration is listed as an option; agree the filter pump duty and the backwash access point at the same time, since maintenance access is a site decision, not a factory one.
  • Control system. One control set is specified. Decide where it is mounted, whether the owner needs remote operation, and who runs the wiring to it.

Availability and compatibility of these accessories vary by model, so we confirm each item against the selected configuration in writing before production starts.

Heat, Insulation and Running Cost

Total power is listed as 9.55 kW for WS-PC07A and 11.55 kW for WS-PC07A-T in the published specifications. Heat pumps and insulation are separate catalog options, and this is where buyers most often under-specify. Ask three questions:

  • Is a heat pump included in the quotation, or is the unit being supplied without heating?
  • What insulation is specified for the cabinet and shell, and does the local climate justify a heavier specification than the standard build?
  • What electrical supply does the site have — single phase or three phase, what breaker rating, and where is the isolator?

Send us your site's electrical details with the enquiry. Confirming included equipment and electrical requirements for the selected configuration before order confirmation avoids a second crane visit, an electrician coming back, and a delayed handover.

Access, Steps and Surrounds

Steps are listed as an option. Alongside them, settle these site items early:

  • Entry and egress. Internal steps, external steps or both, and which side of the unit they sit on relative to the terrace, pool deck or garden view.
  • Cabinet finish. The visible cladding faces your deck, so agree the colour and material against the surrounding paving, pergola or outdoor furniture scheme at drawing stage.
  • Plant room and access. Pumps, filter and controls need a serviceable access route. A spa set into a deck with no removable panel is a maintenance problem for years.
  • Cover. Some models in this range carry an automatic cover option; if you want one on this unit, ask us to confirm availability for the selected configuration rather than assuming it.

Where a rectangular footprint does not suit the site, our Customizable Shape Outdoor Spa range covers square, round, oval and curved shells in acrylic with structural reinforcement, which is a practical fallback for terraces and irregular garden corners.

Logistics and Installation Scope

A seven-metre spa arrives as a large single piece, so transport is a specification item. Discuss:

  • The delivery address, route access and whether a crane or hiab is needed to set the unit down.
  • Incoterms, and who handles customs clearance, duties and on-site lifting.
  • Who pours the slab or footings, and when we must confirm base dimensions and load points.
  • Commissioning: who fills, tests and hands over the water system, and which spares travel with the container.

Our one-stop solution service runs from design consultation and product specification through manufacturing, project management and site coordination to installation and handover. We do not state a transit time or warranty term in an article; those are confirmed per project and per destination.

A Short Briefing Checklist for Your Enquiry

  • Model variant and intended primary use: swim training, hydrotherapy, or both.
  • Site drawings with the spa position, access route and plant access.
  • Electrical supply details and preferred control placement.
  • Sanitisation and filtration choice for the expected bather load.
  • Heating and insulation level for the local climate.
  • Steps, cabinet finish and any cover requirement.
  • Delivery terms, lifting method and commissioning responsibility.

Send those seven items with your enquiry and the quotation comes back with the configuration locked down rather than a base price plus a list of unknowns. If you are furnishing a villa or hospitality project as a package, we can coordinate the spa alongside outdoor furniture, bathroom ceramics, lighting and joinery under one turnkey project scope.

Specify WS-PC07A for your project

Send your site drawings, electrical details and intended use, and we will confirm the configuration, options and delivery scope for Outdoor Swim Spa WS-PC07A before production. Contact PHILLIP on +86 13928214007, or email santerson@qq.com.