A request for quote for a built-in media wall rarely fails on price alone. It fails because the panel size, the screen it has to hold, the wiring behind it and the finish on its face were never written down together. If you are specifying Santerson Integrated TV Panels for a villa, hotel suite or lounge, the quality of the quotation you get back depends almost entirely on how complete your enquiry is. The list below is the information our estimating team needs to price the job properly and to avoid a re-cut panel arriving three weeks before handover.
Start with the wall, not the product
Integrated TV panels are made to the opening they sit in, so the wall governs everything else. Send the wall's finished width and height, the floor-to-ceiling dimension if the panel runs full height, and a sketch or marked-up drawing showing where the panel starts and stops relative to doors, skirting and any return wall. Note the construction of the substrate as well — masonry, stud partition, existing plasterboard — because that determines the fixing detail and whether additional backing is required.
Two dimensions are routinely missing from first enquiries: the setting-out of any reveal or shadow gap, and the finished floor level. Both change the cut sizes. If your drawing shows structural rather than finished dimensions, say so on the enquiry.
State the screen and how it will be mounted
Tell us the display you intend to install — diagonal size, rough weight, and whether it is a consumer panel or a commercial display. Then state the mounting method: fixed bracket, tilt bracket, articulating arm, or a flush recessed mount set into the panel build. A heavy display on an articulating arm needs solid backing behind the fixing points, and that reinforcement has to be designed in from the start; it is not something that can be added once the panel face is finished.
If the screen will sit behind a closing front — as in our Santerson Sliding Panel TV Systems — say so explicitly. Sliding fronts change the clearance needed for the bracket, the track detail and the ventilation allowance for the display.
Cover services, sockets and access
The panel has to accommodate what plugs into it. Please provide:
- The number and type of connections behind the panel: power outlets, HDMI, network points, TV aerial or satellite feed.
- Whether those points sit inside the panel zone or in an adjacent cabinet, and their heights from finished floor.
- Where a device bay is needed — set-top box, console, soundbar, AV receiver — and whether it needs ventilation openings or a removable access panel.
- Cable routing: concealed trunking inside the build, an open chase, or surface containment on the wall.
If you have not decided these yet, mark them as "to be confirmed" rather than leaving them out. A quotation that assumes a service layout you later change is the most common cause of variation costs on media wall packages.
Specify finish and storage around the panel
Integrated TV panels sit inside a wider joinery composition, so tell us what they connect to. Specify the surface finish you want — veneer, lacquer, laminate or textured melamine — and whether it must match cabinetry elsewhere in the project, in which case supply the reference or existing sample. Confirm sheen level and edge treatment if you have a house standard.
Then describe the storage around it. A media wall combining open display niches with closed cabinets behaves differently from a plain panel: our Santerson Full Height Media Walls and Santerson Storage & Display Combo listings cover those combinations, and each needs its own internal layout. List the drawer, shelf and door requirements, and note any integrated lighting — including Santerson Backlit Feature Walls or Santerson Integrated LED Media Units — so the transformer position and switching can be included.
Give the commercial details we need to quote
The following determine lead time, packing and price, and we cannot estimate them from a product name alone:
| Item | Why it matters |
|---|---|
| Quantity of each configuration | One bespoke panel and a repeated hotel-floor type are quoted and packed differently. |
| Project location and delivery address | Sets freight mode, packing specification and whether door-to-door delivery applies. |
| Preferred Incoterms and delivery terms | Clarifies who carries freight, duty and insurance from our works to site. |
| Required on-site date, working backwards from your programme | Fixes the production slot and lets us flag clashes before you commit. |
| Whether installation is included | Tells us whether to price site fixing, snagging and handover support. |
| Your company, contact name and a working email | Required for formal quotations, drawings for approval and purchase orders. |
Send drawings in PDF or a native CAD format where possible, with dimensions in millimetres. Photographs of the existing wall, including the corners and any services already on it, help more than an unmarked floor plan.
What you should expect back
For a media wall package you should receive an itemised quotation covering each panel configuration and cabinet module separately, rather than one lump sum. Production drawings follow for your sign-off before manufacture begins; check those drawings carefully, since they are the point at which dimensions, service positions and finishes become fixed. Our Custom & OEM Service covers bespoke sizing, material and finish selection for exactly this kind of project-specific work, and where the panel forms part of a wider fit-out our Turnkey Solutions team coordinates it with the rest of the joinery and furniture.
Before you send the enquiry: a quick check
- Finished wall dimensions, including floor-to-ceiling height where relevant.
- Substrate type and any required backing or reinforcement.
- Screen size, weight and mounting method.
- Socket, data and signal positions with heights, plus device bay requirements.
- Finish specification and any existing sample or reference to match.
- Storage layout: shelves, drawers, doors, lighting and access panels.
- Quantities, delivery address, Incoterms and required on-site date.
- Whether installation and snagging are in scope.
Frequently asked questions
- Can you quote from a photograph alone?
- We can give an indicative figure, but a firm price needs finished dimensions and the service layout. A photograph on its own usually leads to a quotation that changes once the site is measured.
- Do you supply other wall systems in the same collection?
- Yes. Integrated TV panels form part of our Media & TV Walls range, which also includes full-height media walls, floating units and backlit feature walls for residential and hospitality projects.
- What if my electrical work is not finalised?
- Send the enquiry with those items marked as to be confirmed. We will quote the panel build on the assumption we state in writing, and re-price only what actually changes.
A complete enquiry shortens the loop between first contact and approved drawings. Send your dimensions, screen details and finish references together, and our team can return an itemised quotation with production drawings for review — email Contact Us to start.