A swim spa is one of the few site-furnished items where a single missing line on a purchase order can change the finished product, the delivery cost and the commissioning plan. If you are sourcing a custom outdoor swim spa for a villa terrace, a resort garden or a private wellness area, the quality of your written brief to the manufacturer decides far more than the brochure you started from. This guide sets out exactly what to send with an enquiry about model WS-PC05ST, and what you should expect back.
Start from the catalogue baseline, then state what changes
WS-PC05ST sits inside our configurable outdoor swim and hydrotherapy range. The published catalogue entry gives you a starting point rather than a finished specification: shell size of 5000 × 2400 × 1470 mm, one control system, one swim training system, one filter pump, six water jets, four LED lights and a total power figure of 6.55 kW, with water jets, LED lighting, ozone and the swim training system shown as fitted features.
Write your brief in two columns. In the first column, copy the catalogue items you accept as they stand. In the second column, list every item you want changed, added or deleted, together with the reason. A reason matters more than the change itself: "heat pump required because the spa sits outdoors year-round in a cool-climate villa" tells our engineers what to verify, while "add heater" does not.
| Brief item | What to state | Why the manufacturer needs it |
|---|---|---|
| Installation setting | Above ground, semi-recessed or fully recessed; terrace, garden, rooftop or indoor plant room | Determines access panels, cabinet protection, insulation and drainage detail |
| Site access | Crane, forklift or manual route from the delivery point to the final position; gate and doorway widths | Affects packaging size, container type and on-site handling plan |
| Water supply and drainage | Cold feed source, overflow route, first fill and drain location | Sets plumbing points before the shell is craned into place |
| Electrical supply | Voltage, phase, dedicated circuit size, isolator location, distance from control system to the distribution board | The catalogue power figure is a baseline for the standard configuration, not a substitute for your local electrical design |
| Water treatment | Ozone as catalogued, plus whether UV sterilisation or sand filtration is required | Optional equipment must be sized and plumbed into the circuit at factory |
| Heating | Target water temperature, season of use, heat pump yes or no, insulation package | Drives energy performance and the commissioning sequence |
| Swim use | Walk-in fitness, lap training or physiotherapy; number of simultaneous users | Confirms swim training system setting and jet layout |
| Finishes | Shell colour, cabinet cladding, step design, lighting colour preference | Fixes production drawings before cutting begins |
| Delivery terms | Destination port or site address, Incoterms you intend to trade on, who clears customs | Sets what is quoted and what your team arranges separately |
| Programme | Site-ready date, required delivery window, any handover milestone | Sequences production, inspection and freight booking |
Name the options you want priced, not just mentioned
Catalogued options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so list the ones you want in writing and ask for each to appear as a separate line on the quotation with its own price. Bundling everything into one lump sum hides what you are paying for and makes later value engineering impossible.
Two questions are worth insisting on before you sign anything. First: which items are included in the quoted price, and which arrive as a separate supply that someone else must install? Second: what is not included in the quotation at all — local plumbing, electrical connection, crane hire, permits. Getting these answers in writing prevents the gap between an approved budget and a working installation.
Send drawings early if the spa has to fit a defined envelope
Where the spa must sit inside a terrace layout, a sunken pit or a covered pergola, send the architectural or landscape drawing that shows the position, not just a photograph of the site. Mark the finished floor levels, the clear opening dimensions and any structural element that cannot be moved. Our team works from drawings on custom and OEM work, so the earlier they arrive, the fewer revisions to production drawings later.
If your scheme needs a different footprint altogether — a curved end, an altered depth, a shape that follows a pool deck — say so in the first message rather than the third. The wider range includes customizable shape outdoor spas in square, round, oval and curved forms with an acrylic shell and structural reinforcement, so a non-standard geometry is a conversation worth having at enquiry stage.
What a competent manufacturer should return
- A quotation that separates base unit, optional equipment and any items excluded from the price.
- A dimensioned drawing or layout for your confirmation before production starts.
- Written confirmation of included equipment and electrical requirements for the configuration you selected.
- A packaging and loading plan matched to the site access you described.
- The documents your import clearance requires, listed by name.
- Commissioning and maintenance guidance for the finished spa, plus how spares are supplied.
Treat vague answers as a specification risk. If a supplier confirms lead times or performance figures without asking about your site conditions, their configuration assumptions are not yet aligned with your project.
Where this fits in a whole-project supply
Swim spas are rarely ordered alone on villa and hospitality work. On most projects they arrive as part of an outdoor package alongside loungers, dining sets and pergolas, plus interior fixtures such as bathrooms, lighting and cabinetry. Ordering them through one one-stop furniture and building materials supplier means a single set of drawings to coordinate, one production schedule and one freight plan — which is where procurement errors usually get caught before they reach site.