A built-in wall system looks simple on a drawing and turns complicated on site. Full-height storage walls meet uneven floors, ceiling services, door openings and a client who wants some shelves open and most of the cabinetry closed. The difference between a clean handover and a long snag list is usually what was written down before production started. This guide walks through the sections a procurement brief should contain when the line item is Santerson Full Height Storage Walls, part of the Integrated Storage Walls collection.

What this product line actually covers

The listing describes a full-height storage wall made to measure, with configurable material and finish options, and layout and dimensions specified for each space. That wording matters when you write the brief: there is no standard size sheet to copy, and no fixed finish list. You state the dimensions, the make-up of the wall and the finishes you want, and the manufacturer works to that specification.

The same logic applies across the collection. Santerson Sliding Storage Panels covers a sliding panel front on a configurable wall system, again with made-to-measure sizing and material and finish choices. If your design mixes fixed carcasses with sliding fronts or concealed doors, each of those elements needs its own note in the brief rather than one blanket description.

Related lines sit close by and are often confused with a storage wall in a schedule: Santerson Full Height Media Walls for media and TV applications, Santerson Mixed Open & Closed Storage, and Santerson Open Display Niches. Name the exact product page you are buying against, because the technical questions differ: a media wall carries cable routes and equipment ventilation, a storage wall carries shelf loading and door hardware.

Section 1: scope, rooms and quantities

Start with the boring part. Room by room, list each wall as one line item, with the room name from the drawing, a reference number you can trace on site, and the quantity of linear metres or of complete units. A single row that says "built-in storage, living area" invites three different interpretations from three different trades.

  • Room and level, matching the drawing set revision you are working from.
  • Item reference used consistently in drawings, quotations and delivery notes.
  • Overall width and height envelope, plus whether the wall runs to a true ceiling or to a bulkhead.
  • Whether the item is one continuous run or several units with a reveal between them.

Section 2: dimensions, tolerances and site conditions

Made-to-measure work only works if the measurements are taken at the right moment. State who measures, when, and what the tolerance is around floor level, wall plumb and ceiling height. In renovation work this is where projects lose time: an existing villa rarely has a floor that is level across six metres.

Record the obstructions the wall has to absorb - skirting, architraves, ducting, light switches, sockets, air grilles and door swings. If the storage wall butts into Santerson Textured Panels or another wall finish, say which element is cut back and which one returns into the reveal.

Section 3: layout and internal configuration

Give the manufacturer the make-up of every bay. A short, readable specification beats a picture with annotations scattered over it.

ElementWhat to state in the brief
Open versus closedWhich bays are open shelves, which are doors, and the ratio you want across the run. Open shelving is easier to approve from a rendering; closed cabinetry needs door construction and hardware defined.
Shelf scheduleShelf depths, bay widths, fixed versus adjustable shelves, and what each shelf is expected to hold - books, crockery, linen or equipment.
Doors and frontsHinged, sliding or concealed. Sliding fronts need track type, overlap and clearance; concealed fronts need a note on how the door is opened.
Drawers and accessoriesDrawer counts and sizes, soft-close requirements, pull-out trays, hampers and lighting inside the carcass.
Integrated servicesSockets, USB points, LED strips and transformers, including who supplies and installs the electrical work.

Section 4: materials, finishes and approvals

Because finish options are configurable, the brief should carry a physical or digital sample reference for every surface you care about: carcass colour, door face, edge treatment, visible shelf edges and hardware finish. Ask for a sample pack before order confirmation rather than after, and record the approved sample codes in the purchase order.

Also fix the board make-up and the surface system by name - laminate, lacquer, veneer or glass front - along with any requirement about sheen level and grain direction. Where a project has several interior fit-out lines running in parallel, keep the finish naming identical across schedules so that a wardrobe front, a kitchen door and a storage wall door in the same corridor can be compared properly.

Verification note: product listings for this collection describe made-to-measure sizing and configurable materials and finishes without publishing fixed specifications. Materials, dimensions, hardware and technical performance should be confirmed against your chosen configuration with the manufacturer before you publish or approve a submittal.

Section 5: coordination, delivery and installation

Storage walls are long-lead, site-sensitive items. Put four dates in the brief: measurement date, drawing approval date, production release date and installation window. Then state who protects the wall once it is installed, because other trades are usually still working.

SANTERSON describes itself as a one-stop furniture and building materials supplier, with services covering design coordination, custom and OEM production, door-to-door logistics and installation support. For an importer this is useful in practice: the storage wall, the joinery, the doors and the flooring can come on one shipment documentation set instead of four. Confirm freight terms, packaging, container loading and the delivery address for each project individually; import duties, transit time and on-site installation arrangements should be agreed per contract rather than assumed.

Ask for the assembly sequence and fixing method in writing, together with a setting-out drawing that shows where the wall starts from. A wall specified to the millimetre still fails if the first unit is set out from the wrong datum.

Section 6: inspection and handover

  • Check door alignment, gap consistency and the operation of every leaf before signing off.
  • Confirm sliding fronts run freely along the full width, with no catch at the track joint.
  • Test integrated lighting and sockets with the electrical contractor present.
  • Photograph shelf settings and record approved sample codes for future matching or replacement parts.
  • Log spares you may need later - handles, hinges, shelf pins and a spare panel of each visible finish.

A short checklist before you send the enquiry

If your enquiry can be answered without a phone call, it is ready. It should name the product page, give room-by-room envelopes and quantities, state measurement responsibility and tolerance, list every internal configuration, attach approved finish references, define who supplies electrical work, and set the four dates. Send that and you will get comparable quotations instead of three different interpretations of the same rendering.

Projects that need the wall system coordinated with cabinetry, doors, wall panelling and flooring usually benefit from putting all of it to one supplier early. See the turnkey solutions and contact page for project enquiries.

Send us your wall schedule

Share the room list, dimensions and finish references for your storage wall package and we will confirm configuration options, materials and lead time for your project.

Phone / WhatsApp: +86-13928214007 (PHILLIP)  |  Email: santerson@qq.com