A cherry-toned wardrobe looks resolved on a render and in a sample photo. It only becomes a defensible purchase once the project team can state, in writing, what the doors are made of, how the carcass is fixed, which hardware opens them and what happens if a panel is damaged in transit. Those four answers decide whether Cherry Solid Wood Wardrobes are approved quickly or sent back for rework.

Wardrobes sit in the awkward middle of a fit-out package. They are not loose furniture that can be swapped at the loading dock, and they are not fixed joinery drawn by the builder either. They arrive made to measure, get installed once, and then live in the room for years. Approving them on a picture alone is how change orders start.

Start with the specification sheet, not the finish name

"Cherry" describes a colour and grain direction far more often than it describes a species. Before sign-off, ask the supplier to state, for each visible component, whether the part is solid timber, an engineered board with a wood veneer face, or a printed decorative surface. Our Solid Wood Wardrobes collection is offered with material and finish options selected per project, so the same wardrobe line can be quoted at very different prices depending on what the customer actually specifies.

The practical test is simple: request one named construction for doors, one for carcass panels and one for interior boxes, and have all three repeated in the order confirmation. If a finish name appears in the drawing but no construction appears next to it, that is an open item, not a detail.

Confirm made-to-measure dimensions against site conditions

Our wardrobe units are made to measure, with the layout tailored to the space. That flexibility is the reason they fit awkward bedroom alcoves and sloping ceilings, and it is also why dimension errors are expensive. Approval should follow site-verified dimensions, not architectural dimensions taken from a drawing set that predates the flooring and plasterboard.

Dimensions and site conditions

  • Finished floor level and finished wall face, measured after screed and plasterboard are in place.
  • Clearance for skirting, architraves, curtain boxes and any ceiling cornice the wardrobe butts against.
  • Position of switch plates, sockets, air-conditioning outlets and recessed lights that fall inside the wardrobe envelope.
  • Door swing or sliding track zone checked against the bed, the bathroom door and the circulation path.

Where a bedroom has a walk-in layout rather than a wall run, confirm the layout family before dimensions are locked. A Boutique Style Walk in Wardrobe is set out around circulation and display, which changes both the panel schedule and the interior fittings compared with a straight hinged run.

Fix the hardware list before the order is placed

Hardware is the most commonly downgraded line on a wardrobe quotation because it is quoted as an allowance. Ask for make, model and load rating on hinges and slides, and confirm soft-close on doors and drawers if that is what the design intent says. Then check three things against the drawing: drawer widths against the hinge cup position, tall pantry or pull-out heights against the slide rating, and mirror or glass elements against the door weight.

For projects that mix cherry timber doors with glazed fronts in the same bedroom, hardware choice also affects the neighbouring units. Compare against Clear Glass Wardrobes in the same package so that hinge series, handle profile and edge detailing match across rooms instead of being resolved twice.

Agree the interior layout with the end user, not the render

Interiors are where a wardrobe is judged daily. Hanging heights should be set from how the resident actually stores coats, shirts and long garments; shelf depths should suit folded linen rather than a generic 350 mm default; drawer count should reflect whether the room serves one person or two. Where the brief leans towards storage density, an equivalent Drawer Focused Modular Wardrobe layout can be quoted in the same finish so the team compares layouts on function rather than appearance.

Close out logistics, installation and after-sales in writing

Solid timber panels travel differently from flat-pack cabinetry. Before approval, confirm how units are packed, whether they ship assembled or knocked-down, which party carries the lift to floor, and who signs the goods off on arrival. Record what is covered if a panel arrives damaged and how a replacement panel is matched to a batch already on site; colour and grain matching on a cherry finish is far easier when the same production run covers both.

Our scope runs from design and custom/OEM production through door-to-door delivery, installation support and after-sales support, which means one party owns the sequence instead of three. That matters most on villa and hospitality packages, where wardrobes, interior fixtures and cabinetry land in the same window and must be installed in a sensible order.

Approval checklist before the wardrobe order is released

  • Named construction for doors, carcass and interior boxes, repeated in the order confirmation.
  • Site-verified dimensions with finished floor and wall faces confirmed.
  • Hardware schedule with make, model, load rating and soft-close stated.
  • Interior layout signed off by the end user with hanging heights and shelf depths noted.
  • Packing, delivery, lift-to-floor, damage replacement and installation responsibility agreed.

Teams that clear these five items in one review usually approve a cherry wardrobe package without a second round of drawings. Teams that skip them tend to discover the questions after the panels are on the delivery vehicle.

Specifications, material options and service scope are confirmed per project. Contact SANTERSON with your drawings and site dimensions for a written quotation.