A made-to-measure folding door is not a catalogue item you can order off a shelf. The quotation for Santerson Wood Veneer Folding Doors depends on opening dimensions, the folding layout, the veneer and finish you select, and how the doors reach your site. Send the right information in your first enquiry and the supplier can return a clear price with a drawing to approve; send incomplete data and you will spend weeks trading clarification emails.

The list below is what our project team works from when a residential or hospitality client asks for a firm quotation on wood veneer folding doors. Use it as your enquiry template.

1. The opening, not just the door size

Folding doors are assembled from panels that stack to one or both sides, so the number of panels and the space they collapse into matter as much as the width of the gap you want to close. For each opening, please provide:

  • Clear structural opening width and height, measured at several points, with a note on floor finish levels if the screed or flooring is not yet laid.
  • Whether the opening is square and plumb, or whether out-of-tolerance walls need packing on site.
  • The available wall run beside the opening for the panels to stack into, plus the position of any switch, socket, radiator, skirting or light fitting that interferes with the stack.
  • Head height and ceiling construction, so the track can be fixed to a sound substrate rather than to a decorative finish.

A simple sketch on top of the plan drawing, with dimensions in millimetres, removes most of the back-and-forth. Photographs of the opening from both sides help just as much as a formal survey.

2. The folding layout you actually want

Our wood veneer folding doors are made to measure, and the layout is tailored project by project. Tell us how many panels you expect, which direction they fold, and where they park when open. If you are weighing up a bi-fold against a pocket-style or sliding alternative in the same wall run, say so at the enquiry stage — the framing and floor guidance differ, and changing that decision before drawings are issued is far easier than revising panels already in production.

Also confirm how the doors will be used day to day: occasionally opened to link two rooms, or operated several times a day as the main separation between a living space and a terrace. Frequent use points us towards heavier hardware and a different panel build than a decorative screen that is opened a handful of times a year.

3. Veneer species, grain direction and finish

Wood veneer is a surfacing decision as much as a structural one, and the visible result depends on choices you make before the panel is pressed. Please specify:

  • The veneer species or the sample reference you are working from, and whether the grain should run vertically or horizontally across the panels.
  • How matching is expected against other timber in the room — wardrobes, wall panelling, doors, flooring. Send the existing product name or a photograph if you already have those items on site.
  • The sheen level and finish type, and whether edges and stiles are veneer-wrapped or solid-timber edged.
  • Any colour or grain tolerance your client has signed off, since natural veneer varies between leaves.

If you have not settled on the veneer yet, send the mood board or the joinery schedule and we will propose options against it. Our Custom & OEM service covers bespoke material, finish and texture selection alongside prototyping, so an unfinished specification is not a barrier to starting the conversation.

4. Hardware, glazing and interface details

The parts that decide how the doors feel are usually decided last, which is why we ask for them early:

Item to confirmWhy it changes the quotation
Handle and hardware style, finish and colourSets the visible detail and the specification of hinges, wheels and track
Top-hung or bottom-guided operationAffects head structure, floor detailing and threshold levels
Glass panels, inserts or solid panels in the runChanges panel weight, safety requirements and layout limits
Acoustic or privacy requirementDetermines seals, panel thickness and the hardware specification
Locking and child-safety needsAdds specific lock bodies and restrictors to the schedule

Where a fully glazed fold is being considered for the same opening, our Santerson Glass Folding Doors sit in the same collection and are quoted on the same made-to-measure basis. If some openings in the same property need a conventional swing instead, Santerson Wood Veneer Hinged Doors and Santerson Wood Veneer Pocket Doors can be specified to the same veneer, so the joinery package reads as one design rather than three separate purchases.

5. Quantity, phasing and site programme

Give us the number of openings or sets, whether they are identical or each unique, and which rooms need doors first. A handful of one-off villa openings is quoted and produced differently from a guest-floor repetition in a hotel. Flag any phased handover dates so production batches follow the site sequence instead of arriving all at once.

Also tell us who installs. We provide installation and after-sales support, including on-site fitting, inspection and snags, but many projects use their own joinery crew. If your team is fitting the doors, we will send fixing details and setting-out dimensions with the drawings so openings are prepared correctly before the panels arrive.

6. Delivery terms and destination

Doors are heavy, awkward and easy to damage in transit, so the delivery plan belongs in the quotation conversation rather than after it. Please state the delivery address or port, whether the goods go direct to site or to a distributor, and any access constraints such as lift size or stair-only upper floors. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, packaging and container loading, export paperwork and shipment tracking, so we can price the doors landed at your site or to a port — whichever term you are working to.

A quick enquiry checklist

  • Opening width, height and stack space in millimetres, with sketches and photographs
  • Floor finish levels and head construction
  • Panel count, folding direction and parking position per opening
  • Frequency of use and any acoustic or privacy requirement
  • Veneer species, grain direction, finish sheen and matching references
  • Hardware style and finish; glass, insert or solid panel make-up
  • Quantities, room list, phasing and required on-site dates
  • Delivery destination, access constraints and preferred shipping term
  • Who is responsible for installation and site preparation
Send dimensions as measured openings rather than finished door sizes. We convert them into manufacturing dimensions after checking wall construction, floor levels and stack space, which is where most rework on made-to-measure folding doors otherwise comes from.

What you get back

With the information above, the quotation returns the panel build and hardware we propose, the finish schedule, manufacturing dimensions, packaging and freight to your stated term, and a production timeline for your programme. Drawings and a finish sample are approved before the order goes into production, so what arrives on site is what was signed off.

SANTERSON has been manufacturing furniture and building materials in China since 2008, and doors are only one part of the range we supply to villas, hotels and offices. If your project also needs other windows and doors, wardrobes, panelling or cabinetry matched to the same veneer, sourcing them together keeps the timber consistent across the joinery package.

Send your door schedule for a quotation

Email your opening dimensions, drawings and finish references to santerson@qq.com, or reach us on WhatsApp at +86-13928214007 (PHILLIP). Include the project location and required site dates so we can confirm production and delivery in one response.