Open shelving in a bathroom looks simple on a drawing, which is exactly why it causes trouble at handover. Towels do not fit the shelf depth you specified, the recess turns out narrower than the shop drawing assumed, and the finish that matched the sample board does not match the vanity beside it. Before you place an order for Santerson Open Storage, the questions below are the ones that decide whether the unit lands correctly the first time.

1. Which room and which project type is this unit for?

The Santerson Open Storage page describes the product as part of the Storage Units collection for residential bathroom projects, with project-specific dimensions and finish options. That framing matters when you write your enquiry. A guest bathroom in a villa, a main family bathroom and a service bathroom all take different shelf mixes, and the same unit behaves differently once it sits next to a shower enclosure rather than a basin.

State the room type, how many bathrooms share the same design language, and whether the units are for one dwelling or repeated across several. Repeating a configuration across rooms is where standardised dimensions save both time and cost.

2. What are the finished dimensions, and how were they measured?

The product is offered as made-to-measure, so accurate dimensions are your responsibility. Before ordering, confirm:

  • The clear opening width and height after tiles, plasterboard and any waterproofing are installed, not the structural frame dimension.
  • The required depth, checked against what you intend to store: folded towel stacks, toiletries or linen.
  • The shelf positions you want, and whether they should be fixed or adjustable.
  • Whether the unit is recessed into a wall, built into a vanity carcass, or surface mounted.

Send your own measured drawing rather than relying on a generic size. If a designer produced the drawing, ask them to mark which dimensions are finished-face dimensions and which are rough openings.

3. Which material and finish are you actually specifying?

Material and finish options are listed on the configuration for this collection. Rather than choosing from a name alone, ask for the substrate and the surface treatment, and check how that finish behaves in a humid room near showers and basins. Specify the shelving alongside the bathroom sanitary fixtures, vanities and tapware already selected, not as a separate afterthought.

A practical step: request the finish sample and hold it against your vanity door, wall tile and floor finish in the actual room lighting before you sign off. Where matching matters, ask for the same finish code across related items so that shelving, Santerson Drawer Units and any closed storage read as one set.

4. Open, closed or a mix: which do you need in each room?

Open display is a design decision with an everyday consequence, because everything stored on it stays visible. A workable rule for residential bathrooms is to keep open shelving for items you want on show and deliberately store the rest behind doors or in drawers. The Storage Units collection also includes Santerson Corner Storage for awkward junctions, Santerson Freestanding Cabinets where wall fixing is not possible, and Wall Mounted Cabinets for enclosed storage.

Decide this room by room before you order. Open shelving specified in the wrong bathroom is the item most often changed later.

5. What has to be confirmed about fixing and site conditions?

The product page asks buyers to verify dimensions, basin and countertop fit, materials, lighting, hardware and installation requirements for each selected configuration. Treat that list as your pre-order checklist.
  • Wall construction: what sits behind the fixing line: stud, brick, or a cavity that needs blocking or a specific anchor?
  • Basin and countertop fit: does the shelf clear the tapware, the mirror and the door swing?
  • Hardware: which brackets, fixings and edge details come with your configuration, and which are supplied on site by others?
  • Services: confirm no concealed pipe, waste or electrical point sits where the unit is fixed.

These points sit on the boundary between our scope and your builder's. Settling them in writing before production avoids a site visit that solves nothing.

6. How does this unit fit into the rest of your order?

A bathroom rarely fails on one item; it fails on coordination between several. Ordering shelving together with one-stop furniture and building materials supply means vanities, ceramics, cabinetry and wall and floor finishes run on one production schedule and one shipment, with one point of contact for the fit-out.

If your drawings are still developing, interior design services cover space planning, furniture layouts and 3D renderings, so the shelf arrangement can be reviewed in context before anything is cut. For sizes or finishes outside the standard range, custom furniture manufacturing covers bespoke dimensions, materials and finishes.

7. What are you told about delivery and installation?

Ask how the unit is packed and protected for freight, which Incoterms apply to your address, and who receives it on site. Logistics and door-to-door delivery covers freight forwarding, customs paperwork and container loading; ask specifically how a made-to-measure shelf is packed so that edges arrive undamaged.

Then confirm who installs it. Installation and after-sales support describes on-site fitting, snag inspection, spare parts and maintenance. Whichever route you choose, agree in advance who inspects the unit on arrival and who signs off the fixing. On open shelving, a level line checked before fixing saves a re-drill.

8. What should be in writing before production starts?

  • A confirmed dimension drawing with finished-face sizes, shelf positions and mounting method.
  • A named finish and material, matched to the sample you approved.
  • The hardware list and who supplies each part.
  • The delivery address, Incoterms and receiving contact.
  • The inspection and sign-off step for the installed unit.

If you are furnishing a villa or apartment project in Australia, our Australian villa furniture projects show how built-in joinery and bathroom storage were coordinated with the wider fit-out.

Send us the room, a measured drawing and your finish preference, and we will quote Santerson Open Storage to those dimensions with fixing and hardware details confirmed before production. Start an enquiry through our contact page.